Active Projects
The time-lapse camera operates on solar power. During periods of reduced sunlight from cloudy daytime weather, it may lose power overnight and require a few hours of daylight in the morning to come back online.
Klamath Falls Campus : Construction Schedule
Anticipated
Project Timeline
Project
Name
Project Location
Anticipated Impacts
Other/Notes
April 15, 2024-
August 29, 2025
New Student Housing
Area between Arboretum and CU. (Tennis Court Area)
Permanent closure/removal of the tennis courts
Early work:
4/15/2024-6/7/2024
Construction:
6/10/2024-8/29/2025
May 20, 2024-
April 25, 2025
Geothermal Phase 1 Building Renovation
Southeast corner of campus. (Geothermal Heat Exchange Building)
There will be planned geothermal shutdowns which could temporarily affect access to hot water.
June 17, 2024-
August 30, 2024
Geothermal Phase 2 Distribution Piping
Campus wide. Some access restrictions to Lot B.
There will be planned geothermal shutdowns which could temporarily affect access to hot water.
*Athletics reroof may be added if funding is identified.
For more information, reach out to Facilities at
541-885-1690
Active Projects
New Student Housing
Description:
New 85,000 sf, four-story building with 511 beds.
Status:
Construction underway, project nearing completion.
Start Date:
April 15, 2024
End Date:
May 2026
Geothermal Phase 1 - HX Building Renovation
Description:
Renovation of campus' main Heat Exchange building
Status:
Construction underway
Start Date:
May 20, 2024
End Date:
May 2026
Geothermal Phase 2 - Distribution Piping
Description:
Direct bury and tunnel distribution piping upgrades
Status:
Construction underway
Start Date:
May 2024
End Date:
May 2026
Geothermal Phase 3 - Geothermal Well Renovation
Description:
Renovation of geothermal well 6
Status:
Construction underway
Start Date:
May 2024
End Date:
June 2026
Geothermal Phase 4 - Building Geothermal Renovations
Description:
Building specific geothermal system upgrades
Status:
Design underway
Start Date:
TBD
End Date:
TBD
Geothermal Phase 5 - Snowmelt Expansion
Description:
Expansion of campus geothermal snowmelt system
Status:
Construction underway
Start Date:
March 2026
End Date:
June 2026
Geothermal Phase 6 - Campus Electrical Distribution
Description:
Renovation of campus electrical distribution system
Status:
Design completed
Start Date:
TBD
End Date:
TBD
Athletics Fieldhouse
Description:
New, 10,000 sf, Athletics Fieldhouse
Status:
Construction underway
Start Date:
May 2025
End Date:
August 2026
Stilwell Stadium Bleacher Canopy
Description:
New bleacher canopy at Stilwell Stadium
Status:
Design completed
Start Date:
May 2026
End Date:
September 2026
Previous Projects
ABA Clinic Renovation
Description:
Interior building renovation for ABA clinic
Start Date:
June 3, 2024
End Date:
December 27, 2024
Boivin Hall Renovation
Scope:
Renovation of 47,000 square foot education building
Funding:
UPE 803 / XI-Q Bond
Status:
Project Underway
Start Date:
February 2022
Completion Date:
June 2023
Boivin Traffic Improvements
Description:
Industrial Park Drive improvements between Dan O’Brien and Facilities Loop Road
Start Date:
June 17, 2024
End Date:
August 30, 2024
Campus Way/Dan O'Brien Roundabout
Scope:
New roundabout at Campus Way-Dan O'Brien intersection
Funding:
UPE 803 / XI-Q Bond
Status:
Design 90% complete
Start Date:
June 2021
Completion Date:
September 2021
DOW Department of Physical Therapy Renovation
Scope:
Completion of two unfinished spaces in the lower level of DOW
Funding:
Program funded / DPT001
Status:
Design underway
Start Date:
June 2021
Completion Date:
Awaiting to be determined
Integrated Student Health Center (ISHC) Addition
Scope:
Addition to existing building
Funding:
Department funded / SHS301 and SHS601
Status:
Design 70% complete
Start Date:
June 2021
Completion Date:
December 2021
John F. Moehl Track Renovation
Scope:
Renovation of OT track facility
Funding:
Will provide when available
Status:
Design completed
Start Date:
May 2021
Completion Date:
September 2021
OMIC R&D - Additive Innovation Center
Scope:
New 30,000 square foot facility
Funding:
UPE796 – UPE817 OMH403 – OMH404 / XI-Q Bonds and State Grants
Status:
Project Underway
Start Date:
July 2021
Completion Date:
February 24, 2023​​​​​​​
Snell Hall Exterior Renovation
Scope:
Partial exterior renovation of existing building
Funding:
UPE 797 / Capital Improvement and Renovation (CIR)
Status:
Design underway
Start Date:
June 2021
Completion Date:
September 2021
Snell Hall and Athletics Reroof
Description:
New membrane roofing on Snell Hall and Athletics
Start Date:
June 17, 2024
End Date:
August 20, 2024
Track/Stadium Renovation
Scope:
Renovation of Oregon Tech track, field, and stadium facility
Funding:
UPE 789 / UPE 807 Lottery
Status:
Project Underway
Start Date:
May 2021
Completion Date:
February 2023
The track and field renovation is 100% complete and the stadium renovation is underway.