Projects
Projects
19-9472
Andrew Weil Center for Integrative Medicine
PROJECT DETAILS
map
This project will develop a new facility for the Andrew Weil Center for Integrative Medicine (AWCIM) to centralize their operations in a physical building and landscape environment that supports their philosophy of healthy work environments.
Current Budget
$23,000,000
Projected Ultimate Budget
$23,000,000
Project Manager
Dana Sylvester
Construction Project Manager
Dana Sylvester
Phase
Occupancy
Design Professional
Line and Space, LLC
Construction Schedule
May 2022 - March 2024
Contractor
DPR Construction
18-9386
Applied Research Building
PROJECT DETAILS
map
The new Applied Research Building (ARB) is a very specialized, one of a kind research facility designed specifically for UA applied research programs. This three-story building has a variety of programmed spaces, including high bay payload assembly areas, a large scale thermal vacuum chamber, unique research / customized laboratories, clean rooms, faculty offices, collaboration spaces, and conference rooms.

The ARB is located at the southeast corner of Helen Street and the Highland Corridor. The Highland Corridor has been improved and realigned as part of this project to provide safer pedestrian and bicycle crossings at Helen Street.
Current Budget
$86,940,615
Projected Ultimate Budget
$85,000,000
Project Manager
Brian Brandis
Construction Project Manager
Dana Sylvester
Phase
Occupancy
Design Professional
SmithGroup
Construction Schedule
June 2021 - March 2023
Contractor
McCarthy Building Companies
19-9485
Arizona Stadium, West Renovations
PROJECT DETAILS
map
Initial planning process for the next Arizona Stadium renovations.
Working with consultant on a marketing and feasibility study to collect and organize valuable feedback from Wildcat fans on the future of Arizona Stadium to enhance the fan experience.
Current Budget
$400,000
Projected Ultimate Budget
$400,000
Project Manager
Brian Brandis
Construction Project Manager
Brian Brandis
Phase
Design
Design Professional
Populous
Construction Schedule
TBD - TBD
Contractor
None
57-0053
Art Museum Room 101C Remodel
PROJECT DETAILS
map
Jason Emmons.
Remodel Room 101C.
Current Budget
$0
Projected Ultimate Budget
$1,210
Project Manager
Michael Seal
Construction Project Manager
Michael Seal
Phase
Design
Design Professional
None
Construction Schedule
TBD - TBD
Contractor
None
25-9776
Behavioral Health Clinic
PROJECT DETAILS
map
Renovations to Behavioral Health Clinic to address HIPAA concerns.
Current Budget
$490,000
Projected Ultimate Budget
$490,000
Project Manager
Brian Brandis
Construction Project Manager
Drew Lutz
Phase
Occupancy
Design Professional
BWS
Construction Schedule
May 2025 - August 2025
Contractor
None
12-9134
Bioscience Research Laboratories
PROJECT DETAILS
map
The BSRL provides research facilities to support interdisciplinary research in many health science disciplines.

This new facility encourages collaborative translational research that will advance understanding of the molecular basis of human health, aging and disease.
BSRL is the final puzzle piece that completes the master-plan for its urban block in the Health Sciences Campus. The original vision for a campus courtyard was initiated by the Keating BIO5 and MRB buildings, which frame the south, east, and north edges of the space. The BSRL building gives final definition to the courtyard by establishing its western edge while also providing access into it through a grand two-story opening. This breezeway portal gives passage to a mid-block pedestrian route and celebrates BSRL’s role as a gateway and a campus threshold.

BSRL is a North-South bar building, and its simple form expresses both a sense of repose and dynamic movement as the bridge-like top story suspends itself above the central portal and stretches southward over the transparent, street-welcoming first story. The short north and south ends cantilever outwards to accentuate the street corners and emphasize the building as a gate-way to and from the UA bio-science campus along Cherry Avenue.

As part of the three-building set, BSRL sympathizes with and expands the architectural vocabulary of Keating Bio5 and MRB. Like the two other buildings, BSRL has an outward-facing shell of red brick that provides the entire block with aesthetic consistency. This outer layer also acts as a protective shield to the more transparent, courtyard-facing inner layer.

BSRL’s brick facade is lifted along the southern half of the western edge along Cherry Avenue, creating a more welcoming presence and a new front door to the complex. This exposes the glazed lobby and interaction space, which was conceived as an extension of the outdoor environment, joining the street realm and the inner courtyard through a layered, visually connected continuum of activity spaces: pedestrian colonnade, interaction lobby and café, and breezeway portal.
Current Budget
$107,500,000
Projected Ultimate Budget
$107,500,000
Project Manager
Brian Brandis
Construction Project Manager
Susie Burruel
Phase
Occupancy
Design Professional
Zimmer Gunsul Frasca Architects, LLP
Construction Schedule
December 2015 - May 2025
Contractor
D P R Construction Inc
24-9706
BSRL Room 043 Tenant Improvement (.5T)
PROJECT DETAILS
map
Build out for a new 0.5T MRI Suite.
Current Budget
$1,675,000
Projected Ultimate Budget
$1,950,000
Project Manager
Brian Brandis
Construction Project Manager
Susie Burruel
Phase
Occupancy
Design Professional
ZGF
Construction Schedule
August 2024 - July 2025
Contractor
DPR
24-9707
BSRL Room 062 Tenant Imrpovement (3T)
PROJECT DETAILS
map
Renovations for equipment and infrastructure of for a new 3T MRI.
Current Budget
$1,211,720
Projected Ultimate Budget
$1,211,720
Project Manager
Brian Brandis
Construction Project Manager
Susie Burruel
Phase
Occupancy
Design Professional
ZGF
Construction Schedule
August 2024 - May 2025
Contractor
DPR
23-9631
Building 201, Surgical Skills Training Lab
PROJECT DETAILS
map
Renovations for a new surgical skills training lab, including an 8 bed operating room and 12 station dissection lab.
Schematic Design is complete.
Design Development and regular stakeholder meetings continue.
Current Budget
$3,800,000
Projected Ultimate Budget
$3,800,000
Project Manager
Roel Krabbendam
Construction Project Manager
Roel Krabbendam
Phase
Design
Design Professional
DLR Group | Westlake Reed Leskosky
Construction Schedule
February 2026 - September 2026
Contractor
Lloyd Construction
22-9604
Building 73, Room 120 and 215 Electrical Upgrade
PROJECT DETAILS
map
This project is to remove underrated panels. The project also includes reworking the normal and emergency feeders to the distribution units in Rm 215 and Rm 214.
Construction is complete and the new Switchboard controller is being ordered.
Current Budget
$140,000
Projected Ultimate Budget
$140,000
Project Manager
Dana Sylvester
Construction Project Manager
Dana Sylvester
Phase
Construction
Design Professional
UA PDC
Construction Schedule
TBD - TBD
Contractor
Gilbert Electric
23-9641
CALS Bovisphere
PROJECT DETAILS
map
This project will renovate an existing facility into a waste-to-energy research/teaching center involving anerobic digestion of bio solids and liquids

100% CD complete with construction scheduled to start 4/1.
GMP #1 for early procurement submitted and approved.
GMP #2 for construction submitted and approved.
Current Budget
$9,980,055
Projected Ultimate Budget
$10,000,000
Project Manager
Roel Krabbendam
Construction Project Manager
Roel Krabbendam
Phase
Design
Design Professional
GLHN
Construction Schedule
April 2026 - December 2026
Contractor
Core Construction
23-9642
CALS Food Products and Safety Lab Renovation
PROJECT DETAILS
map
Renovation of existing Food Product Safety Lab to provide a state of the art research and teaching facility.
Current Budget
$11,945,055
Projected Ultimate Budget
$10,900,000
Project Manager
Susie Burruel
Construction Project Manager
Susie Burruel
Phase
Occupancy
Design Professional
GLHN
Construction Schedule
January 2024 - February 2025
Contractor
Core Construction
15-9248
Campus Research Infrastructure
PROJECT DETAILS
map
Campus Infrastructure is a multi-phase, multi-element project which will supplement existing infrastructure to support new research buildings being constructed and future growth.

The installation of large storage tanks beneath the east Main Mall will mitigate surface water run-off from large rainstorms on Cherry Ave. and reduce the risk of flooding of University buildings and impacts to 6th Street and neighborhoods to the south.

During a rainstorm, catch basins installed in University Blvd and Cherry Ave will intercept and channel storm water to a series of interconnected, 10 feet diameter, 20 feet long underground tanks installed under the east Mall where it will gradually dissipate into the ground. Upon completion, the system will accommodate a I hour rainfall event of up to 2.3 inches.
Current Budget
$14,006,560
Projected Ultimate Budget
$16,000,000
Project Manager
Dana Sylvester
Construction Project Manager
Dana Sylvester
Phase
Occupancy
Design Professional
GLHN
Construction Schedule
August 2021 - October 2022
Contractor
Sundt Construction Inc
19-9468
CAPLA Addition and Renovation
PROJECT DETAILS
map
The College of Architecture, Planning & Landscape Architecture’s (CAPLA) Strategic Plan includes goals to enhance learning and support increased student enrollment by improving and better utilizing their facilities. This project prioritized natural ventilation and additional student studio spaces with a more significant energy efficient exterior window wall system and whole building natural ventilation in the West Building.
Current Budget
$9,851,000
Projected Ultimate Budget
$9,851,000
Project Manager
Brian Brandis
Construction Project Manager
Brian Brandis
Phase
Occupancy
Design Professional
Richard Kennedy Architects
Construction Schedule
March 2022 - January 2023
Contractor
CORE Construction, Inc.
20-9527
College of Fine Arts Master Plan Implementation
PROJECT DETAILS
map
Arizona Arts has been given a major role in the University's Strategic Plan to integrate the arts into all aspects of the University and establish UArizona as an arts destination and increase both local and national awareness. To realize this strategic vision, a master plan has recently been completed that outlines series of projects implemented through a multi-year, multi-phased manner as funding becomes available. The initial phase will consist of renovations of the Art Building.
Current Budget
$6,001,573
Projected Ultimate Budget
$6,030,000
Project Manager
Susie Burruel
Construction Project Manager
Susie Burruel
Phase
Occupancy
Design Professional
RSP Architects
Construction Schedule
July 2021 - August 2022
Contractor
CORE Construction
19-9454
College of Law, Class Lab 118, 126 and 146 Renovation
PROJECT DETAILS
map
In order to improve the Trial Advocacy learning experience, the College of Law will be renovating Class Labs 118, 126 and 146 for a large Mock Courtroom and Appellate Courtroom.
Current Budget
$4,735,000
Projected Ultimate Budget
$5,000,000
Project Manager
Brian Brandis
Construction Project Manager
Brian Brandis
Phase
Occupancy
Design Professional
Multistudio, Inc. (formerly Gould Evans Associates)
Construction Schedule
January 2024 - October 2024
Contractor
DPR Construction, Inc., A General Partnership
23-9638
Community School Garden, 415 N. Mountain Ave Renovation
PROJECT DETAILS
map
The School Garden Workshop program connects students in public schools with Tucson’s agricultural legacy by planting, maintaining, and engaging in school gardens. Renovations to the former houses at 407 & 415 N Mountain Ave and installation of teaching gardens will be used by Mansfeld Middle School Students, UA School Garden Internships students, and K-12 educators from across the region.
Current Budget
$2,190,718
Projected Ultimate Budget
$2,000,000
Project Manager
Brian Brandis
Construction Project Manager
Michael Seal
Phase
Occupancy
Design Professional
Poster Mirto McDonald
Construction Schedule
April 2025 - September 2025
Contractor
CHASSE Building Team
24-9709
GCRB Metacave Tenant Improvement, Building 126, Rooms 245 and 250
PROJECT DETAILS
map
Combine labs 245 and 250 into a space for an immersive virtual reality suite (Metacave).
Current Budget
$200,000
Projected Ultimate Budget
$200,000
Project Manager
Brian Brandis
Construction Project Manager
Dana Sylvester
Phase
Occupancy
Design Professional
ZGF
Construction Schedule
June 2024 - August 2024
Contractor
Kitchell Contractors Inc
22-9590
GCRB, Level 6 Tenant Improvements
PROJECT DETAILS
map
Tenant improvement for Grand Challenges Research Building sixth floor shell space.
Current Budget
$7,000,000
Projected Ultimate Budget
$7,000,000
Project Manager
Dana Sylvester
Construction Project Manager
Dana Sylvester
Phase
Occupancy
Design Professional
None
Construction Schedule
September 2022 - February 2024
Contractor
Kitchell Contractors
56-0031
Gould Simpson DCW Booster Pump Replacement
PROJECT DETAILS
map
Don Mcloy.
S/R 1775647.
Fund D1736.
Account 8058599.
Current Budget
$0
Projected Ultimate Budget
$1,210
Project Manager
Michael Seal
Construction Project Manager
Don Mcloy
Phase
Design
Design Professional
None
Construction Schedule
TBD - TBD
Contractor
None
18-9384
Grand Challenges Research Building
PROJECT DETAILS
map
GCRB is a new research facility that will leverage the University of Arizona's core strengths to address the grand challenges identified in Pillar 2 of the University's strategic plan. GCRB will be an interdisciplinary facility designed to foster conversations among sciences and programs.

The 7-story building will be located on Cherry Avenue as part of the Wyant College of Optical Sciences complex. The new building will be south of Meynell West, and across the street from the Main Library.

GCRB will support research laboratories for expansion of the Optical Sciences under the Office of the Provost to continue advancing the University's international reputation in this field, as well as new sponsored projects for the Office of Research Innovation and Impact. test
Current Budget
$99,000,000
Projected Ultimate Budget
$99,000,000
Project Manager
Brian Brandis
Construction Project Manager
Dana Sylvester
Phase
Occupancy
Design Professional
ZGF Architects/BWS Architects
Construction Schedule
July 2021 - February 2024
Contractor
Kitchell Contractors, Inc. of Arizona
13-9193
Health Sciences Innovation Building
PROJECT DETAILS
map
State-of-the-art instructional spaces will offer simulated, real-life situations for teams of students, faculty and health professionals in medicine, nursing, pharmacy and public health. The HSIB will offer flexible, large, medium and small group/team learning areas and clinical labs and simulation centers for a broad spectrum of instructional applications.
The building interior was deliberately designed without columns to provide more flexibility of space in the future.

Approximately 1,000+ people can be accommodated in the Forum for special events.

Spaces known as “flipped classrooms” can accommodate up to 150 students for interactive learning.

Terra cotta, a material that emulates brick, will create natural shade on the east façade where
glass walls have been constructed.
Current Budget
$165,000,000
Projected Ultimate Budget
$165,000,000
Project Manager
Dana Sylvester
Construction Project Manager
Dana Sylvester
Phase
Occupancy
Design Professional
CO Architects
Construction Schedule
June 2016 - May 2019
Contractor
Kitchell
22-9609
HSEB, Pharmacy Teaching Lab Renovation
PROJECT DETAILS
map
Renovation of existing classroom space in HSEB to accommodate a new Pharmacy Teaching Lab.
Current Budget
$299,000
Projected Ultimate Budget
$299,000
Project Manager
Susie Burruel
Construction Project Manager
Susie Burruel
Phase
Occupancy
Design Professional
McCarthy Building Companies
Construction Schedule
September 2022 - November 2022
Contractor
McCarthy Building Companies
23-9626
HSIB Basement PT Education Renovation
PROJECT DETAILS
map
Renovation of existing basement area of the Health Sciences Innovation Building to accommodate a new physical therapy program and physician assistant program.
Current Budget
$8,000,000
Projected Ultimate Budget
$8,000,000
Project Manager
Roel Krabbendam
Construction Project Manager
Susie Burruel
Phase
Occupancy
Design Professional
CO Architects
Construction Schedule
August 2024 - June 2025
Contractor
Kitchell
19-9466
HSIB, Levels 1, 2 and 6 Remodeling
PROJECT DETAILS
map
Remodel portion of Level 1 in the Health Sciences Innovation Building to accommodate food service.
Current Budget
$6,500,000
Projected Ultimate Budget
$7,800,000
Project Manager
Dana Sylvester
Construction Project Manager
Dana Sylvester
Phase
Occupancy
Design Professional
CO Architects
Construction Schedule
September 2019 - July 2023
Contractor
Kitchell Contractors
56-0023
Keating IHW
PROJECT DETAILS
map
S/R# 1697373.
Fund# K0240.
Current Budget
$0
Projected Ultimate Budget
$1,210
Project Manager
Michael Seal
Construction Project Manager
Don Mcloy
Phase
Design
Design Professional
None
Construction Schedule
TBD - TBD
Contractor
None
26-9866
Magnum Dome
PROJECT DETAILS
map
Design for site location of disassembled dome and assemble back together.
Starting site design.
Current Budget
$50,000
Projected Ultimate Budget
$50,269
Project Manager
Michael Seal
Construction Project Manager
Michael Seal
Phase
Design
Design Professional
None
Construction Schedule
TBD - TBD
Contractor
None
22-9593
Manuel Pacheco Integrated Learning Center Room 136 Renovations
PROJECT DETAILS
map
The Department of Digital Learning and the Office of Instruction and Assessment will be collaborating on online teaching and learning initiatives as they come together to form a Teaching and Learning Center in a renovated space in ILC.
Current Budget
$750,000
Projected Ultimate Budget
$750,000
Project Manager
Dana Sylvester
Construction Project Manager
Dana Sylvester
Phase
Occupancy
Design Professional
BWS Architects
Construction Schedule
May 2023 - September 2023
Contractor
Kappcon
20-9505
Maricopa County Cooperative Extension, Demonstration Kitchen Remodeling
PROJECT DETAILS
map
Remodel of the existing classroom and kitchen area at the Maricopa County Cooperative Extension Facility at 4341 E. Broadway Road.
Current Budget
$407,000
Projected Ultimate Budget
$407,000
Project Manager
Susie Burruel
Construction Project Manager
Susie Burruel
Phase
Occupancy
Design Professional
GLHN Architects And Engineers
Construction Schedule
June 2020 - October 2022
Contractor
McCarthy Building Companies
21-9548
Marroney Theatre Renovations & Addition
PROJECT DETAILS
map
Renovations to upgrade the educational programs of The School of Theatre, Film & Television (TFTV) and to enhance the patron experience of the theatre.
Current Budget
$8,500,000
Projected Ultimate Budget
$8,500,000
Project Manager
Susie Burruel
Construction Project Manager
Susie Burruel
Phase
Occupancy
Design Professional
RSP Architects
Construction Schedule
November 2022 - January 2024
Contractor
Core Construction
57-0054
McClelland Hall Rooms 401-430 Remodel
PROJECT DETAILS
map
Jason Emmons.
Account 1790900.
Current Budget
$0
Projected Ultimate Budget
$1,210
Project Manager
Michael Seal
Construction Project Manager
Michael Seal
Phase
Design
Design Professional
None
Construction Schedule
TBD - TBD
Contractor
None
25-9781
McClelland Video Wall
PROJECT DETAILS
map
New Video wall in McCelland Hall Atrium
In Design
Current Budget
$220,000
Projected Ultimate Budget
$0
Project Manager
Drew Lutz
Construction Project Manager
Drew Lutz
Phase
Design
Design Professional
None
Construction Schedule
TBD - TBD
Contractor
None
26-9800
Modern Languages 350 Renovation
PROJECT DETAILS
map
Complete renovation to provide accessibility to this outdated but important and historic university classroom.
Construction underway.
Geofoam installed.
New concrete slab in place.
Abatement underway.
Current Budget
$3,530,000
Projected Ultimate Budget
$3,530,000
Project Manager
Roel Krabbendam
Construction Project Manager
Drew Lutz
Phase
Construction
Design Professional
BWS Architects
Construction Schedule
January 2026 - August 2026
Contractor
Chasse Contracting
23-9629
Multiple Pkg Garage Maint, Repairs & Parking Lot/Bike Path Imp FY23
PROJECT DETAILS
map
Maintenance, repairs, and Improvements to ten parking structures, six parking lots and one bike path.
Science Concourse bike path and ramp at Park are completed.
Parking lots 3113, 1016.2, 4059, 2235, 7121 and 5075 are paved. Repairs in all garages are completed. Replacement of gates at six garages is in progress.
Current Budget
$2,142,786
Projected Ultimate Budget
$1,600,000
Project Manager
Michael Seal
Construction Project Manager
Michael Seal
Phase
Construction
Design Professional
WGI Engineering
Construction Schedule
September 2022 - January 2024
Contractor
SMS Construction, LLC
26-9854
Oculus Feasibility Study MIL
PROJECT DETAILS
map
Feasibility study to assess the MEP infrastructure capacity of the Mission Integration Lab facility to accept and onboard a new piece of research equipment.
Feasibility Study currently being developed and options provided as needed for infrastructure upgrades
Current Budget
$50,000
Projected Ultimate Budget
$50,000
Project Manager
Brian Brandis
Construction Project Manager
Jon Ziegler
Phase
Design
Design Professional
Swaim Associates
Construction Schedule
TBD - TBD
Contractor
Concord General Contracting
23-9676
PAS Building, Rm 157 Lab Renovation
PROJECT DETAILS
map
Renovate space for Dr. Hassan.
Current Budget
$439,000
Projected Ultimate Budget
$439,000
Project Manager
Jon Ziegler
Construction Project Manager
Drew Lutz
Phase
Occupancy
Design Professional
Sears Gerbo
Construction Schedule
April 2024 - August 2024
Contractor
R W Burkel
23-9658
PBC, CAMI
PROJECT DETAILS
map
videocam
Located at the Phoenix Bioscience Core in downtown Phoenix.
Construction in progress
Current Budget
$232,000,000
Projected Ultimate Budget
$232,000,000
Project Manager
Brian Brandis
Construction Project Manager
Susie Burruel
Phase
Construction
Design Professional
SmithGroup
Construction Schedule
November 2024 - June 2027
Contractor
McCarthy Building Companies
23-9636
Phoenix Mining Mineral & Natural Resources Museum Renovations
PROJECT DETAILS
map
Renovation of existing Mining Mineral and Natural Resource Museum on the Capital Mall in Phoenix, AZ.
Schematic design phase is underway.
Current Budget
$12,000,000
Projected Ultimate Budget
$12,000,000
Project Manager
Brian Brandis
Construction Project Manager
Susie Burruel
Phase
Design
Design Professional
Gensler
Construction Schedule
December 2025 - September 2026
Contractor
Kitchell Contractors, Inc.
23-9656
Poetry Center & Education North Green Space
PROJECT DETAILS
map
Develop a new greenspace to the south of the Poetry Center building, between the Poetry Center and the Education North Building. The project will activate a range of new possibilities for Poetry Center programs, making significant new outdoor/indoor opportunities for day-to-day use and for events and receptions.
Current Budget
$1,100,000
Projected Ultimate Budget
$1,100,000
Project Manager
Brian Brandis
Construction Project Manager
Christopher Stebe
Phase
Occupancy
Design Professional
Line & Space
Construction Schedule
May 2025 - August 2025
Contractor
Lloyd Construction
22-9579
Scottsdale Waterfront Phoenix Embassy Building
PROJECT DETAILS
map
Fit out of existing office building for use by the University of Arizona administrative units in the Greater Phoenix area.
Current Budget
$6,225,000
Projected Ultimate Budget
$6,225,000
Project Manager
Susie Burruel
Construction Project Manager
Susie Burruel
Phase
Occupancy
Design Professional
Ayers Saint Gross
Construction Schedule
October 2022 - July 2023
Contractor
McCarthy Building Companies
19-9450
South Stadium Rowhouses
PROJECT DETAILS
map
This College of Architecture, Planning & Landscape Architecture (CAPLA) student design-build project is providing new faculty/staff temporary housing. Five rowhouses are located along Seventh Street, adjacent to the South Stadium Parking Garage.
Construction is near completion on the fifth/final rowhouse, pending driveway curb installation and final electrical hook-up to TEP transformer.
Current Budget
$1,150,000
Projected Ultimate Budget
$1,150,000
Project Manager
Brian Brandis
Construction Project Manager
Brian Brandis
Phase
Construction
Design Professional
CAPLA
Construction Schedule
February 2019 - December 2025
Contractor
CAPLA
24-9690
Steward Observatory Annex Renovations/Additions
PROJECT DETAILS
map
Additions and renovations to the existing Steward Observatory Annex.
Current Budget
$1,144,000
Projected Ultimate Budget
$1,144,000
Project Manager
Roel Krabbendam
Construction Project Manager
Susie Burruel
Phase
Occupancy
Design Professional
Poster, Mirto, McDonald
Construction Schedule
August 2024 - January 2025
Contractor
Concord General Contracting
22-9608
SUMC Building 19, Room 205 Remodeling
PROJECT DETAILS
map
This project remodels Room 205 in the Student Union Memorial Center to create a new restaurant concept that will feature bar food menu items as well as beer and wine. A small brewery will highlight the CALES master brewery program and produce beer on site that will be delivered directly to the new bar.
Current Budget
$1,535,000
Projected Ultimate Budget
$1,535,000
Project Manager
Susie Burruel
Construction Project Manager
Susie Burruel
Phase
Occupancy
Design Professional
Multistudio, Inc.
Construction Schedule
April 2023 - March 2025
Contractor
WE ONeil Construction Company Inc
26-9841
SUMC Gallagher Theater- Wildcat Welcome Center
PROJECT DETAILS
map
Centrally located inside the Student Union, this facility will welcome and introduce new and prospective students to the University of Arizona. A reception area and pre-function room will support a 200 seat presentation room and a flexible gathering space. Project completion is planned for August 2026.
Demolition started
Current Budget
$5,500,000
Projected Ultimate Budget
$1,550,000
Project Manager
Roel Krabbendam
Construction Project Manager
Drew Lutz
Phase
Construction
Design Professional
Swaim Associates
Construction Schedule
March 2026 - August 2026
Contractor
Concord General Contracting
56-0026
SUMC HW Project
PROJECT DETAILS
map
Deferred Maintinance.
Current Budget
$0
Projected Ultimate Budget
$3,000
Project Manager
Michael Seal
Construction Project Manager
Stephen Mikitish
Phase
Design
Design Professional
None
Construction Schedule
TBD - TBD
Contractor
None
56-0030
SUMC Interior Sewer Replacement
PROJECT DETAILS
map
SUMC Interior sewer replacement.
Account# 8078628.
Fund D1702.
S/R 1775525.
Current Budget
$0
Projected Ultimate Budget
$15,000
Project Manager
Michael Seal
Construction Project Manager
Stephen Mikitish
Phase
Design
Design Professional
None
Construction Schedule
TBD - TBD
Contractor
None
24-9691
SUMC-Bookstore Renovations
PROJECT DETAILS
map
Transition the Bookstore from book sales and re-imagine the space into the Campus Store to better serve a modern clientele.
Current Budget
$3,300,000
Projected Ultimate Budget
$3,300,000
Project Manager
Susie Burruel
Construction Project Manager
Susie Burruel
Phase
Occupancy
Design Professional
Onyx Creative
Construction Schedule
April 2024 - August 2024
Contractor
Concord General Contracting Inc
22-9576
The Paul and Alice Baker Center for Public Media
PROJECT DETAILS
map
videocam
Arizona Public Media (AZPM) is an editorially independent, member supported, not-for-profit public media organization provided by the University of Arizona as an educational and informational community service. AZPM exemplifies the goals and objectives of public media and furthers the land-grant mission of the University, serving all or parts of eleven Arizona counties with three public television program services, three public radio services, and a variety of online services at azpm.org. In addition to delivering programs from PBS, NPR, and the BBC, among others, AZPM produces award-winning original newscasts, public affairs programs, documentaries, and community engagement events for and about the people of Southern Arizona.

A new, modern facility for Arizona Public Media will better serve ever-changing community needs and interests, support the education and training of University of Arizona students, improve visibility and community access, and model the transparency aspect of journalism.
The new 50,000 sf facility will be designed specifically to meet current and future technical and broadcast requirements, including the replacement of much of AZPM’s aging broadcast production infrastructure as we transition to 4K production in preparation for the conversion to a new television broadcast standard (NextGen TV).
Current Budget
$63,000,000
Projected Ultimate Budget
$63,000,000
Project Manager
Roel Krabbendam
Construction Project Manager
Dana Sylvester
Phase
Occupancy
Design Professional
SmithGroup + Swaim
Construction Schedule
December 2023 - September 2025
Contractor
DPR Construction, Inc., A General Partnership
19-9463
UA Global Center, Park Student Union Renovations
PROJECT DETAILS
map
Renovations to former Park Student Union (PSU) will accommodate relocation and consolidation of the UA Global's functions from elsewhere on campus. The resulting Global Center will serve as a hub for international activities on Campus. The project is Initiative 4.2C4 of the UA Strategic Plan.
Current Budget
$9,900,000
Projected Ultimate Budget
$9,900,000
Project Manager
Dana Sylvester
Construction Project Manager
Dana Sylvester
Phase
Occupancy
Design Professional
BWS Architects
Construction Schedule
May 2019 - August 2023
Contractor
CORE Construction
22-9584
UA Global Center, Starbucks
PROJECT DETAILS
map
The existing bagel shop will be renovated into a Starbucks.
Current Budget
$1,025,000
Projected Ultimate Budget
$1,025,000
Project Manager
Dana Sylvester
Construction Project Manager
Dana Sylvester
Phase
Occupancy
Design Professional
BWS Architects
Construction Schedule
July 2022 - September 2022
Contractor
CORE Construction
56-0032
UA Social Sciences 4-Pipe AHU
PROJECT DETAILS
map
Don Mcloy.
Account 8078533.
Fund D1982.
S/R 1710782.
Current Budget
$0
Projected Ultimate Budget
$2,420
Project Manager
Michael Seal
Construction Project Manager
Don Mcloy
Phase
Design
Design Professional
None
Construction Schedule
TBD - TBD
Contractor
None
23-9635
UAHS Building 201 1st Flr Medical Imaging Admin/Faculty Offices Renovation
PROJECT DETAILS
map
Renovation of existing space to provide an Administrative Suite for the Department of Imaging.
Construction is underway. Current expected substantial completion is November 1, 2025.
Current Budget
$10,700,000
Projected Ultimate Budget
$10,700,000
Project Manager
Stephen Mikitish
Construction Project Manager
Stephen Mikitish
Phase
Construction
Design Professional
Sears Gerbo Architecture
Construction Schedule
July 2024 - July 2025
Contractor
Kitchell Construction
23-9639
Visual Arts Graduate Research Laboratory Renovation
PROJECT DETAILS
map
Reconfigure spaces inside the building to provide additional studios that can be assigned to graduate student, faculty and visiting artists. Enhanced presentation areas will also be created.
Current Budget
$3,142,000
Projected Ultimate Budget
$3,000,000
Project Manager
Roel Krabbendam
Construction Project Manager
Susie Burruel
Phase
Occupancy
Design Professional
BWS Architects
Construction Schedule
May 2024 - May 2025
Contractor
CORE Construction
An unhandled error has occurred.