Vermont Nuclear Decommissioning Citizens Advisory Panel (VT NDCAP) | Department of Public Service
Source: https://publicservice.vermont.gov/electric/ndcap
Archived: 2026-04-23 17:10
Vermont Nuclear Decommissioning Citizens Advisory Panel (VT NDCAP) | Department of Public Service
Skip to main content
Home
Careers
About Us
Document Library
Public Advocacy
Regulated Utilities
Energy Efficiency Utilities
Efficiency
Renewables
Telecommunications and Connectivity
Consumer Information and Assistance
Vermont Community Broadband Board (VCBB)
Vermont Nuclear Decommissioning Citizens Advisory Panel (VT NDCAP)
The 19 member
Vermont Nuclear Decommissioning Citizens Advisory Panel (VT-NDCAP)
was established to serve as a conduit for public information and education, to encourage open communication and community involvement in matters related to the decommissioning process of the Vermont Yankee Nuclear Power Station (VYNPS), and to receive written reports and presentations on the decommissioning of the VYNPS at its regular meetings. The VT-NDCAP shall advise the Governor, the General Assembly, Vermont State Agencies, and the public on issues related to VYNPS decommissioning.
The Panel serves in an advisory capacity only and does not have authority to direct decommissioning of the VYNPS.
VT-NDCAP was established pursuant to
Title 18 of Vermont Statutes, Chapter 34, Sections 1700
,
1701
and
1702
by
Act 179 of the 2014 Vermont Legislative Session
. VT-NDCAP replaces the seven-member Vermont State Nuclear Advisory Panel (VSNAP) that had been in place while Vermont Yankee produced electricity.
Act 54 of the 2021 Vermont Legislative Session
modified the composition of VT-NDCAP and revised its funding mechanism. VT-NDCAP includes six citizen members, two each to be appointed by the Governor, the House Speaker, and the President Pro Tempore of the Senate, as well as representation from eleven additional Vermont Yankee decommissioning stakeholder organizations.
UPCOMING VT-NDCAP MEETINGS:
See "
Upcoming NDCAP Meetings
" for Full Panel Meeting Info.
Upcoming meeting dates are also available in
Important News Updates
See
the Federal Nuclear Waste Policy (FNWP) Committee webpage
for FNWP Committee meeting dates, meeting materials and other useful information.
The Committee's next meeting is scheduled for
Monday, April 20
, beginning at 12 noon.
The Committee held virtual meetings on November 17 (2025) and February 2. Further details on recent and upcoming Committee meetings will be posted in the
Important News Updates
section and on
the Committee Webpage
as they become available.
See "
Meeting Materials
" for Agendas, Presentations Recordings, & Minutes for recent and upcoming Full Panel Meetings
See "
Panel Meeting Archives
" for Agendas, Presentations Recordings, & Minutes from Full Panel Meetings in Previous Years
Current Panel Members
(effective January 1, 2026)
2014 VT Legislation Establishing NDCAP
(Act 179 of the 2014 Legislative Session)
2021 VT Legislation Revising NDCAP Composition, Duties and Funding
(Act 54 of the 2021 Legislative Session)
Amended NDCAP Charter (Adopted 2016-05-26)
Panel Advisory Opinion Process
Approved Advisory Opinions
Panel Expense Approval Process
Additional VT Yankee Decommissioning Websites
Details of Vermont Yankee’s ownership and operational history are available on the
Brief History of Vermont Nuclear Power
webpage.
IMPORTANT NEWS UPDATES
See "
Upcoming NDCAP Meetings
" for upcoming Full Panel meeting dates.
******** LATEST VT-NDCAP NEWS *************************************
The VT-NDCAP
Federal Nuclear Waste Policy
Committee will hold its next virtual meeting on
Monday
,
APRIL 20, 2026
, beginning at 12 Noon (rescheduled from April 6). Further details on this meeting are available on the
"
Federal Nuclear Waste Policy Committee
" webpage.
Webcast recordings of all VT-NDCAP
FNWP Committee Meetings, including its most recent November 17, 2025 and February 2, 2026 meetings, are available through the "
Federal Nuclear Waste Policy Committee
" webpage.
The next
VT-NDCAP Full Panel Meeting
is tentatively scheduled to meet in May 2026. Further details (including the specific meeting date, will be published in the
Upcoming NDCAP Meetings
section (below) as they become available.
********************************************************************
NDCAP 2024 Annual Report Published
The Panel’s
2024 Annual Report
was finalized and published on
January 16, 2025
.
NDCAP 2023 Annual Report Published
The Panel’s
2023 Annual Report
was finalized and published on
January 12, 2024
.
NDCAP 2022 Annual Report Published
The Panel’s
2022 Annual Report
was finalized and published on
January 13, 2023
.
PANEL APPROVES ADVISORY OPINION ON DEPARTMENT OF ENERGY CONSENT-BASED SITING PROCESS
A
t a Special Meeting held February 28 (2022), VT NDCAP approved an
Advisory Opinion
in response to the US Department’ Energy's December 2021
Request for Information
on
Using a Consent-Based Siting Process to Identify Federal Interim Spent Nuclear Fuel Storage Facilities
. Presentations, a video recording and further details from this meeting are available in the
the
Meeting Materials
section of this webpage.
Vermont Yankee's Active Decommissioning Continues
On January 11, 2019, Vermont Yankee (VY) was formally sold to subsidiaries of NorthStar Group Services, Inc., to begin active decommissioning. Vermont Yankee ownership now consists of NorthStar Nuclear Decommissioning Company, LLC and NorthStar Vermont Yankeed, LLC.
Entergy & NorthStar Press Release on VY Sale Completion
NRC License Amendment Recognizing VY Sale Completion
NorthStar VY Decommissioning Activities as of May 2025
NorthStar Report on VY Decommissioning Activities as of September 2025
NorthStar Report on VY Decommissioning Activities as of December 2025
Latest NorthStar Report on VY Decommissioning Activities
(As of February 2026)
Details on Vermont Yankee’s ownership and operational history are available on the
Brief History of Vermont Nuclear Power
webpage.
Public Utility Commission Docket(s)
relevant to Vermont Yankee Decommissioning
Docket 8880
- Transfer of Ownership of Entergy Nuclear Vermont Yankee
Docket 8880 Memorandum of Understanding on VY Sale
Docket 8880 PUC Order Approving VY Sale
Docket 8880 Certificate of Public Good Approving VY Sale
Upcoming NDCAP Meetings
FULL PANEL MEETINGS
May 2026
(Date to be announced)
Beginning at 6:00 PM
This meeting will be conducted virtually (see
connectivity information
below).
The Vermont Nuclear Decommissioning Citizens Advisory Panel (VT-NDCAP) is expected to hold its second regular meeting of 2026 on a TO BE DETERMINED date in May.
Further details regarding this meeting will be published here as they become available.
A
complete agenda for the May 2026 full panel
meeting will be published here once it is available.
Votes on Panel Agenda items may occur.
Meeting presentations and related documentation for the May 2026 meeting will be publishied in the
Meeting Materials
section as they become available.
Connectivity information for the meeting webcast by computer or smart device is as follows:
ZOOM Webcast Connectivity for Full Panel Meetings
:
To join VT NDCAP meetings using a computer or smart device
:
https://us02web.zoom.us/j/84989288210?pwd=S3NEYnNEcWI3VEhGUWZ0bHdodWttQT09
Meeting ID:
849 8928 8210
Webcast Passcode:
uRMzy5
To join VT NDCAP meetings audio by telephone
(suggested for those with poor / limited internet connectivity):
Phone number:
(646) 558-8656
-or-
(301) 715-8592
Meeting ID:
849 8928 8210
Audio Passcode:
848854
Further details on future Panel meetings are published here as they become available.
Links to the
Materials & Presentations from Recent Meetings
are posted below.
Downloading meeting materials prior to the meeting is suggested for those with poor internet connection. Questions or comments on the meeting presentations may be sent to the Panel before, during, or after the meeting by
emailing
PSD.NDCAP@vermont.gov
.
Questions regarding these (or any VT-NDCAP) meetings may be directed to State Nuclear Engineer Tony Leshinskie at
anthony.leshinskie@vermont.gov
or 802-272-1714.
Questions or comments may be sent to the Panel by emailing
PSD.NDCAP@vermont.gov
.
All emails sent to VT NDCAP become public record.
PLEASE NOTE
: While the State Nuclear Engineer serves as the primary administrator for VT-NDCAP, he is
not
a VT-NDCAP member.
VT NDCAP FEDERAL NUCLEAR WASTE POLICY COMMITTEE MEETINGS
Meeting dates, connectivity information, and further details for VT NDCAP’s Federal Nuclear Waste Policy (FNWP) Committee meetings are available at the
FNWP Committee Webpage
. Meeting recordings and additional materials from the Committee’s prior meetings are also available on this page.
Members of the public are encouraged to provide written comments and suggested nuclear waste policy reading materials to the Committee via VT NDCAP’s email address at
PSD.NDCAP@vermont.gov
. All emails sent to the Committee become public record.
Questions regarding these Committee
meeting
s may be directed to State Nuclear Engineer Tony Leshinskie at
anthony.leshinskie@vermont.gov
or 802-272-1714.
VT NDCAP ISSUES COMMITTEE MEETINGS
The
VT NDCAP Issues Committee
was created to identify potential agenda items for future meetings of the Full Panel.
All meetings of the Vermont Nuclear Decommissioning Citizens Advisory Panel (including its committee meeting) are open to the public.
For further details regarding any VT NDCAP Full Panel or committee meeting, please contact State Nuclear Engineer Tony Leshinskie at
anthony.leshinskie@vermont.gov
or 802-272-1714.
All emails sent to
VT
NDCAP
or its committees
become public record.
Meeting Materials
Upcoming Full Panel Meetings
May 2026 Full Panel Meeting
Meeting Agenda
VTNDCAP Draft Meeting Minutes 05.XX.2026
BCTV Meeting Recording
NorthStar May 2026 Decommissioning Status Update
VT Agency of Natural Resources May 2026 Update
VT Public Service Department May 2026 Update
Materials for the Panel's May 2026 Meeting will be published here as they become available.
Recent Full Panel Meetings
Meeting of February 23, 2026
Meeting Agenda 02-23-2026
VTNDCAP Draft Meeting Minutes 02.23.2026
BCTV Meeting Recording
2025 Panel Annual Report Draft
(February 17, 2026 version)
NorthStar February 2026 Decommissioning Status Update
VT Agency of Natural Resources February 2026 Update
VT Public Service Department February 2026 Update
Meeting of December 8, 2025
Meeting Agenda 12-08-2025 (Final)
VTNDCAP Draft Meeting Minutes 12.08.2025
BCTV Meeting Recording
NorthStar December 2025 Decommissioning Status Update
VT Agency of Natural Resources December 2025 Update
VT Public Service Department December 2025 Update
2025 Panel Annual Report Draft
(awaiting Panelists review)
Proposed Nuclear Plant Decommissioning Act of 2025
Section-by-Section Summary of the Bill
Full Text of the Bill
Meeting of September 22, 2025
Meeting Agenda 09-22-2025
VTNDCAP Draft Meeting Minutes 09.22.2025
BCTV Meeting Recording
NorthStar September 2025 Decommissioning Status Update
VT Agency of Natural Resources September 2025 Update
VT Public Service Department September 2025 Update
Meeting of May 12, 2025
Meeting Agenda 05-12-2025
VTNDCAP Draft Meeting Minutes 05.12.2025
BCTV Meeting Recording
VT Yankee De-Inventory Report
(links to curie.pnnl.gov / US Dept. of Energy website)
Department of Energy Overview of VT Yankee De-Inventory Report
NorthStar May 2025 Decommissioning Status Update
VT Agency of Natural Resources May 2025 Update
VT Public Service Department May 2025 Update
Meeting of December 9, 2024
Meeting Agenda 12-09-2024
VT-NDCAP Draft Meeting Minutes 12.09.2024
BCTV Meeting Recording
NorthStar December 2024 Decommissioning Status Update
VT Agency of Natural Resources December
2024 Update
VT Public Service Department December 2024 Update
Report on June 2024 RadWaste Summit
2024 Panel Annual Report Draft
(December 4 Version)
Meeting of September 23, 2024
Meeting Agenda 09-23-2024
VTNDCAP Draft Meeting Minutes 09.23.2024
BCTV Meeting Recording
Panel Meeting Chat
NorthStar September 2024 Decommissioning Status Update
VT Agency of Natural Resources September
2024 Update
VT Public Service Department September 2024 Update
Meeting of May 13, 2024
Meeting Agenda 05-13-2024
VTNDCAP Draft Meeting Minutes 05.13.2024
BCTV Meeting Recording
NorthStar May 2024 Decommissioning Status Update
VT Agency of Natural Resources May 2024 Update
VT Public Service Department May 2024 Update
Looking for older reports or meeting archives?
Some historical documents and reports are no longer available online. Please
visit the public records webpage
to request records.
Approved Advisory Opinions
:
NDCAP Advisory Opinion - Comments on US Department of Energy Consent-Based Siting Process for Federal Interim Nuclear Fuel Storage Facilities - Adopted 02.28.2022
NDCAP Advisory Opinion – Construction of a Second VY Spent Fuel Storage Pad – Adopted 02.25.2016
NDCAP Advisory Opinion - Engaging Host Communities - Adopted 11.12.2015
Resources
Brief History of Vermont Nuclear Power
Skip to main content
Home
Careers
About Us
Document Library
Public Advocacy
Regulated Utilities
Energy Efficiency Utilities
Efficiency
Renewables
Telecommunications and Connectivity
Consumer Information and Assistance
Vermont Community Broadband Board (VCBB)
Vermont Nuclear Decommissioning Citizens Advisory Panel (VT NDCAP)
The 19 member
Vermont Nuclear Decommissioning Citizens Advisory Panel (VT-NDCAP)
was established to serve as a conduit for public information and education, to encourage open communication and community involvement in matters related to the decommissioning process of the Vermont Yankee Nuclear Power Station (VYNPS), and to receive written reports and presentations on the decommissioning of the VYNPS at its regular meetings. The VT-NDCAP shall advise the Governor, the General Assembly, Vermont State Agencies, and the public on issues related to VYNPS decommissioning.
The Panel serves in an advisory capacity only and does not have authority to direct decommissioning of the VYNPS.
VT-NDCAP was established pursuant to
Title 18 of Vermont Statutes, Chapter 34, Sections 1700
,
1701
and
1702
by
Act 179 of the 2014 Vermont Legislative Session
. VT-NDCAP replaces the seven-member Vermont State Nuclear Advisory Panel (VSNAP) that had been in place while Vermont Yankee produced electricity.
Act 54 of the 2021 Vermont Legislative Session
modified the composition of VT-NDCAP and revised its funding mechanism. VT-NDCAP includes six citizen members, two each to be appointed by the Governor, the House Speaker, and the President Pro Tempore of the Senate, as well as representation from eleven additional Vermont Yankee decommissioning stakeholder organizations.
UPCOMING VT-NDCAP MEETINGS:
See "
Upcoming NDCAP Meetings
" for Full Panel Meeting Info.
Upcoming meeting dates are also available in
Important News Updates
See
the Federal Nuclear Waste Policy (FNWP) Committee webpage
for FNWP Committee meeting dates, meeting materials and other useful information.
The Committee's next meeting is scheduled for
Monday, April 20
, beginning at 12 noon.
The Committee held virtual meetings on November 17 (2025) and February 2. Further details on recent and upcoming Committee meetings will be posted in the
Important News Updates
section and on
the Committee Webpage
as they become available.
See "
Meeting Materials
" for Agendas, Presentations Recordings, & Minutes for recent and upcoming Full Panel Meetings
See "
Panel Meeting Archives
" for Agendas, Presentations Recordings, & Minutes from Full Panel Meetings in Previous Years
Current Panel Members
(effective January 1, 2026)
2014 VT Legislation Establishing NDCAP
(Act 179 of the 2014 Legislative Session)
2021 VT Legislation Revising NDCAP Composition, Duties and Funding
(Act 54 of the 2021 Legislative Session)
Amended NDCAP Charter (Adopted 2016-05-26)
Panel Advisory Opinion Process
Approved Advisory Opinions
Panel Expense Approval Process
Additional VT Yankee Decommissioning Websites
Details of Vermont Yankee’s ownership and operational history are available on the
Brief History of Vermont Nuclear Power
webpage.
IMPORTANT NEWS UPDATES
See "
Upcoming NDCAP Meetings
" for upcoming Full Panel meeting dates.
******** LATEST VT-NDCAP NEWS *************************************
The VT-NDCAP
Federal Nuclear Waste Policy
Committee will hold its next virtual meeting on
Monday
,
APRIL 20, 2026
, beginning at 12 Noon (rescheduled from April 6). Further details on this meeting are available on the
"
Federal Nuclear Waste Policy Committee
" webpage.
Webcast recordings of all VT-NDCAP
FNWP Committee Meetings, including its most recent November 17, 2025 and February 2, 2026 meetings, are available through the "
Federal Nuclear Waste Policy Committee
" webpage.
The next
VT-NDCAP Full Panel Meeting
is tentatively scheduled to meet in May 2026. Further details (including the specific meeting date, will be published in the
Upcoming NDCAP Meetings
section (below) as they become available.
********************************************************************
NDCAP 2024 Annual Report Published
The Panel’s
2024 Annual Report
was finalized and published on
January 16, 2025
.
NDCAP 2023 Annual Report Published
The Panel’s
2023 Annual Report
was finalized and published on
January 12, 2024
.
NDCAP 2022 Annual Report Published
The Panel’s
2022 Annual Report
was finalized and published on
January 13, 2023
.
PANEL APPROVES ADVISORY OPINION ON DEPARTMENT OF ENERGY CONSENT-BASED SITING PROCESS
A
t a Special Meeting held February 28 (2022), VT NDCAP approved an
Advisory Opinion
in response to the US Department’ Energy's December 2021
Request for Information
on
Using a Consent-Based Siting Process to Identify Federal Interim Spent Nuclear Fuel Storage Facilities
. Presentations, a video recording and further details from this meeting are available in the
the
Meeting Materials
section of this webpage.
Vermont Yankee's Active Decommissioning Continues
On January 11, 2019, Vermont Yankee (VY) was formally sold to subsidiaries of NorthStar Group Services, Inc., to begin active decommissioning. Vermont Yankee ownership now consists of NorthStar Nuclear Decommissioning Company, LLC and NorthStar Vermont Yankeed, LLC.
Entergy & NorthStar Press Release on VY Sale Completion
NRC License Amendment Recognizing VY Sale Completion
NorthStar VY Decommissioning Activities as of May 2025
NorthStar Report on VY Decommissioning Activities as of September 2025
NorthStar Report on VY Decommissioning Activities as of December 2025
Latest NorthStar Report on VY Decommissioning Activities
(As of February 2026)
Details on Vermont Yankee’s ownership and operational history are available on the
Brief History of Vermont Nuclear Power
webpage.
Public Utility Commission Docket(s)
relevant to Vermont Yankee Decommissioning
Docket 8880
- Transfer of Ownership of Entergy Nuclear Vermont Yankee
Docket 8880 Memorandum of Understanding on VY Sale
Docket 8880 PUC Order Approving VY Sale
Docket 8880 Certificate of Public Good Approving VY Sale
Upcoming NDCAP Meetings
FULL PANEL MEETINGS
May 2026
(Date to be announced)
Beginning at 6:00 PM
This meeting will be conducted virtually (see
connectivity information
below).
The Vermont Nuclear Decommissioning Citizens Advisory Panel (VT-NDCAP) is expected to hold its second regular meeting of 2026 on a TO BE DETERMINED date in May.
Further details regarding this meeting will be published here as they become available.
A
complete agenda for the May 2026 full panel
meeting will be published here once it is available.
Votes on Panel Agenda items may occur.
Meeting presentations and related documentation for the May 2026 meeting will be publishied in the
Meeting Materials
section as they become available.
Connectivity information for the meeting webcast by computer or smart device is as follows:
ZOOM Webcast Connectivity for Full Panel Meetings
:
To join VT NDCAP meetings using a computer or smart device
:
https://us02web.zoom.us/j/84989288210?pwd=S3NEYnNEcWI3VEhGUWZ0bHdodWttQT09
Meeting ID:
849 8928 8210
Webcast Passcode:
uRMzy5
To join VT NDCAP meetings audio by telephone
(suggested for those with poor / limited internet connectivity):
Phone number:
(646) 558-8656
-or-
(301) 715-8592
Meeting ID:
849 8928 8210
Audio Passcode:
848854
Further details on future Panel meetings are published here as they become available.
Links to the
Materials & Presentations from Recent Meetings
are posted below.
Downloading meeting materials prior to the meeting is suggested for those with poor internet connection. Questions or comments on the meeting presentations may be sent to the Panel before, during, or after the meeting by
emailing
PSD.NDCAP@vermont.gov
.
Questions regarding these (or any VT-NDCAP) meetings may be directed to State Nuclear Engineer Tony Leshinskie at
anthony.leshinskie@vermont.gov
or 802-272-1714.
Questions or comments may be sent to the Panel by emailing
PSD.NDCAP@vermont.gov
.
All emails sent to VT NDCAP become public record.
PLEASE NOTE
: While the State Nuclear Engineer serves as the primary administrator for VT-NDCAP, he is
not
a VT-NDCAP member.
VT NDCAP FEDERAL NUCLEAR WASTE POLICY COMMITTEE MEETINGS
Meeting dates, connectivity information, and further details for VT NDCAP’s Federal Nuclear Waste Policy (FNWP) Committee meetings are available at the
FNWP Committee Webpage
. Meeting recordings and additional materials from the Committee’s prior meetings are also available on this page.
Members of the public are encouraged to provide written comments and suggested nuclear waste policy reading materials to the Committee via VT NDCAP’s email address at
PSD.NDCAP@vermont.gov
. All emails sent to the Committee become public record.
Questions regarding these Committee
meeting
s may be directed to State Nuclear Engineer Tony Leshinskie at
anthony.leshinskie@vermont.gov
or 802-272-1714.
VT NDCAP ISSUES COMMITTEE MEETINGS
The
VT NDCAP Issues Committee
was created to identify potential agenda items for future meetings of the Full Panel.
All meetings of the Vermont Nuclear Decommissioning Citizens Advisory Panel (including its committee meeting) are open to the public.
For further details regarding any VT NDCAP Full Panel or committee meeting, please contact State Nuclear Engineer Tony Leshinskie at
anthony.leshinskie@vermont.gov
or 802-272-1714.
All emails sent to
VT
NDCAP
or its committees
become public record.
Meeting Materials
Upcoming Full Panel Meetings
May 2026 Full Panel Meeting
Meeting Agenda
VTNDCAP Draft Meeting Minutes 05.XX.2026
BCTV Meeting Recording
NorthStar May 2026 Decommissioning Status Update
VT Agency of Natural Resources May 2026 Update
VT Public Service Department May 2026 Update
Materials for the Panel's May 2026 Meeting will be published here as they become available.
Recent Full Panel Meetings
Meeting of February 23, 2026
Meeting Agenda 02-23-2026
VTNDCAP Draft Meeting Minutes 02.23.2026
BCTV Meeting Recording
2025 Panel Annual Report Draft
(February 17, 2026 version)
NorthStar February 2026 Decommissioning Status Update
VT Agency of Natural Resources February 2026 Update
VT Public Service Department February 2026 Update
Meeting of December 8, 2025
Meeting Agenda 12-08-2025 (Final)
VTNDCAP Draft Meeting Minutes 12.08.2025
BCTV Meeting Recording
NorthStar December 2025 Decommissioning Status Update
VT Agency of Natural Resources December 2025 Update
VT Public Service Department December 2025 Update
2025 Panel Annual Report Draft
(awaiting Panelists review)
Proposed Nuclear Plant Decommissioning Act of 2025
Section-by-Section Summary of the Bill
Full Text of the Bill
Meeting of September 22, 2025
Meeting Agenda 09-22-2025
VTNDCAP Draft Meeting Minutes 09.22.2025
BCTV Meeting Recording
NorthStar September 2025 Decommissioning Status Update
VT Agency of Natural Resources September 2025 Update
VT Public Service Department September 2025 Update
Meeting of May 12, 2025
Meeting Agenda 05-12-2025
VTNDCAP Draft Meeting Minutes 05.12.2025
BCTV Meeting Recording
VT Yankee De-Inventory Report
(links to curie.pnnl.gov / US Dept. of Energy website)
Department of Energy Overview of VT Yankee De-Inventory Report
NorthStar May 2025 Decommissioning Status Update
VT Agency of Natural Resources May 2025 Update
VT Public Service Department May 2025 Update
Meeting of December 9, 2024
Meeting Agenda 12-09-2024
VT-NDCAP Draft Meeting Minutes 12.09.2024
BCTV Meeting Recording
NorthStar December 2024 Decommissioning Status Update
VT Agency of Natural Resources December
2024 Update
VT Public Service Department December 2024 Update
Report on June 2024 RadWaste Summit
2024 Panel Annual Report Draft
(December 4 Version)
Meeting of September 23, 2024
Meeting Agenda 09-23-2024
VTNDCAP Draft Meeting Minutes 09.23.2024
BCTV Meeting Recording
Panel Meeting Chat
NorthStar September 2024 Decommissioning Status Update
VT Agency of Natural Resources September
2024 Update
VT Public Service Department September 2024 Update
Meeting of May 13, 2024
Meeting Agenda 05-13-2024
VTNDCAP Draft Meeting Minutes 05.13.2024
BCTV Meeting Recording
NorthStar May 2024 Decommissioning Status Update
VT Agency of Natural Resources May 2024 Update
VT Public Service Department May 2024 Update
Looking for older reports or meeting archives?
Some historical documents and reports are no longer available online. Please
visit the public records webpage
to request records.
Approved Advisory Opinions
:
NDCAP Advisory Opinion - Comments on US Department of Energy Consent-Based Siting Process for Federal Interim Nuclear Fuel Storage Facilities - Adopted 02.28.2022
NDCAP Advisory Opinion – Construction of a Second VY Spent Fuel Storage Pad – Adopted 02.25.2016
NDCAP Advisory Opinion - Engaging Host Communities - Adopted 11.12.2015
Resources
Brief History of Vermont Nuclear Power