US
E-Designation - OER
E-Designation - OER
Office of Environmental Remediation
311
Search all NYC.gov websites
Text-Size
Voluntary Cleanup
E-Designation
New Projects & NNOs
Do I Have an E?
E Fees
Removing Es
City Environmental Quality Review (CEQR)
Share
E-Designation
What is an E-Designation?
A property with an E-designation means that, as a consequence of a zoning action, a property has environmental requirements relating to air, noise or hazardous materials that must be investigated and addressed before an owner can obtain a building permit for the property's redevelopment.
OER manages three E-designations:
Hazardous materials:
This will require soil testing, and if contamination is confirmed, a remedial action plan must be approved by OER before development can proceed, and the plan must be implemented to the satisfaction of OER before occupancy is allowed.
Noise:
This will require the installation of a specific window/wall attenuation and alternate means of ventilation. A remedial action plan must be approved by OER before development can proceed, and the plan must be implemented to the satisfaction of OER before occupancy is allowed.
Air:
This requirement may limit the boiler fuel to natural gas or specify location of the boiler stack. A remedial action plan must be approved by OER before development can proceed, and the plan must be implemented to the satisfaction of OER before occupancy is allowed.
What is a Restrictive Declaration?
A document a property owner records against title that binds current and future site owners to undertake any required testing and remediation as part of the proposed development of a building.
What is the E-Designation/Restrictive Declaration Program?
An OER remedial program under which an owner or developer addresses environmental requirements before a building permit can be issued and a certificate of occupancy obtained.