Proposition 4 Allocation Balance Report
Proposition 4 Allocation Balance Report
as of March 23, 2026
Public Resources Code 90000
Prop 4 ABR Header
Chapter
Subsection
Department Program
Net
Allocation*
Enacted
Appropriations
Proposed Budget
Year
Outyear
Commitments**
Balance
Ch. 2
91011
State Water Resources Control Board:
Improve Water Quality or provide Clean, Safe, Reliable Drinking Water
$578,625,000
$183,167,000
$160,167,000
$9,711,000
$225,580,000
Ch. 2
91011(a)(8)
State Water Resources Control Board:
Tribal Water Infrastructure Projects
$26,800,000
$11,155,000
$12,870,000
$787,000
$1,988,000
Ch. 2
91012(a) and (b)
Department of Water Resources:
Groundwater Storage or Banking (Sustainable Groundwater Management Act)
$191,677,000
$15,000,000
$9,750,000
$5,250,000
$161,677,000
Ch. 2
91012(a) and (c)
Department of Water Resources:
Conjunctive Use and Groundwater Recharge
$191,677,000
$15,000,000
$9,750,000
$5,250,000
$161,677,000
Ch. 2
91013
Department of Conservation:
Multibenefit Land Repurposing Program for Groundwater Sustainability Projects
$198,500,000
$32,095,000
$64,900,000
$3,972,000
$97,533,000
Ch. 2
91014
State Water Resources Control Board:
Water Reuse and Recycling
$383,354,000
$153,400,000
$78,400,000
$8,600,000
$142,954,000
Ch. 2
91015
Department of Water Resources:
Water Storage Investment Program
$74,438,000
$74,438,000
$0
$0
$0
Ch. 2
91016
Department of Water Resources:
Brackish Desalination, Contaminant and Salt Removal, and Salinity Management
$62,032,000
$200,000
$600,000
$2,400,000
$58,832,000
Ch. 2
91017
Various:
Improve Water Data Management, Reactivate Existing Stream Gages, and Deploy New Gages
$14,888,000
$8,281,000
$1,200,000
$692,000
$4,715,000
Ch. 2
91018
Various:
Regional Conveyance Projects or Repairs to Existing Conveyances
$74,438,000
$2,650,000
$68,798,000
$2,590,000
$400,000
Ch. 2
91019
Department of Water Resources:
Water Conservation in Agricultural and Urban Areas
$74,438,000
$347,000
$1,265,000
$3,239,000
$69,587,000
Ch. 2
91021(a)
Department of Water Resources:
Flood Management Projects in Sacramento-San Joaquin Delta
$148,875,000
$0
$59,975,000
$9,900,000
$79,000,000
Ch. 2
91021(b)
Department of Water Resources:
Flood Control Subventions Program
$148,875,000
$123,400,000
$24,400,000
$1,075,000
$0
Ch. 2
91021(c)
Department of Water Resources:
State Plan of Flood Control Projects
$248,125,000
$63,125,000
$147,625,000
$1,375,000
$36,000,000
Ch. 2
91022
Department of Water Resources:
Dam Safety and Climate Resilience
$476,400,000
$231,534,000
$2,083,000
$8,333,000
$234,450,000
Ch. 2
91023
State Water Resources Control Board:
Multiple-Benefit Urban Stormwater Management
$109,175,000
$1,100,000
$39,400,000
$3,900,000
$64,775,000
Ch. 2
91031
Department of Water Resources:
Integrated Regional Water Management
$99,250,000
$469,000
$1,500,000
$5,031,000
$92,250,000
Ch. 2
91032(a)
San Gabriel and Lower Los Angeles Rivers and Mountains Conservancy:
Los Angeles River Watershed or consistent with Lower Los Angeles River Revitalization Plan
$39,700,000
$600,000
$10,500,000
$1,800,000
$26,800,000
Ch. 2
91032(b)
Santa Monica Mountains Conservancy:
Los Angeles River Watershed and Upper Los Angeles River and Tributaries Working group or Los Angeles River Master Plan
$39,700,000
$20,400,000
$6,400,000
$1,000,000
$11,900,000
Ch. 2
91032(c)
Department of Water Resources:
Riverine Stewardship Projects that Improve Climate Resiliency
$49,625,000
$1,100,000
$4,815,000
$2,550,000
$41,160,000
Ch. 2
91032(d)
State Coastal Conservancy:
Santa Ana River Conservancy Program
$24,812,000
$10,150,000
$194,000
$776,000
$13,692,000
Ch. 2
91032(e)
Department of Water Resources:
Urban Streams Restoration Program
$24,812,000
$1,250,000
$10,925,000
$1,200,000
$11,437,000
Ch. 2
91032(f)
Secretary for Natural Resources:
Wildlife Refuges and Wetland Habitat Improvement
$24,812,000
$163,000
$163,000
$652,000
$23,834,000
Ch. 2
91032(g)
Wildlife Conservation Board:
Lower American River Conservancy Program
$9,925,000
$3,000,000
$0
$0
$6,925,000
Ch. 2
91032(h)
State Coastal Conservancy:
Coyote Valley Conservation Program
$24,812,000
$3,050,000
$14,444,000
$776,000
$6,542,000
Ch. 2
91032(i)
State Coastal Conservancy:
West Coyote Hills Program
$24,812,000
$0
$23,256,000
$776,000
$780,000
Ch. 2
91032(j)
State Water Resources Control Board:
Cross-Border Rivers and Coastal Waters (Tijuana & New River)
$49,625,000
$46,551,000
$675,000
$2,025,000
$374,000
Ch. 2
91032(k)
Secretary for Natural Resources:
Clear Lake Watershed - Climate Resiliency and Protection
$19,850,000
$1,930,000
$16,880,000
$520,000
$520,000
Ch. 2
91033(a)
Various:
Salton Sea Management Program 10-year plan
$158,800,000
$148,166,000
$3,143,000
$7,491,000
$0
Ch. 2
91033(b)
Salton Sea Conservancy:
Salton Sea Conservancy
$9,925,000
$1,638,000
$3,224,000
$5,063,000
$0
Ch. 2
91040(a)
Wildlife Conservation Board:
Stream Flow Enhancement Program
$99,250,000
$20,500,000
$10,500,000
$2,000,000
$66,250,000
Ch. 2
91040(b)
Wildlife Conservation Board:
Habitat Enhancement and Restoration Program
$49,625,000
$10,500,000
$500,000
$1,500,000
$37,125,000
Ch. 2
91045
Secretary for Natural Resources:
Nature and Climate Education
$19,850,000
$15,130,000
$3,680,000
$520,000
$520,000
Ch. 3
91510
Office of Emergency Services:
Wildfire Mitigation Grant Program
$133,987,000
$13,000,000
$26,050,000
$4,200,000
$90,737,000
Ch. 3
91520(a)
Department of Conservation:
Regional Forest and Fire Capacity Program
$183,612,000
$10,105,000
$50,500,000
$4,025,000
$118,982,000
Ch. 3
91520(b)
Various:
Regional Projects
$168,725,000
$91,357,000
$39,097,000
$5,216,000
$33,055,000
Ch. 3
91520(c)
California Department of Forestry and Fire Protection:
Forest Health Program
$173,687,000
$92,163,000
$36,899,000
$5,600,000
$39,025,000
Ch. 3
91520(d)
California Department of Forestry and Fire Protection:
Local Fire Prevention Grants
$183,612,000
$81,100,000
$57,981,000
$9,531,000
$35,000,000
Ch. 3
91520(e)
California Department of Forestry and Fire Protection:
Fire Training Center
$24,812,000
$2,500,000
$5,000,000
$240,000
$17,072,000
Ch. 3
91520(f)
California State Parks:
Forest Health and Watershed Improvement Projects
$198,500,000
$33,400,000
$33,400,000
$1,600,000
$130,100,000
Ch. 3
91520(g)
California Department of Forestry and Fire Protection:
Fuel Reduction, Structure Hardening, Defensible space, Reforestation, or Targeted Acquisitions to Improve Forest Health and Fire Resilience
$49,625,000
$30,000,000
$19,625,000
$0
$0
Ch. 3
91520(h)
Sierra Nevada Conservancy:
Watershed Improvement, Forest Health, Biomass Utilization, Chaparral and Forest Restoration, and Workforce Development
$33,249,000
$30,955,000
$41,000
$656,000
$1,597,000
Ch. 3
91520(i)
California Tahoe Conservancy:
Watershed Improvement, Forest Health, Biomass Utilization, Chaparral and Forest Restoration, and Workforce Development
$25,309,000
$23,674,000
$150,000
$1,778,000
($293,000)
(a)
Ch. 3
91520(j)
Santa Monica Mountains Conservancy:
Watershed Improvement, Wildfire Resilience, Chaparral and Forest Restoration, and Workforce Development
$33,249,000
$31,749,000
$400,000
$1,100,000
$0
Ch. 3
91520(k)
State Coastal Conservancy:
Watershed Improvement, Wildfire Resilience, Chaparral and Forest Restoration, and Workforce Development
$33,249,000
$31,165,000
$261,000
$1,044,000
$779,000
Ch. 3
91520(l)
San Gabriel and Lower Los Angeles Rivers and Mountains Conservancy:
Watershed Improvement, Wildfire Resilience, Chaparral and Forest Restoration, and Workforce Development
$33,249,000
$31,104,000
$400,000
$1,545,000
$200,000
Ch. 3
91520(m)
San Diego River Conservancy:
Watershed Improvement, Wildfire Resilience, Chaparral and Forest Restoration, and Workforce Development
$25,309,000
$23,564,000
$200,000
$800,000
$745,000
Ch. 3
91520(n)
California Department of Forestry and Fire Protection:
Improve Firefighter Health and Safety, Advance Fire Attack Effectiveness, and Promote Community Resilience and Awareness
$14,887,000
$14,037,000
$200,000
$650,000
$0
Ch. 3
91520(o)
California Department of Forestry and Fire Protection:
Vegetation Mitigation, Fuels Reduction, Public Education and Outreach, Personal Protective Equipment, Specialized Firefighting Equipment, and Firefighter Health and Safety
$14,887,000
$14,037,000
$200,000
$650,000
$0
Ch. 3
91530
Department of Conservation:
Capital Infrastructure for Wildfire Mitigation Waste for Noncombustible Uses
$49,625,000
$10,630,000
$15,407,000
$1,250,000
$22,338,000
Ch. 3
91535
California Department of Forestry and Fire Protection:
Fire Ignition Detection Technology
$24,812,000
$23,262,000
$1,550,000
$0
$0
Ch. 3
91540
California Department of Forestry and Fire Protection:
Reduce Wildfire Risk Related to Electricity Transmission
$34,737,000
$0
$15,243,000
$968,000
$18,526,000
Ch. 3
91545(a)
California Conservation Corps:
Demonstrated Jobs Projects
$19,850,000
$0
$1,493,000
$2,334,000
$16,023,000
Ch. 3
91545(b)
California Conservation Corps:
Demonstrated Jobs Projects for Certified Community Conservation Corps
$29,775,000
$10,149,000
$10,149,000
$765,000
$8,712,000
Ch. 4
92010(a)
State Coastal Conservancy:
Coastal resilience project and programs
$327,525,000
$62,900,000
$33,057,000
$8,888,000
$222,680,000
Ch. 4
92010(b)
State Coastal Conservancy:
San Francisco Bay Restoration Authority Act/SF Bay Conservancy Program
$84,362,000
$40,560,000
$661,000
$2,644,000
$40,497,000
Ch. 4
92015
State Coastal Conservancy:
Coastal and Combined Flood Management Projects and Activities for Developed Shoreline Areas
$347,375,000
$33,295,000
$2,224,000
$8,890,000
$302,966,000
Ch. 4
92020
Secretary for Natural Resources:
Increase Ocean and Coastal Resilience from Impacts of Climate Change
$133,987,000
$22,750,000
$15,200,000
$3,750,000
$92,287,000
Ch. 4
92030
Secretary for Natural Resources:
Sea Level Rise Mitigation and Adaptation
$74,437,000
$20,250,000
$25,500,000
$2,350,000
$26,337,000
Ch. 4
92040
California State Parks:
Sea Level Rise Adaptation Strategy
$49,625,000
$24,000,000
$250,000
$1,000,000
$24,375,000
Ch. 4
92050
Various:
Island Ecosystems, Climate-Ready Fisheries Management, and Kelp Ecosystems
$74,437,000
$35,795,000
$10,200,000
$2,658,000
$25,784,000
Ch. 4
92060
State Coastal Conservancy:
Dam Removal and Related Water Infrastructure
$74,437,000
$34,600,000
$583,000
$2,332,000
$36,922,000
Ch. 4
92070
California Department of Fish and Wildlife:
Central Valley Chinook Salmon Hatcheries
$24,812,000
$5,000,000
$19,812,000
$0
$0
Ch. 5
92510
Land Use and Climate Innovation:
Extreme Heat and Community Resilience Program
$49,625,000
$23,050,000
$24,125,000
$2,450,000
$0
Ch. 5
92520
Land Use and Climate Innovation:
Transformative Climate Communities Program
$148,875,000
$1,000,000
$137,375,000
$7,036,000
$3,464,000
Ch. 5
92530
Secretary for Natural Resources:
Urban Greening
$99,250,000
$46,825,000
$700,000
$2,800,000
$48,925,000
Ch. 5
92540
California Department of Forestry and Fire Protection:
Urban Forests
$49,625,000
$500,000
$22,750,000
$3,400,000
$22,975,000
Ch. 5
92550
Land Use and Climate Innovation:
Community Resilience Centers
$59,550,000
$784,000
$55,284,000
$2,243,000
$1,239,000
Ch. 5
92560
California Department of Food and Agriculture:
Fairground Upgrades
$39,700,000
$37,600,000
$700,000
$1,400,000
$0
Ch. 6
93010
Wildlife Conservation Board:
Protect and Enhance Fish and Wildlife
$662,990,000
$256,000,000
$111,000,000
$4,500,000
$291,490,000
Ch. 6
93020(a)(1)
Baldwin Hills Conservancy:
Reduce the Risks of Climate Change Impacts
$47,640,000
$12,860,000
$400,000
$1,600,000
$32,780,000
Ch. 6
93020(a)(2)
California Tahoe Conservancy:
Reduce the Risks of Climate Change Impacts
$28,782,000
$5,372,000
$3,550,000
$10,333,000
$9,527,000
Ch. 6
93020(a)(3)
Coachella Valley Mountains Conservancy:
Reduce the Risks of Climate Change Impacts
$10,917,000
$2,300,000
$2,300,000
$450,000
$5,867,000
Ch. 6
93020(a)(4)
Sacramento-San Joaquin Delta Conservancy:
Reduce the Risks of Climate Change Impacts
$28,782,000
$4,300,000
$15,350,000
$600,000
$8,532,000
Ch. 6
93020(a)(5)
San Diego River Conservancy:
Reduce the Risks of Climate Change Impacts
$47,640,000
$8,100,000
$200,000
$800,000
$38,540,000
Ch. 6
93020(a)(6)
San Gabriel and Lower Los Angeles Rivers and Mountains Conservancy:
Reduce the Risks of Climate Change Impacts
$47,640,000
$10,300,000
$11,450,000
$2,000,000
$23,890,000
Ch. 6
93020(a)(7)
San Joaquin River Conservancy:
Reduce the Risks of Climate Change Impacts
$10,918,000
$5,307,000
$5,227,000
$384,000
$0
Ch. 6
93020(a)(8)
Santa Monica Mountains Conservancy:
Reduce the Risks of Climate Change Impacts
$47,640,000
$25,400,000
$7,400,000
$800,000
$14,040,000
Ch. 6
93020(a)(9)
Sierra Nevada Conservancy:
Reduce the Risks of Climate Change Impacts
$47,640,000
$9,925,000
$59,000
$944,000
$36,712,000
Ch. 6
93010; 93030 ref 1
Wildlife Conservation Board:
Improve Habitat Connectivity and Establish Wildlife Crossings and Corridors
$99,250,000
$20,500,000
$20,500,000
$2,000,000
$56,250,000
Ch. 6
93010; 93030 ref 2
Wildlife Conservation Board:
San Andreas Corridor Program
$79,400,000
$0
$20,000,000
$0
$59,400,000
Ch. 6
93040
Secretary for Natural Resources:
Tribal Nature-Based Solutions Program
$9,925,000
$9,400,000
$175,000
$350,000
$0
Ch. 6
93010; 93050
Wildlife Conservation Board:
Southern Ballona Creek Watershed
$21,835,000
$20,000,000
$1,835,000
$0
$0
Ch. 7
93510(a)
California Department of Food and Agriculture:
Soil Health, Atmospheric Carbon Removal, or Soil Carbon Sequestration
$64,513,000
$35,910,000
$25,873,000
$2,730,000
$0
Ch. 7
93510(b)
California Department of Food and Agriculture:
State Water Efficiency and Enhancement Program
$39,700,000
$37,600,000
$700,000
$1,400,000
$0
Ch. 7
93520
California Department of Food and Agriculture:
Invasive Species Projects
$19,850,000
$19,850,000
$0
$0
$0
Ch. 7
93530
Department of Conservation:
Protection, Restoration, Conservation and Enhancement of Farm and Range Lands
$14,888,000
$7,000,000
$150,000
$550,000
$7,188,000
Ch. 7
93540(a)
California Department of Food and Agriculture:
Certified Mobile Farmers' Markets
$19,850,000
$9,600,000
$9,550,000
$700,000
$0
Ch. 7
93540(b)
California Department of Food and Agriculture:
Year-Round Certified Farmers' Markets
$19,850,000
$9,600,000
$9,550,000
$700,000
$0
Ch. 7
93540(c)
California Department of Food and Agriculture:
Urban Agriculture Projects
$19,850,000
$18,800,000
$350,000
$700,000
$0
Ch. 7
93540(d)
California Department of Food and Agriculture:
Regional Farm Equipment Sharing
$14,888,000
$210,000
$14,048,000
$630,000
$0
Ch. 7
93540(e)
California Department of Food and Agriculture:
Tribal Food Sovereignty
$14,888,000
$210,000
$14,048,000
$630,000
$0
Ch. 7
93550
Department of Conservation:
Land Access and Tenure for Socially Disadvantaged Farmers or Ranchers, Tribal Producers, and Beginning Farmers and Ranchers
$29,775,000
$0
$4,975,000
$900,000
$23,900,000
Ch. 7
93560
Unspecified:
Vanpool Vehicles, Clean Technologies, and Infrastructure
$14,888,000
$0
$0
$0
$14,888,000
Ch. 7
93570
Department of Education:
Postsecondary Educational Institutions to Develop Research Farms to Improve Climate Resiliency
$14,888,000
$14,888,000
$0
$0
$0
Ch. 7
93580
Department of Community Services and Development:
Farmworkers Housing Component of the Low-Income Weatherization Program
$9,925,000
$230,000
$9,459,000
$236,000
$0
Ch. 8
94010(a)
California State Parks:
Creation, Expansion, and Renovation of Safe Neighborhood Parks
$178,650,000
$171,000,000
$1,710,000
$5,940,000
$0
Ch. 8
94010(c)
California State Parks:
Rehabilitation, Repurposing, or Substantial Improvement of Existing Park Infrastructure
$19,850,000
$19,000,000
$190,000
$660,000
$0
Ch. 8
94020
Various:
Reduction of Climate Impacts and Creation, Protection and Expansion of Outdoor Recreation
$198,500,000
$118,547,000
$25,866,000
$5,520,000
$48,567,000
Ch. 8
94030
Various:
Enhancement of the Natural Resource Value and Expanded Trail Access (non-motorized)
$99,250,000
$55,700,000
$700,000
$1,699,000
$41,151,000
Ch. 8
94040
California State Parks:
Deferred Maintenance
$173,688,000
$84,400,000
$400,000
$1,325,000
$87,563,000
Ch. 8
94050
Secretary for Natural Resources:
Nature Education Facilities
$24,813,000
$17,400,000
$6,333,000
$540,000
$540,000
Ch. 9
94520
California Infrastructure and Economic Development Bank:
Public Financing of Clean Energy Transmission Projects
$322,563,000
$0
$322,563,000
$0
$0
Ch. 9
94530
Energy Resources Conservation and Development Commission:
Long-Duration Energy Storage Program
$49,625,000
$46,641,000
$497,000
$1,989,000
$498,000
Ch. 9
94540
Energy Resources Conservation and Development Commission:
Development of offshore wind generation
$471,438,000
$228,219,000
$2,500,000
$10,000,000
$230,719,000
Program Total:
$9,925,000,000
$3,470,918,000
$2,103,557,000
$258,157,000
$4,092,368,000
Statewide Costs Requiring Appropriations:
$1,998,000
$2,733,000
$17,258,000
Total Appropriations:
$3,472,916,000
$2,106,290,000
$275,415,000
Numbers may not add or match to other statements due to rounding of budget details.
* Pursuant to PRC Section 90135 and 95011, the Net Allocation for the $10 billion bond has been reduced by $75,000,000 for bond issuance costs and other statewide bond costs.
**
Outyear commitments are funds reserved for ongoing state operations and previously approved capital outlay projects with phases extending beyond the budget year that are necessary to complete those projects.
Proposition 4 project funding, however, is proposed on a year-by-year basis and is not included in outyear commitments as part of a multiyear spending plan.
(a)
This allocation over-commitment will be resolved, as appropriate, as part of the budget process.
Prop. 4: Detailed Allocations, Appropriations, Proposals, Set Asides and Balances
(Amounts Are in Whole Dollars)
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91011
Allocation: Improve Water Quality or provide Clean, Safe, Reliable Drinking Water
Net Allocation: $578,625,000
Grants or loans that improve water quality or help provide clean, safe, and reliable drinking water.
PRC §91011
Department: State Water Resources Control Board
Purpose Type: Program Delivery
Chapter 2 PRC §91011
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3940-001-6093 (1)
3560
Budget Act
$2,604,000
Water Quality and Clean, Safe Reliable Drinking Water
06/30/2026
06/30/2028
B1215PD
Proposed
2026-27
3940-001-6093 (1)
3560
Budget Act
$2,604,000
Water Quality and Clean, Safe Reliable Drinking Water
06/30/2027
06/30/2029
B1215PD
Program Delivery Enacted Total: $2,604,000
Program Delivery Proposed Total: $2,604,000
PRC §91011
Department: State Water Resources Control Board
Purpose Type: Projects
Chapter 2 PRC §91011
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3940-101-6093 (1)
3560
Budget Act
$180,563,000
Water Quality and Clean, Safe Reliable Drinking Water
06/30/2030
06/30/2033
B1215PJ
Proposed
2026-27
3940-101-6093 (1)
3560
Budget Act
$157,563,000
Water Quality and Clean, Safe Reliable Drinking Water
06/30/2031
06/30/2034
B1215PJ
Projects Enacted Total: $180,563,000
Projects Proposed Total: $157,563,000
Summary for PRC §91011 - Improve Water Quality or provide Clean, Safe, Reliable Drinking Water
Allocation:
$583,000,000
Statewide Bond Costs:
$4,375,000
Enacted/Proposed Total:
$343,334,000
Outyear Commitments:
$9,711,000
Balance:
$225,580,000
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91011(a)(8)
Allocation: Tribal Water Infrastructure Projects
Net Allocation: $26,800,000
Tribal water infrastructure projects that provide safe, clean, and reliable drinking water to tribal communities.
PRC §91011(a)(8)
Department: State Water Resources Control Board
Purpose Type: Program Delivery
Chapter 2 PRC §91011(a)(8)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3940-002-6093 (1)
3560
Budget Act
$475,000
Tribal Water Infrastructure
06/30/2026
06/30/2028
B1216PD
Proposed
2026-27
3940-002-6093 (1)
3560
Budget Act
$475,000
Tribal Water Infrastructure
06/30/2027
06/30/2029
B1216PD
Program Delivery Enacted Total: $475,000
Program Delivery Proposed Total: $475,000
PRC §91011(a)(8)
Department: State Water Resources Control Board
Purpose Type: Projects
Chapter 2 PRC §91011(a)(8)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3940-102-6093 (1)
3560
Budget Act
$10,680,000
Tribal Water Infrastructure
06/30/2030
06/30/2033
B1216PJ
Proposed
2026-27
3940-102-6093 (1)
3560
Budget Act
$12,395,000
Tribal Water Infrastructure
06/30/2031
06/30/2034
B1216PJ
Projects Enacted Total: $10,680,000
Projects Proposed Total: $12,395,000
Summary for PRC §91011(a)(8) - Tribal Water Infrastructure Projects
Allocation:
$27,000,000
Statewide Bond Costs:
$200,000
Enacted/Proposed Total:
$24,025,000
Outyear Commitments:
$787,000
Balance:
$1,988,000
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91012(a) and (b)
Allocation: Groundwater Storage or Banking (Sustainable Groundwater Management Act)
Net Allocation: $191,677,000
Projects that increase groundwater storage, improve the management and operation of groundwater storage, or are for groundwater banking, and support implementation of the Sustainable Groundwater Management Act (Part 2.74 (commencing with Section 10720) of Division 6 of the Water Code). Of the funds made available pursuant to section 91012(b) and (c), a minimum of $25,000,000 shall be for projects that provide direct benefits to tribal communities.
PRC §91012(a) and (b)
Department: Department of Water Resources
Purpose Type: Program Delivery
Chapter 2 PRC §91012(a) and (b)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3860-002-6093 (1)
3230
Budget Act
$1,000,000
Groundwater Storage/Banking/Recharge and Instream Flow
06/30/2026
06/30/2028
B1175PD
Proposed
2026-27
3860-002-6093 (1)
3230
Budget Act
$2,000,000
Sustainable Groundwater Management Act Implementation
06/30/2027
06/30/2029
B1175PD
Program Delivery Enacted Total: $1,000,000
Program Delivery Proposed Total: $2,000,000
PRC §91012(a) and (b)
Department: Department of Water Resources
Purpose Type: Projects
Chapter 2 PRC §91012(a) and (b)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3860-102-6093 (1)
3230
Budget Act
$9,000,000
Groundwater Storage/Banking/Recharge and Instream Flow for Conjunctive Use of Groundwater and Surface Water Supplies
06/30/2028
06/30/2030
B1175PJ
Enacted
2025-26
3860-102-6093 (1)
3230
Budget Act
$1,750,000
Groundwater Sustainability Agencies Less than 10,000 Acre-Feet
06/30/2028
06/30/2030
B1175PJ
Proposed
2026-27
3860-001-6093 (1)
3230
Budget Act
$7,750,000
Sustainable Groundwater Management Act Implementation
06/30/2027
06/30/2029
B1175PJ
Projects Enacted Total: $10,750,000
Projects Proposed Total: $7,750,000
PRC §91012(a) and (b)
Department: Department of Water Resources
Purpose Type: Technical Assistance
Chapter 2 PRC §91012(a) and (b)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3860-102-6093 (1)
3230
Budget Act
$3,250,000
Underrepresented Communities, California Tribes, and Small Farmers Groundwater Technical Assistance
06/30/2028
06/30/2030
B1175TA
Technical Assistance Enacted Total: $3,250,000
Summary for PRC §91012(a) and (b) - Groundwater Storage or Banking (Sustainable Groundwater Management Act)
Allocation:
$193,125,000
Statewide Bond Costs:
$1,448,000
Enacted/Proposed Total:
$24,750,000
Outyear Commitments:
$5,250,000
Balance:
$161,677,000
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91012(a) and (c)
Allocation: Conjunctive Use and Groundwater Recharge
Net Allocation: $191,677,000
Projects that support conjunctive use and groundwater recharge. Projects shall: (A) Provide improved regional watershed management; (B) Address current and projected drought conditions and demonstrate adaptation to climate change for a region; (C) Provide ecosystem benefits to fish and wildlife and improve stream flow for anadromous fish. Of the funds made available pursuant to section 91012(b) and (c), a minimum of $25,000,000 shall be for projects that provide direct benefits to tribal communities.
PRC §91012(a) and (c)
Department: Department of Water Resources
Purpose Type: Program Delivery
Chapter 2 PRC §91012(a) and (c)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3860-002-6093 (1)
3230
Budget Act
$1,000,000
Groundwater Storage/Banking/Recharge and Instream Flow
06/30/2026
06/30/2028
B1177PD
Proposed
2026-27
3860-002-6093 (1)
3230
Budget Act
$2,000,000
Conjunctive Use and Groundwater Recharge
06/30/2027
06/30/2029
B1177PD
Program Delivery Enacted Total: $1,000,000
Program Delivery Proposed Total: $2,000,000
PRC §91012(a) and (c)
Department: Department of Water Resources
Purpose Type: Projects
Chapter 2 PRC §91012(a) and (c)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3860-102-6093 (1)
3230
Budget Act
$9,000,000
Groundwater Storage/Banking/Recharge and Instream Flow for Conjunctive Use of Groundwater and Surface Water Supplies
06/30/2028
06/30/2030
B1177PJ
Enacted
2025-26
3860-102-6093 (1)
3230
Budget Act
$1,750,000
Groundwater Sustainability Agencies Less than 10,000 Acre-Feet
06/30/2028
06/30/2030
B1177PJ
Proposed
2026-27
3860-001-6093 (1)
3230
Budget Act
$7,750,000
Conjunctive Use and Groundwater Recharge
06/30/2027
06/30/2029
B1177PJ
Projects Enacted Total: $10,750,000
Projects Proposed Total: $7,750,000
PRC §91012(a) and (c)
Department: Department of Water Resources
Purpose Type: Technical Assistance
Chapter 2 PRC §91012(a) and (c)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3860-102-6093 (1)
3230
Budget Act
$3,250,000
Underrepresented Communities, California Tribes, and Small Farmers Groundwater Technical Assistance
06/30/2028
06/30/2030
B1177TA
Technical Assistance Enacted Total: $3,250,000
Summary for PRC §91012(a) and (c) - Conjunctive Use and Groundwater Recharge
Allocation:
$193,125,000
Statewide Bond Costs:
$1,448,000
Enacted/Proposed Total:
$24,750,000
Outyear Commitments:
$5,250,000
Balance:
$161,677,000
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91013
Allocation: Multibenefit Land Repurposing Program for Groundwater Sustainability Projects
Net Allocation: $198,500,000
Department of Conservation’s Multibenefit Land Repurposing Program for groundwater sustainability projects that reduce groundwater use, repurpose irrigated agricultural land, provide wildlife habitat, improve drought resilience or floodwater management, or support implementation of the Sustainable Groundwater Management Act (Part 2.74 (commencing with Section 10720) of Division 6 of the Water Code).
PRC §91013
Department: Department of Conservation
Purpose Type: Program Delivery
Chapter 2 PRC §91013
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3480-001-6093 (1)
2430
Budget Act
$95,000
Multibenefit Land Repurposing Program (MLRP)
06/30/2026
06/30/2028
B1055PD
Proposed
2026-27
3480-001-6093 (1)
2430
Budget Act
$900,000
Multibenefit Land Repurposing Program (MLRP)
06/30/2027
06/30/2029
B1055PD
Program Delivery Enacted Total: $95,000
Program Delivery Proposed Total: $900,000
PRC §91013
Department: Department of Conservation
Purpose Type: Projects
Chapter 2 PRC §91013
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3480-101-6093 (1)
2430
Budget Act
$32,000,000
Multibenefit Land Repurposing Program (MLRP)
06/30/2028
06/30/2030
B1055PJ
Proposed
2026-27
3480-101-6093 (1)
2430
Budget Act
$64,000,000
Multibenefit Land Repurposing Program (MLRP)
06/30/2029
06/30/2031
B1055PJ
Projects Enacted Total: $32,000,000
Projects Proposed Total: $64,000,000
Summary for PRC §91013 - Multibenefit Land Repurposing Program for Groundwater Sustainability Projects
Allocation:
$200,000,000
Statewide Bond Costs:
$1,500,000
Enacted/Proposed Total:
$96,995,000
Outyear Commitments:
$3,972,000
Balance:
$97,533,000
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91014
Allocation: Water Reuse and Recycling
Net Allocation: $383,354,000
Grants and projects related to water reuse and recycling, including, but not limited to, the following: (1) Treatment, storage, conveyance, and distribution facilities for potable and nonpotable recycling projects; (2) Dedicated distribution infrastructure to serve residential, commercial, agricultural, and industrial end user retrofit projects to allow use of recycled water; (3) Multiple-benefit recycled water projects that improve water quality.
PRC §91014
Department: State Water Resources Control Board
Purpose Type: Program Delivery
Chapter 2 PRC §91014
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3940-003-6093 (1)
3560
Budget Act
$3,400,000
Water Reuse and Recycling
06/30/2026
06/30/2028
B1217PD
Proposed
2026-27
3940-003-6093 (1)
3560
Budget Act
$3,400,000
Water Reuse and Recycling
06/30/2027
06/30/2029
B1217PD
Program Delivery Enacted Total: $3,400,000
Program Delivery Proposed Total: $3,400,000
PRC §91014
Department: State Water Resources Control Board
Purpose Type: Projects
Chapter 2 PRC §91014
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3940-103-6093 (1)
3560
Budget Act
$150,000,000
Water Reuse and Recycling
06/30/2030
06/30/2033
B1217PJ
Proposed
2026-27
3940-103-6093 (1)
3560
Budget Act
$75,000,000
Water Reuse and Recycling
06/30/2031
06/30/2034
B1217PJ
Projects Enacted Total: $150,000,000
Projects Proposed Total: $75,000,000
Summary for PRC §91014 - Water Reuse and Recycling
Allocation:
$386,250,000
Statewide Bond Costs:
$2,896,000
Enacted/Proposed Total:
$231,800,000
Outyear Commitments:
$8,600,000
Balance:
$142,954,000
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91015
Allocation: Water Storage Investment Program
Net Allocation: $74,438,000
Projects under the Water Storage Investment Program. Priority for these funds and any funds returned to the commission shall be to support timely completion of existing approved projects by providing supplemental grants to reflect the increase in costs due to inflation since the original grant applications and any increase in public benefits.
PRC §91015
Department: Department of Water Resources
Purpose Type: Program Delivery
Chapter 2 PRC §91015
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3860-004-6093 (1)
3230
Budget Act
$375,000
California Water Commission - Projects under the Water Storage Investment Plan
06/30/2026
06/30/2028
B1205PD
Program Delivery Enacted Total: $375,000
PRC §91015
Department: Department of Water Resources
Purpose Type: Projects
Chapter 2 PRC §91015
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3860-104-6093 (1)
3230
Budget Act
$74,063,000
California Water Commission - Projects under the Water Storage Investment Plan
06/30/2028
06/30/2030
B1205PJ
Projects Enacted Total: $74,063,000
Summary for PRC §91015 - Water Storage Investment Program
Allocation:
$75,000,000
Statewide Bond Costs:
$562,000
Enacted/Proposed Total:
$74,438,000
Outyear Commitments:
$0
Balance:
$0
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91016
Allocation: Brackish Desalination, Contaminant and Salt Removal, and Salinity Management
Net Allocation: $62,032,000
Capital investments in brackish desalination, contaminant and salt removal, and salinity management projects to improve California water and drought resilience. Priority shall be given to projects that use new incremental eligible renewable energy resources during operation and reduce greenhouse gas emissions associated with their construction and operation.
PRC §91016
Department: Department of Water Resources
Purpose Type: Program Delivery
Chapter 2 PRC §91016
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3860-001-6093 (1)
3230
Budget Act
$200,000
Brackish Desalination, Contaminant, and Salt removal, and Salinity Management Projects
06/30/2026
06/30/2028
B1179PD
Proposed
2026-27
3860-001-6093 (1)
3230
Budget Act
$600,000
Desalination Grant Program
06/30/2027
06/30/2029
B1179PD
Program Delivery Enacted Total: $200,000
Program Delivery Proposed Total: $600,000
Summary for PRC §91016 - Brackish Desalination, Contaminant and Salt Removal, and Salinity Management
Allocation:
$62,500,000
Statewide Bond Costs:
$468,000
Enacted/Proposed Total:
$800,000
Outyear Commitments:
$2,400,000
Balance:
$58,832,000
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91017
Allocation: Improve Water Data Management, Reactivate Existing Stream Gages, and Deploy New Gages
Net Allocation: $14,888,000
Improve water data management and to implement Section 144 of the Water Code to reactivate existing stream gages and deploy new gages.
PRC §91017
Department: Department of Water Resources
Purpose Type: Program Delivery
Chapter 2 PRC §91017
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3860-001-6093 (1)
3230
Budget Act
$140,000
Improve Water Data Management and Reactivate Existing and Deploy New Gages
06/30/2026
06/30/2028
B1180PD
Proposed
2026-27
3860-001-6093 (1)
3230
Budget Act
$140,000
California Stream Gage Improvement Program (CalSIP)
06/30/2027
06/30/2029
B1180PD
Program Delivery Enacted Total: $140,000
Program Delivery Proposed Total: $140,000
PRC §91017
Department: State Water Resources Control Board
Purpose Type: Program Delivery
Chapter 2 PRC §91017
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3940-004-6093 (1)
3570
Budget Act
$25,000
Improve Water Data Management and Reactivate Existing and Deploy New Gages
06/30/2026
06/30/2028
B1218PD
Proposed
2026-27
3940-004-6093 (1)
3570
Budget Act
$50,000
Improve Water Data Management and Reactivate Existing and Deploy New Gages
06/30/2027
06/30/2029
B1218PD
Program Delivery Enacted Total: $25,000
Program Delivery Proposed Total: $50,000
PRC §91017
Department: Department of Water Resources
Purpose Type: Projects
Chapter 2 PRC §91017
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3860-106-6093 (1)
3230
Budget Act
$7,785,000
Reactivate Existing Stream Gages and Deploy New Gages
06/30/2028
06/30/2030
B1180PJ
Proposed
2026-27
3860-001-6093 (1)
3230
Budget Act
$360,000
California Stream Gage Improvement Program (CalSIP)
06/30/2027
06/30/2029
B1180PJ
Projects Enacted Total: $7,785,000
Projects Proposed Total: $360,000
PRC §91017
Department: State Water Resources Control Board
Purpose Type: Projects
Chapter 2 PRC §91017
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3940-104-6093 (1)
3570
Budget Act
$331,000
Improve Water Data Management and Reactivate Existing and Deploy New Gages
06/30/2028
06/30/2030
B1218PJ
Proposed
2026-27
3940-104-6093 (1)
3570
Budget Act
$650,000
Improve Water Data Management and Reactivate Existing and Deploy New Gages
06/30/2029
06/30/2031
B1218PJ
Projects Enacted Total: $331,000
Projects Proposed Total: $650,000
Summary for PRC §91017 - Improve Water Data Management, Reactivate Existing Stream Gages, and Deploy New Gages
Allocation:
$15,000,000
Statewide Bond Costs:
$112,000
Enacted/Proposed Total:
$9,481,000
Outyear Commitments:
$692,000
Balance:
$4,715,000
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91018
Allocation: Regional Conveyance Projects or Repairs to Existing Conveyances
Net Allocation: $74,438,000
Competitive grants for regional conveyance projects or repairs to existing conveyances. Priority shall be given to projects that provide one or more of the following benefits: (a) Improvements in regional or interregional water supply or water supply reliability; (b) Increased groundwater recharge or mitigation of conditions of groundwater overdraft, salinity intrusion, water quality degradation, or subsidence; (c) Adaptation to the impacts of hydrologic changes; (d) Improvements in water security from drought, natural disasters, or other events that could interrupt water supplies; (e) Providing safe drinking water for disadvantaged communities and economically distressed areas.
PRC §91018
Department: Secretary for Natural Resources
Purpose Type: Program Delivery
Chapter 2 PRC §91018
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Proposed
2026-27
0540-001-6093 (1)
0320
Budget Act
$798,000
Repairs to Existing Conveyances
06/30/2027
06/30/2029
B1011PD
Program Delivery Proposed Total: $798,000
PRC §91018
Department: Department of Water Resources
Purpose Type: Program Delivery
Chapter 2 PRC §91018
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3860-001-6093 (1)
3230
Budget Act
$650,000
Regional Conveyance Projects or Repairs to Existing Conveyances
06/30/2026
06/30/2028
B1181PD
Program Delivery Enacted Total: $650,000
PRC §91018
Department: Secretary for Natural Resources
Purpose Type: Projects
Chapter 2 PRC §91018
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Proposed
2026-27
0540-101-6093 (1)
0320
Budget Act
$68,000,000
Regional Conveyance Projects or Repairs to Existing Conveyances
06/30/2029
06/30/2031
B1011PJ
Projects Proposed Total: $68,000,000
PRC §91018
Department: Department of Water Resources
Purpose Type: Projects
Chapter 2 PRC §91018
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3860-101-6093 (1)
3230
Budget Act
$2,000,000
Subsidence Repair Projects Related to Existing Conveyance Projects
06/30/2028
06/30/2030
B1181PJ
Projects Enacted Total: $2,000,000
Summary for PRC §91018 - Regional Conveyance Projects or Repairs to Existing Conveyances
Allocation:
$75,000,000
Statewide Bond Costs:
$562,000
Enacted/Proposed Total:
$71,448,000
Outyear Commitments:
$2,590,000
Balance:
$400,000
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91019
Allocation: Water Conservation in Agricultural and Urban Areas
Net Allocation: $74,438,000
Projects that increase water conservation in agricultural and urban areas.
PRC §91019
Department: Department of Water Resources
Purpose Type: Program Delivery
Chapter 2 PRC §91019
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3860-001-6093 (1)
3230
Budget Act
$197,000
CIMIS Expansion and Site Improvement Project
06/30/2026
06/30/2028
B1182PD
Enacted
2025-26
3860-001-6093 (1)
3230
Budget Act
$150,000
Watershed Resilience Grant Program
06/30/2026
06/30/2028
B1183PD
Proposed
2026-27
3860-001-6093 (1)
3230
Budget Act
$39,000
CIMIS Expansion and Site Improvement Project
06/30/2027
06/30/2029
B1182PD
Proposed
2026-27
3860-001-6093 (1)
3230
Budget Act
$484,000
Watershed Resilience Grant Program
06/30/2027
06/30/2029
B1183PD
Program Delivery Enacted Total: $347,000
Program Delivery Proposed Total: $523,000
PRC §91019
Department: Department of Water Resources
Purpose Type: Projects
Chapter 2 PRC §91019
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Proposed
2026-27
3860-102-6093 (1)
3230
Budget Act
$742,000
Increasing Water Conservation in Urban and Agricultural Areas
06/30/2029
06/30/2031
B1182PJ
Projects Proposed Total: $742,000
Summary for PRC §91019 - Water Conservation in Agricultural and Urban Areas
Allocation:
$75,000,000
Statewide Bond Costs:
$562,000
Enacted/Proposed Total:
$1,612,000
Outyear Commitments:
$3,239,000
Balance:
$69,587,000
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91021(a)
Allocation: Flood Management Projects in Sacramento-San Joaquin Delta
Net Allocation: $148,875,000
Projects in the Sacramento-San Joaquin Delta to improve existing levees to increase flood protection and improve climate resiliency. For purposes of this subdivision, “Sacramento-San Joaquin Delta” has the same meaning as described in Section 12220 of the Water Code.
PRC §91021(a)
Department: Department of Water Resources
Purpose Type: Program Delivery
Chapter 2 PRC §91021(a)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Proposed
2026-27
3860-003-6093 (1)
3245
Budget Act
$600,000
Delta Levees Program
06/30/2027
06/30/2029
B1184PD
Program Delivery Proposed Total: $600,000
PRC §91021(a)
Department: Department of Water Resources
Purpose Type: Projects
Chapter 2 PRC §91021(a)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Proposed
2026-27
3860-103-6093 (1)
3245
Budget Act
$59,375,000
Delta Levees Program
06/30/2029
06/30/2031
B1184PJ
Projects Proposed Total: $59,375,000
Summary for PRC §91021(a) - Flood Management Projects in Sacramento-San Joaquin Delta
Allocation:
$150,000,000
Statewide Bond Costs:
$1,125,000
Enacted/Proposed Total:
$59,975,000
Outyear Commitments:
$9,900,000
Balance:
$79,000,000
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91021(b)
Allocation: Flood Control Subventions Program
Net Allocation: $148,875,000
Projects that implement the Flood Control Subventions Program
PRC §91021(b)
Department: Department of Water Resources
Purpose Type: Program Delivery
Chapter 2 PRC §91021(b)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3860-003-6093 (1)
3245
Budget Act
$5,500,000
Flood Management Projects: Flood Control Subventions Program
06/30/2026
06/30/2028
B1185PD
Proposed
2026-27
3860-003-6093 (1)
3245
Budget Act
$650,000
Statewide Flood Control Subventions
06/30/2027
06/30/2029
B1185PD
Program Delivery Enacted Total: $5,500,000
Program Delivery Proposed Total: $650,000
PRC §91021(b)
Department: Department of Water Resources
Purpose Type: Projects
Chapter 2 PRC §91021(b)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3860-105-6093 (1)
3245
Budget Act
$104,500,000
Flood Control Subventions Program
06/30/2028
06/30/2030
B1185PJ
Enacted
2025-26
3860-105-6093 (1)
3245
Budget Act
$13,400,000
Flood Control Subventions Program - Flood Protection for Multiple Counties and Disadvantaged Communities
06/30/2028
06/30/2030
B1185PJ
Proposed
2026-27
3860-105-6093 (1)
3245
Budget Act
$23,750,000
Flood Control Subventions Program
06/30/2029
06/30/2031
B1185PJ
Projects Enacted Total: $117,900,000
Projects Proposed Total: $23,750,000
Summary for PRC §91021(b) - Flood Control Subventions Program
Allocation:
$150,000,000
Statewide Bond Costs:
$1,125,000
Enacted/Proposed Total:
$147,800,000
Outyear Commitments:
$1,075,000
Balance:
$0
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91021(c)
Allocation: State Plan of Flood Control Projects
Net Allocation: $248,125,000
Projects related to the systemwide evaluation, repair, rehabilitation, reconstruction, expansion, or replacement of levees, weirs, bypasses, and facilities of the State Plan of Flood Control.
PRC §91021(c)
Department: Department of Water Resources
Purpose Type: Program Delivery
Chapter 2 PRC §91021(c)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3860-003-6093 (1)
3245
Budget Act
$625,000
State Plan of Flood Control
06/30/2026
06/30/2028
B1186PD
Proposed
2026-27
3860-003-6093 (1)
3245
Budget Act
$1,500,000
Small Communities Flood Risk Reduction
06/30/2027
06/30/2029
B1186PD
Program Delivery Enacted Total: $625,000
Program Delivery Proposed Total: $1,500,000
PRC §91021(c)
Department: Department of Water Resources
Purpose Type: Projects
Chapter 2 PRC §91021(c)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3860-103-6093 (1)
3245
Budget Act
$33,600,000
State Plan of Flood Control
06/30/2028
06/30/2030
B1186PJ
Enacted
2025-26
3860-103-6093 (1)
3245
Budget Act
$15,000,000
State Plan of Flood Control
06/30/2028
06/30/2030
B1187PJ
Enacted
2025-26
3860-302-6093 (1)(b)
0000743
Budget Act
$13,600,000
Urban Flood Risk Reduction - Construction
06/30/2028
06/30/2030
B1188PJ
Enacted
2025-26
3860-302-6093 (1)(a)
0000743
Budget Act
$300,000
Urban Flood Risk Reduction - Preliminary Plans
06/30/2028
06/30/2030
B1188PJ
Proposed
2026-27
3860-103-6093 (1)
3245
Budget Act
$12,900,000
Small Communities Flood Risk Reduction
06/30/2029
06/30/2031
B1186PJ
Proposed
2026-27
3860-302-6093 (2)(a)
0000745
Budget Act
$24,124,000
Systemwide Flood Risk Reduction: Construction
06/30/2029
06/30/2031
B1187PJ
Proposed
2026-27
3860-302-6093 (2)(b)
0000745
Budget Act
$1,000
Systemwide Flood Risk Reduction: Various
06/30/2029
06/30/2031
B1187PJ
Proposed
2026-27
3860-302-6093 (1)(a)
0000743
Budget Act
$109,099,000
Urban Flood Risk Reduction Program: Construction
06/30/2029
06/30/2031
B1188PJ
Proposed
2026-27
3860-302-6093 (1)(b)
0000743
Budget Act
$1,000
Urban Flood Risk Reduction Program: Various
06/30/2029
06/30/2031
B1188PJ
Projects Enacted Total: $62,500,000
Projects Proposed Total: $146,125,000
Summary for PRC §91021(c) - State Plan of Flood Control Projects
Allocation:
$250,000,000
Statewide Bond Costs:
$1,875,000
Enacted/Proposed Total:
$210,750,000
Outyear Commitments:
$1,375,000
Balance:
$36,000,000
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91022
Allocation: Dam Safety and Climate Resilience
Net Allocation: $476,400,000
Dam Safety and Climate Resilience Local Assistance Program for competitive grants for projects that enhance dam safety and reservoir operations and protect public benefits pursuant to Section 6700 of the Water Code.
PRC §91022
Department: Department of Water Resources
Purpose Type: Program Delivery
Chapter 2 PRC §91022
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3860-003-6093 (1)
3245
Budget Act
$3,334,000
Dam Safety and Climate Resilience
06/30/2026
06/30/2028
B1189PD
Proposed
2026-27
3860-003-6093 (1)
3245
Budget Act
$2,083,000
Dam Safety and Climate Resilience Grant Program
06/30/2027
06/30/2029
B1189PD
Program Delivery Enacted Total: $3,334,000
Program Delivery Proposed Total: $2,083,000
PRC §91022
Department: Department of Water Resources
Purpose Type: Projects
Chapter 2 PRC §91022
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3860-103-6093 (1)
3245
Budget Act
$228,200,000
Dam Safety and Climate Resilience Local Assistance Program
06/30/2028
06/30/2030
B1189PJ
Projects Enacted Total: $228,200,000
Summary for PRC §91022 - Dam Safety and Climate Resilience
Allocation:
$480,000,000
Statewide Bond Costs:
$3,600,000
Enacted/Proposed Total:
$233,617,000
Outyear Commitments:
$8,333,000
Balance:
$234,450,000
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91023
Allocation: Multiple-Benefit Urban Stormwater Management
Net Allocation: $109,175,000
Projects funded pursuant to this section shall address flooding in urbanized areas and provide multiple benefits, with preference given to natural infrastructure projects. Eligible stormwater projects shall include, but are not limited to, stormwater capture and reuse, planning and implementation of low-impact development, restoration of urban streams and watersheds, debris flow mitigation, and increasing permeable surfaces to help reduce flooding.
PRC §91023
Department: State Water Resources Control Board
Purpose Type: Program Delivery
Chapter 2 PRC §91023
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3940-005-6093 (1)
3560
Budget Act
$1,100,000
Multibenefit Urban Stormwater Management Projects
06/30/2026
06/30/2028
B1219PD
Proposed
2026-27
3940-005-6093 (1)
3560
Budget Act
$1,400,000
Multibenefit Urban Stormwater Management Projects
06/30/2027
06/30/2029
B1219PD
Program Delivery Enacted Total: $1,100,000
Program Delivery Proposed Total: $1,400,000
PRC §91023
Department: State Water Resources Control Board
Purpose Type: Projects
Chapter 2 PRC §91023
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Proposed
2026-27
3940-105-6093 (1)
3560
Budget Act
$38,000,000
Multibenefit Urban Stormwater Management Projects
06/30/2029
06/30/2032
B1219PJ
Projects Proposed Total: $38,000,000
Summary for PRC §91023 - Multiple-Benefit Urban Stormwater Management
Allocation:
$110,000,000
Statewide Bond Costs:
$825,000
Enacted/Proposed Total:
$40,500,000
Outyear Commitments:
$3,900,000
Balance:
$64,775,000
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91031
Allocation: Integrated Regional Water Management
Net Allocation: $99,250,000
Projects related to integrated regional water management to improve climate resilience on a watershed basis. The department shall update and revise the guidelines for the integrated regional water management program to address impacts associated with climate risk.
PRC §91031
Department: Department of Water Resources
Purpose Type: Program Delivery
Chapter 2 PRC §91031
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3860-001-6093 (1)
3230
Budget Act
$469,000
Integrated Regional Water Management
06/30/2026
06/30/2028
B1190PD
Proposed
2026-27
3860-001-6093 (1)
3230
Budget Act
$1,500,000
Watershed Resilience Program
06/30/2027
06/30/2029
B1190PD
Program Delivery Enacted Total: $469,000
Program Delivery Proposed Total: $1,500,000
Summary for PRC §91031 - Integrated Regional Water Management
Allocation:
$100,000,000
Statewide Bond Costs:
$750,000
Enacted/Proposed Total:
$1,969,000
Outyear Commitments:
$5,031,000
Balance:
$92,250,000
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91032(a)
Allocation: Los Angeles River Watershed or consistent with Lower Los Angeles River Revitalization Plan
Net Allocation: $39,700,000
Projects that improve the climate resiliency or the protection of the Los Angeles River Watershed or are consistent with the Lower Los Angeles River Revitalization Plan.
PRC §91032(a)
Department: San Gabriel and Lower Los Angeles Rivers and Mountains Conservancy
Purpose Type: Program Delivery
Chapter 2 PRC §91032(a)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3825-001-6093 (1)
2990
Budget Act
$100,000
Climate Resiliency or Protection of the LA River Watershed or Lower LA River Revitalization Plan
06/30/2026
06/30/2028
B1145PD
Proposed
2026-27
3825-001-6093 (1)
2990
Budget Act
$500,000
Climate Resiliency or Protection of the LA River Watershed or Lower LA River Revitalization Plan
06/30/2027
06/30/2029
B1145PD
Program Delivery Enacted Total: $100,000
Program Delivery Proposed Total: $500,000
PRC §91032(a)
Department: San Gabriel and Lower Los Angeles Rivers and Mountains Conservancy
Purpose Type: Projects
Chapter 2 PRC §91032(a)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3825-101-6093 (1)
2990
Budget Act
$500,000
Climate Resiliency or Protection of the LA River Watershed or Lower LA River Revitalization Plan
06/30/2028
06/30/2030
B1145PJ
Proposed
2026-27
3825-101-6093 (1)
2990
Budget Act
$10,000,000
Climate Resiliency or Protection of the LA River Watershed or Lower LA River Revitalization Plan
06/30/2029
06/30/2031
B1145PJ
Projects Enacted Total: $500,000
Projects Proposed Total: $10,000,000
Summary for PRC §91032(a) - Los Angeles River Watershed or consistent with Lower Los Angeles River Revitalization Plan
Allocation:
$40,000,000
Statewide Bond Costs:
$300,000
Enacted/Proposed Total:
$11,100,000
Outyear Commitments:
$1,800,000
Balance:
$26,800,000
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91032(b)
Allocation: Los Angeles River Watershed and Upper Los Angeles River and Tributaries Working group or Los Angeles River Master Plan
Net Allocation: $39,700,000
Projects that improve the climate resiliency or the protection of the Los Angeles River Watershed and are a part of the revitalization plan developed by the Upper Los Angeles River and Tributaries Working Group pursuant to Section 33220 or the Los Angeles River Master Plan.
PRC §91032(b)
Department: Santa Monica Mountains Conservancy
Purpose Type: Program Delivery
Chapter 2 PRC §91032(b)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3810-001-6093 (1)
2940
Budget Act
$400,000
Climate Resiliency or Protection of the LA River Watershed and Upper LA River and Tributaries
06/30/2026
06/30/2028
B1135PD
Proposed
2026-27
3810-001-6093 (1)
2940
Budget Act
$400,000
Climate Resiliency or Protection of the LA River Watershed and Upper LA River and Tributaries
06/30/2027
06/30/2029
B1135PD
Program Delivery Enacted Total: $400,000
Program Delivery Proposed Total: $400,000
PRC §91032(b)
Department: Santa Monica Mountains Conservancy
Purpose Type: Projects
Chapter 2 PRC §91032(b)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3810-101-6093 (1)
2945
Budget Act
$20,000,000
Climate Resiliency or Protection of the LA River Watershed and Upper LA River and Tributaries
06/30/2028
06/30/2030
B1135PJ
Proposed
2026-27
3810-101-6093 (1)
2945
Budget Act
$6,000,000
Climate Resiliency or Protection of the LA River Watershed and Upper LA River and Tributaries
06/30/2029
06/30/2031
B1135PJ
Projects Enacted Total: $20,000,000
Projects Proposed Total: $6,000,000
Summary for PRC §91032(b) - Los Angeles River Watershed and Upper Los Angeles River and Tributaries Working group or Los Angeles River Master Plan
Allocation:
$40,000,000
Statewide Bond Costs:
$300,000
Enacted/Proposed Total:
$26,800,000
Outyear Commitments:
$1,000,000
Balance:
$11,900,000
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91032(c)
Allocation: Riverine Stewardship Projects that Improve Climate Resiliency
Net Allocation: $49,625,000
Projects that improve climate resiliency under the Riverine Stewardship Program established pursuant to Water Code Section 7049.
PRC §91032(c)
Department: Department of Water Resources
Purpose Type: Program Delivery
Chapter 2 PRC §91032(c)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3860-001-6093 (1)
3230
Budget Act
$100,000
Riverine Stewardship Program
06/30/2026
06/30/2028
B1191PD
Proposed
2026-27
3860-001-6093 (1)
3230
Budget Act
$356,000
Riverine Stewardship Program
06/30/2027
06/30/2029
B1191PD
Program Delivery Enacted Total: $100,000
Program Delivery Proposed Total: $356,000
PRC §91032(c)
Department: Department of Water Resources
Purpose Type: Projects
Chapter 2 PRC §91032(c)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3860-102-6093 (1)
3230
Budget Act
$1,000,000
Riverine Stewardship Program
06/30/2028
06/30/2030
B1191PJ
Proposed
2026-27
3860-102-6093 (1)
3230
Budget Act
$4,459,000
Riverine Stewardship Program
06/30/2029
06/30/2031
B1191PJ
Projects Enacted Total: $1,000,000
Projects Proposed Total: $4,459,000
Summary for PRC §91032(c) - Riverine Stewardship Projects that Improve Climate Resiliency
Allocation:
$50,000,000
Statewide Bond Costs:
$375,000
Enacted/Proposed Total:
$5,915,000
Outyear Commitments:
$2,550,000
Balance:
$41,160,000
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91032(d)
Allocation: Santa Ana River Conservancy Program
Net Allocation: $24,812,000
Projects for the Santa Ana River Conservancy Program.
PRC §91032(d)
Department: State Coastal Conservancy
Purpose Type: Program Delivery
Chapter 2 PRC §91032(d)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3760-001-6093 (1)
2805032
Budget Act
$150,000
Santa Ana River Conservancy Program
06/30/2026
06/30/2028
B1105PD
Proposed
2026-27
3760-001-6093 (1)
2790
Budget Act
$194,000
Santa Ana River Conservancy Program
06/30/2027
06/30/2029
B1105PD
Program Delivery Enacted Total: $150,000
Program Delivery Proposed Total: $194,000
PRC §91032(d)
Department: State Coastal Conservancy
Purpose Type: Projects
Chapter 2 PRC §91032(d)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3760-101-6093 (1)
2805032
Budget Act
$10,000,000
Santa Ana River Conservancy Program
06/30/2028
06/30/2030
B1105PJ
Projects Enacted Total: $10,000,000
Summary for PRC §91032(d) - Santa Ana River Conservancy Program
Allocation:
$25,000,000
Statewide Bond Costs:
$188,000
Enacted/Proposed Total:
$10,344,000
Outyear Commitments:
$776,000
Balance:
$13,692,000
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91032(e)
Allocation: Urban Streams Restoration Program
Net Allocation: $24,812,000
Multiple-benefit urban stream and river projects under the Urban Streams Restoration Program established pursuant to Section 7048 of the Water Code that protect and restore riparian habitats, improve climate resilience, enhance natural drainages, protect and restore watersheds, and provide public access.
PRC §91032(e)
Department: Department of Water Resources
Purpose Type: Program Delivery
Chapter 2 PRC §91032(e)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3860-001-6093 (1)
3230
Budget Act
$250,000
Urban Streams Restoration Program
06/30/2026
06/30/2028
B1192PD
Proposed
2026-27
3860-001-6093 (1)
3230
Budget Act
$300,000
Urban Streams Restoration Program
06/30/2027
06/30/2029
B1192PD
Program Delivery Enacted Total: $250,000
Program Delivery Proposed Total: $300,000
PRC §91032(e)
Department: Department of Water Resources
Purpose Type: Projects
Chapter 2 PRC §91032(e)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3860-102-6093 (1)
3230
Budget Act
$1,000,000
Urban Streams Restoration Program
06/30/2028
06/30/2030
B1192PJ
Proposed
2026-27
3860-102-6093 (1)
3230
Budget Act
$10,625,000
Urban Streams Restoration Program
06/30/2029
06/30/2031
B1192PJ
Projects Enacted Total: $1,000,000
Projects Proposed Total: $10,625,000
Summary for PRC §91032(e) - Urban Streams Restoration Program
Allocation:
$25,000,000
Statewide Bond Costs:
$188,000
Enacted/Proposed Total:
$12,175,000
Outyear Commitments:
$1,200,000
Balance:
$11,437,000
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91032(f)
Allocation: Wildlife Refuges and Wetland Habitat Improvement
Net Allocation: $24,812,000
Projects that improve conditions on wildlife refuges and wetland habitat areas. Projects may include the acquisition and delivery of water from willing sellers and water conveyance rights to achieve compliance with subsection (d) of Section 3406 of the federal Central Valley Project Improvement Act (Title 34 of Public Law 102-575) and the acquisition of water and conveyance rights for the Lower Klamath National Wildlife Refuge.
PRC §91032(f)
Department: Secretary for Natural Resources
Purpose Type: Program Delivery
Chapter 2 PRC §91032(f)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
0540-001-6093 (1)
0320
Budget Act
$163,000
Wildlife Refuges and Wetland Habitat Areas
06/30/2026
06/30/2028
B1000PD
Proposed
2026-27
0540-001-6093 (1)
0320
Budget Act
$163,000
Wildlife Refuges and Wetland Improvement Program
06/30/2027
06/30/2029
B1000PD
Program Delivery Enacted Total: $163,000
Program Delivery Proposed Total: $163,000
Summary for PRC §91032(f) - Wildlife Refuges and Wetland Habitat Improvement
Allocation:
$25,000,000
Statewide Bond Costs:
$188,000
Enacted/Proposed Total:
$326,000
Outyear Commitments:
$652,000
Balance:
$23,834,000
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91032(g)
Allocation: Lower American River Conservancy Program
Net Allocation: $9,925,000
Projects for the Lower American River Conservancy Program
PRC §91032(g)
Department: Wildlife Conservation Board
Purpose Type: Projects
Chapter 2 PRC §91032(g)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3640-103-6093 (1)
2710
Budget Act
$3,000,000
Lower American River Conservancy Program
06/30/2028
06/30/2030
B1090PJ
Projects Enacted Total: $3,000,000
Summary for PRC §91032(g) - Lower American River Conservancy Program
Allocation:
$10,000,000
Statewide Bond Costs:
$75,000
Enacted/Proposed Total:
$3,000,000
Outyear Commitments:
$0
Balance:
$6,925,000
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91032(h)
Allocation: Coyote Valley Conservation Program
Net Allocation: $24,812,000
Protect and restore watersheds through the Coyote Valley Conservation Program in the County of Santa Clara.
PRC §91032(h)
Department: State Coastal Conservancy
Purpose Type: Program Delivery
Chapter 2 PRC §91032(h)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3760-001-6093 (1)
2805032
Budget Act
$50,000
Coyote Valley Conservation Program
06/30/2026
06/30/2028
B1106PD
Proposed
2026-27
3760-001-6093 (1)
2790
Budget Act
$194,000
Coyote Valley Conservation Program
06/30/2027
06/30/2029
B1106PD
Program Delivery Enacted Total: $50,000
Program Delivery Proposed Total: $194,000
PRC §91032(h)
Department: State Coastal Conservancy
Purpose Type: Projects
Chapter 2 PRC §91032(h)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3760-101-6093 (1)
2805032
Budget Act
$3,000,000
Coyote Valley Conservation Program
06/30/2028
06/30/2030
B1106PJ
Proposed
2026-27
3760-101-6093 (1)
2805032
Budget Act
$14,250,000
Coyote Valley Conservation Program
06/30/2029
06/30/2031
B1106PJ
Projects Enacted Total: $3,000,000
Projects Proposed Total: $14,250,000
Summary for PRC §91032(h) - Coyote Valley Conservation Program
Allocation:
$25,000,000
Statewide Bond Costs:
$188,000
Enacted/Proposed Total:
$17,494,000
Outyear Commitments:
$776,000
Balance:
$6,542,000
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91032(i)
Allocation: West Coyote Hills Program
Net Allocation: $24,812,000
Protect and restore watersheds through the West Coyote Hills Program.
PRC §91032(i)
Department: State Coastal Conservancy
Purpose Type: Program Delivery
Chapter 2 PRC §91032(i)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Proposed
2026-27
3760-001-6093 (1)
2790
Budget Act
$194,000
West Coyote Hills Program
06/30/2027
06/30/2029
B1107PD
Program Delivery Proposed Total: $194,000
PRC §91032(i)
Department: State Coastal Conservancy
Purpose Type: Projects
Chapter 2 PRC §91032(i)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Proposed
2026-27
3760-101-6093 (1)
2805032
Budget Act
$23,062,000
West Coyote Hills Program
06/30/2029
06/30/2031
B1107PJ
Projects Proposed Total: $23,062,000
Summary for PRC §91032(i) - West Coyote Hills Program
Allocation:
$25,000,000
Statewide Bond Costs:
$188,000
Enacted/Proposed Total:
$23,256,000
Outyear Commitments:
$776,000
Balance:
$780,000
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91032(j)
Allocation: Cross-Border Rivers and Coastal Waters (Tijuana & New River)
Net Allocation: $49,625,000
Loans or grants for projects that will address water quality problems arising in the California-Mexico cross-border rivers and coastal waters. Funds may be made available under this subdivision for water quality projects in the Tijuana River Valley Watershed, as described in the Tijuana River Plan created pursuant to Section 71107, and for projects consistent with the New River Water Quality, Public Health, and River Parkway Development Program, as described in Section 71103.6.
PRC §91032(j)
Department: State Water Resources Control Board
Purpose Type: Program Delivery
Chapter 2 PRC §91032(j)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3940-006-6093 (1)
3560
Budget Act
$400,000
Cross-Border Rivers and Coastal Waters (Tijuana & New River)
06/30/2026
06/30/2028
B1220PD
Proposed
2026-27
3940-006-6093 (1)
3560
Budget Act
$675,000
Cross-Border Rivers and Coastal Waters (Tijuana & New River)
06/30/2027
06/30/2029
B1220PD
Program Delivery Enacted Total: $400,000
Program Delivery Proposed Total: $675,000
PRC §91032(j)
Department: State Water Resources Control Board
Purpose Type: Projects
Chapter 2 PRC §91032(j)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3940-106-6093 (1)
3560
Budget Act
$46,151,000
Cross-Border Rivers and Coastal Waters (Tijuana & New River)
06/30/2028
06/30/2031
B1220PJ
Projects Enacted Total: $46,151,000
Summary for PRC §91032(j) - Cross-Border Rivers and Coastal Waters (Tijuana & New River)
Allocation:
$50,000,000
Statewide Bond Costs:
$375,000
Enacted/Proposed Total:
$47,226,000
Outyear Commitments:
$2,025,000
Balance:
$374,000
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91032(k)
Allocation: Clear Lake Watershed - Climate Resiliency and Protection
Net Allocation: $19,850,000
Projects to improve the climate resiliency of, or for the protection of, the Clear Lake Watershed.
PRC §91032(k)
Department: Secretary for Natural Resources
Purpose Type: Program Delivery
Chapter 2 PRC §91032(k)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
0540-001-6093 (1)
0320
Budget Act
$130,000
Clear Lake Watershed
06/30/2026
06/30/2028
B1001PD
Proposed
2026-27
0540-001-6093 (1)
0320
Budget Act
$130,000
Clear Lake Watershed
06/30/2027
06/30/2029
B1001PD
Program Delivery Enacted Total: $130,000
Program Delivery Proposed Total: $130,000
PRC §91032(k)
Department: Secretary for Natural Resources
Purpose Type: Projects
Chapter 2 PRC §91032(k)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
0540-101-6093 (1)
0320
Budget Act
$1,800,000
Clear Lake Watershed
06/30/2028
06/30/2030
B1001PJ
Proposed
2026-27
0540-101-6093 (1)
0320
Budget Act
$15,250,000
Clear Lake Watershed
06/30/2029
06/30/2031
B1001PJ
Proposed
2026-27
0540-101-6093 (1)
0320
Budget Act
$1,500,000
Hydrilla Survey Program - Grant to CDFA
06/30/2029
06/30/2031
B1001PJ
Projects Enacted Total: $1,800,000
Projects Proposed Total: $16,750,000
Summary for PRC §91032(k) - Clear Lake Watershed - Climate Resiliency and Protection
Allocation:
$20,000,000
Statewide Bond Costs:
$150,000
Enacted/Proposed Total:
$18,810,000
Outyear Commitments:
$520,000
Balance:
$520,000
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91033(a)
Allocation: Salton Sea Management Program 10-year plan
Net Allocation: $158,800,000
To implement the Salton Sea Management Program 10-year Plan, and any subsequent revisions to that plan, or any subsequent plans, to provide air quality, public health, and habitat benefits.
PRC §91033(a)
Department: Secretary for Natural Resources
Purpose Type: Program Delivery
Chapter 2 PRC §91033(a)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
0540-001-6093 (1)
0320
Budget Act
$566,000
Salton Sea Management Program
06/30/2026
06/30/2028
B1002PD
Proposed
2026-27
0540-001-6093 (1)
0320
Budget Act
$185,000
Salton Sea Management Program
06/30/2027
06/30/2029
B1002PD
Program Delivery Enacted Total: $566,000
Program Delivery Proposed Total: $185,000
PRC §91033(a)
Department: California Department of Fish and Wildlife
Purpose Type: Program Delivery
Chapter 2 PRC §91033(a)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Proposed
2026-27
3600-007-6093 (1)
2590
Budget Act
$1,674,000
Salton Sea Management Program
06/30/2027
06/30/2029
B1083PD
Program Delivery Proposed Total: $1,674,000
PRC §91033(a)
Department: Department of Water Resources
Purpose Type: Program Delivery
Chapter 2 PRC §91033(a)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Proposed
2026-27
3860-001-6093 (1)
3230
Budget Act
$1,284,000
Salton Sea Management Program
06/30/2027
06/30/2029
B1193PD
Program Delivery Proposed Total: $1,284,000
PRC §91033(a)
Department: Department of Water Resources
Purpose Type: Projects
Chapter 2 PRC §91033(a)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3860-301-6093 (1)(c)
0000958
Budget Act
$141,848,000
Salton Sea Management Plan - Construction
06/30/2028
06/30/2030
B1193PJ
Enacted
2025-26
3860-301-6093 (1)(d)
0000958
Budget Act
$250,000
Salton Sea Management Plan - Equipment
06/30/2028
06/30/2030
B1193PJ
Enacted
2025-26
3860-301-6093 (1)(b)
0000958
Budget Act
$1,000
Salton Sea Management Plan - Preliminary Plans
06/30/2028
06/30/2030
B1193PJ
Enacted
2025-26
3860-301-6093 (1)(a)
0000958
Budget Act
$5,500,000
Salton Sea Management Plan - Study
06/30/2028
06/30/2030
B1193PJ
Enacted
2025-26
3860-301-6093 (1)(e)
0000958
Budget Act
$1,000
Salton Sea Management Plan - Various
06/30/2028
06/30/2030
B1193PJ
Projects Enacted Total: $147,600,000
Summary for PRC §91033(a) - Salton Sea Management Program 10-year plan
Allocation:
$160,000,000
Statewide Bond Costs:
$1,200,000
Enacted/Proposed Total:
$151,309,000
Outyear Commitments:
$7,491,000
Balance:
$0
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91033(b)
Allocation: Salton Sea Conservancy
Net Allocation: $9,925,000
Creation of the Salton Sea Conservancy or to the Salton Sea Authority
PRC §91033(b)
Department: Salton Sea Conservancy
Purpose Type: Projects
Chapter 2 PRC §91033(b)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3815-001-6093 (1)
2970
Budget Act
$1,638,000
Salton Sea Conservancy
06/30/2026
06/30/2028
B1140PJ
Proposed
2026-27
3815-001-6093 (1)
2970
Budget Act
$3,224,000
Salton Sea Conservancy
06/30/2027
06/30/2029
B1140PJ
Projects Enacted Total: $1,638,000
Projects Proposed Total: $3,224,000
Summary for PRC §91033(b) - Salton Sea Conservancy
Allocation:
$10,000,000
Statewide Bond Costs:
$75,000
Enacted/Proposed Total:
$4,862,000
Outyear Commitments:
$5,063,000
Balance:
$0
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91040(a)
Allocation: Stream Flow Enhancement Program
Net Allocation: $99,250,000
Projects pursuant to the guidelines of the Stream Flow Enhancement Program, including the acquisition of water or water rights, acquisition of land that includes water rights or contractual rights to water, and short- or long-term water transfers and leases.
PRC §91040(a)
Department: Wildlife Conservation Board
Purpose Type: Program Delivery
Chapter 2 PRC §91040(a)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3640-002-6093 (1)
2710
Budget Act
$500,000
Stream Flow Enhancement Program
06/30/2026
06/30/2028
B1091PD
Proposed
2026-27
3640-002-6093 (1)
2710
Budget Act
$500,000
Stream Flow Enhancement Program
06/30/2027
06/30/2029
B1091PD
Program Delivery Enacted Total: $500,000
Program Delivery Proposed Total: $500,000
PRC §91040(a)
Department: Wildlife Conservation Board
Purpose Type: Projects
Chapter 2 PRC §91040(a)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3640-104-6093 (1)
2710
Budget Act
$20,000,000
Stream Flow Enhancement Program
06/30/2028
06/30/2030
B1091PJ
Proposed
2026-27
3640-104-6093 (1)
2710
Budget Act
$10,000,000
Stream Flow Enhancement Program
06/30/2029
06/30/2031
B1091PJ
Projects Enacted Total: $20,000,000
Projects Proposed Total: $10,000,000
Summary for PRC §91040(a) - Stream Flow Enhancement Program
Allocation:
$100,000,000
Statewide Bond Costs:
$750,000
Enacted/Proposed Total:
$31,000,000
Outyear Commitments:
$2,000,000
Balance:
$66,250,000
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91040(b)
Allocation: Habitat Enhancement and Restoration Program
Net Allocation: $49,625,000
Habitat Enhancement and Restoration Program for fishery enhancement projects and programs that support reintroducing salmon into cold water habitat in the Sacramento and San Joaquin Rivers watersheds.
PRC §91040(b)
Department: Wildlife Conservation Board
Purpose Type: Program Delivery
Chapter 2 PRC §91040(b)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3640-002-6093 (1)
2710
Budget Act
$500,000
Habitat Enhancement and Restoration Program
06/30/2026
06/30/2028
B1092PD
Proposed
2026-27
3640-002-6093 (1)
2710
Budget Act
$500,000
Habitat Enhancement and Restoration Program (Fishery Enhancement)
06/30/2027
06/30/2029
B1092PD
Program Delivery Enacted Total: $500,000
Program Delivery Proposed Total: $500,000
PRC §91040(b)
Department: Wildlife Conservation Board
Purpose Type: Projects
Chapter 2 PRC §91040(b)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3640-105-6093 (1)
2710
Budget Act
$10,000,000
Habitat Enhancement and Restoration Program
06/30/2028
06/30/2030
B1092PJ
Projects Enacted Total: $10,000,000
Summary for PRC §91040(b) - Habitat Enhancement and Restoration Program
Allocation:
$50,000,000
Statewide Bond Costs:
$375,000
Enacted/Proposed Total:
$11,000,000
Outyear Commitments:
$1,500,000
Balance:
$37,125,000
Chapter 2
Safe Drinking Water, Drought, Flood, and Water Resilience
PRC §91045
Allocation: Nature and Climate Education
Net Allocation: $19,850,000
Grants to nature and climate education and research facilities, nonprofit organizations and public institutions, natural history museums, California zoos and aquariums accredited by the Association of Zoos and Aquariums, and geologic heritage sites that serve diverse populations. Grants may be used for buildings, equipment, structures, and exhibit galleries that present collections to promote climate, biodiversity, and cultural literacy. Projects may support species recovery and biodiversity protection in order to advance the state’s 30x30 conservation goal.
PRC §91045
Department: Secretary for Natural Resources
Purpose Type: Program Delivery
Chapter 2 PRC §91045
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
0540-001-6093 (1)
0320
Budget Act
$130,000
Nature, Climate Education, and Research Facility Grants
06/30/2026
06/30/2028
B1003PD
Proposed
2026-27
0540-001-6093 (1)
0320
Budget Act
$130,000
Nature, Climate Education, and Research Facility Grants
06/30/2027
06/30/2029
B1003PD
Program Delivery Enacted Total: $130,000
Program Delivery Proposed Total: $130,000
PRC §91045
Department: Secretary for Natural Resources
Purpose Type: Projects
Chapter 2 PRC §91045
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
0540-101-6093 (1)
0320
Budget Act
$15,000,000
Geologic Heritage Sites
06/30/2028
06/30/2030
B1003PJ
Proposed
2026-27
0540-101-6093 (1)
0320
Budget Act
$3,550,000
Nature, Climate Education, and Research Facility Grants
06/30/2029
06/30/2031
B1003PJ
Projects Enacted Total: $15,000,000
Projects Proposed Total: $3,550,000
Summary for PRC §91045 - Nature and Climate Education
Allocation:
$20,000,000
Statewide Bond Costs:
$150,000
Enacted/Proposed Total:
$18,810,000
Outyear Commitments:
$520,000
Balance:
$520,000
Summary for Chapter 2: Safe Drinking Water, Drought, Flood, and Water Resilience
Allocation:
$3,800,000,000
Statewide Bond Costs:
$28,498,000
Enacted/Proposed Total:
$1,991,471,000
Outyear Commitments:
$100,754,000
Balance:
$1,679,277,000
Enacted:
$1,199,489,000
Proposed:
$791,982,000
Chapter 3
Wildfire and Forest Resilience
PRC §91510
Allocation: Wildfire Mitigation Grant Program
Net Allocation: $133,987,000
For a wildfire mitigation grant program. The Office of Emergency Services shall coordinate with the Department of Forestry and Fire Protection in administering these moneys. The grant program shall assist local and state agencies to leverage additional funds, including matching grants from federal agencies. Funds may be used to provide loans, rebates, direct assistance, and matching funds for projects that prevent wildfires, increase resilience, maintain existing wildfire risk reduction projects, reduce the risk of wildfires to communities, or increase home or community hardening. Projects shall benefit disadvantaged communities, severely disadvantaged communities, or vulnerable populations.
PRC §91510
Department: Office of Emergency Services
Purpose Type: Program Delivery
Chapter 3 PRC §91510
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
0690-008-6093 (1)
0385
Budget Act
$1,050,000
Wildfire Mitigation Grant Program
06/30/2026
06/30/2028
B1030PD
Proposed
2026-27
0690-008-6093 (1)
0380
Budget Act
$1,050,000
Wildfire Mitigation Grant Program
06/30/2027
06/30/2029
B1030PD
Program Delivery Enacted Total: $1,050,000
Program Delivery Proposed Total: $1,050,000
PRC §91510
Department: Office of Emergency Services
Purpose Type: Projects
Chapter 3 PRC §91510
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
0690-108-6093 (1)
0385
Budget Act
$11,950,000
Wildfire Mitigation Grant Program
06/30/2028
06/30/2030
B1030PJ
Proposed
2026-27
0690-108-6093 (1)
0380
Budget Act
$25,000,000
Wildfire Mitigation Grant Program
06/30/2029
06/30/2031
B1030PJ
Projects Enacted Total: $11,950,000
Projects Proposed Total: $25,000,000
Summary for PRC §91510 - Wildfire Mitigation Grant Program
Allocation:
$135,000,000
Statewide Bond Costs:
$1,013,000
Enacted/Proposed Total:
$39,050,000
Outyear Commitments:
$4,200,000
Balance:
$90,737,000
Chapter 3
Wildfire and Forest Resilience
PRC §91520(a)
Allocation: Regional Forest and Fire Capacity Program
Net Allocation: $183,612,000
To increase regional capacity to prioritize, develop, and implement projects that improve forest health and fire resilience, implement community fire preparedness demonstration projects, facilitate greenhouse gas emissions reductions, and increase carbon sequestration in forests and other landscapes across regions and throughout the state. The funding shall be allocated based, to the extent feasible, on the Wildfire and Forest Resilience Action Plan.
PRC §91520(a)
Department: Department of Conservation
Purpose Type: Program Delivery
Chapter 3 PRC §91520(a)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3480-002-6093 (1)
2430
Budget Act
$105,000
Regional Forest and Fire Capacity Program (RFFC)
06/30/2026
06/30/2028
B1056PD
Proposed
2026-27
3480-002-6093 (1)
2430
Budget Act
$500,000
Regional Forest and Fire Capacity Program (RFFC)
06/30/2027
06/30/2029
B1056PD
Program Delivery Enacted Total: $105,000
Program Delivery Proposed Total: $500,000
PRC §91520(a)
Department: Department of Conservation
Purpose Type: Projects
Chapter 3 PRC §91520(a)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3480-102-6093 (1)
2430
Budget Act
$10,000,000
Regional Forest and Fire Capacity Program (RFFC)
06/30/2028
06/30/2030
B1056PJ
Proposed
2026-27
3480-102-6093 (1)
2430
Budget Act
$50,000,000
Regional Forest and Fire Capacity Program (RFFC)
06/30/2029
06/30/2031
B1056PJ
Projects Enacted Total: $10,000,000
Projects Proposed Total: $50,000,000
Summary for PRC §91520(a) - Regional Forest and Fire Capacity Program
Allocation:
$185,000,000
Statewide Bond Costs:
$1,388,000
Enacted/Proposed Total:
$60,605,000
Outyear Commitments:
$4,025,000
Balance:
$118,982,000
Chapter 3
Wildfire and Forest Resilience
PRC §91520(b)
Allocation: Regional Projects
Net Allocation: $168,725,000
Landscape-scale projects developed by forest collaboratives as defined in Section 4810, projects developed by regional entities as defined in Section 4208, and projects that implement strategies developed by state conservancies through block grants and direct appropriations by the Legislature.
PRC §91520(b)
Department: California Department of Forestry and Fire Protection
Purpose Type: Program Delivery
Chapter 3 PRC §91520(b)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3540-001-6093 (1)
2470
Budget Act
$1,107,000
Regional Fire Prevention and Forest Health
06/30/2026
06/30/2028
B1065PD
Proposed
2026-27
3540-001-6093 (1)
2470
Budget Act
$904,000
Regional Projects to Improve Local Fire Prevention Capacity, Improve Forest Health and Resilience, Reduce Risk of Wildfire Spread
06/30/2027
06/30/2029
B1065PD
Program Delivery Enacted Total: $1,107,000
Program Delivery Proposed Total: $904,000
PRC §91520(b)
Department: Santa Monica Mountains Conservancy
Purpose Type: Program Delivery
Chapter 3 PRC §91520(b)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3810-004-6093 (1)
2940
Budget Act
$200,000
Regional Fire Prevention and Forest Health
06/30/2026
06/30/2028
B1138PD
Program Delivery Enacted Total: $200,000
PRC §91520(b)
Department: Sierra Nevada Conservancy
Purpose Type: Program Delivery
Chapter 3 PRC §91520(b)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3855-001-6093 (1)
3220
Budget Act
$50,000
Regional Fire Prevention and Forest Health
06/30/2026
06/30/2028
B1170PD
Proposed
2026-27
3855-001-6093 (1)
3220
Budget Act
$250,000
Administration of Regional Projects
06/30/2027
06/30/2029
B1170PD
Program Delivery Enacted Total: $50,000
Program Delivery Proposed Total: $250,000
PRC §91520(b)
Department: California Department of Forestry and Fire Protection
Purpose Type: Projects
Chapter 3 PRC §91520(b)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3540-101-6093 (1)
2470
Budget Act
$30,000,000
Local Fire Prevention, Forest Health and Resilience, and Wildfire Risk Reduction
06/30/2028
06/30/2031
B1065PJ
Proposed
2026-27
3540-101-6093 (1)
2470
Budget Act
$37,943,000
Local Fire Prevention, Forest Health and Resilience, and Wildfire Risk Reduction
06/30/2029
06/30/2032
B1065PJ
Projects Enacted Total: $30,000,000
Projects Proposed Total: $37,943,000
PRC §91520(b)
Department: Santa Monica Mountains Conservancy
Purpose Type: Projects
Chapter 3 PRC §91520(b)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3810-104-6093 (1)
2945
Budget Act
$15,000,000
Regional Fire Prevention and Forest Health
06/30/2028
06/30/2031
B1138PJ
Projects Enacted Total: $15,000,000
PRC §91520(b)
Department: Sierra Nevada Conservancy
Purpose Type: Projects
Chapter 3 PRC §91520(b)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3855-101-6093 (1)
3220
Budget Act
$45,000,000
Regional Fire Prevention and Forest Health
06/30/2028
06/30/2031
B1170PJ
Projects Enacted Total: $45,000,000
Summary for PRC §91520(b) - Regional Projects
Allocation:
$170,000,000
Statewide Bond Costs:
$1,275,000
Enacted/Proposed Total:
$130,454,000
Outyear Commitments:
$5,216,000
Balance:
$33,055,000
Chapter 3
Wildfire and Forest Resilience
PRC §91520(c)
Allocation: Forest Health Program
Net Allocation: $173,687,000
Program for long-term forest health projects, including improved forest management, prescribed fire, prescribed grazing, cultural fire, forest watershed restoration, reforestation, upper watershed, riparian, and mountain meadow restoration, and activities that promote long-term carbon storage and sequestration. Funds may be used for tribal wildfire resilience grants.
PRC §91520(c)
Department: California Department of Forestry and Fire Protection
Purpose Type: Program Delivery
Chapter 3 PRC §91520(c)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3540-004-6093 (1)
2470
Budget Act
$1,225,000
Forest Health Program
06/30/2026
06/30/2028
B1066PD
Proposed
2026-27
3540-004-6093 (1)
2470
Budget Act
$1,400,000
Forest Health Program
06/30/2027
06/30/2029
B1066PD
Program Delivery Enacted Total: $1,225,000
Program Delivery Proposed Total: $1,400,000
PRC §91520(c)
Department: California Department of Forestry and Fire Protection
Purpose Type: Projects
Chapter 3 PRC §91520(c)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2024-25
3540-104-6093 (1)
2470
Budget Act
$10,000,000
Forest Health Program
06/30/2028
06/30/2030
B1066PJ
Enacted
2025-26
3540-104-6093 (1)
2470
Budget Act
$80,938,000
Forest Health Program
06/30/2028
06/30/2031
B1066PJ
Proposed
2026-27
3540-104-6093 (1)
2470
Budget Act
$35,499,000
Forest Health Program
06/30/2029
06/30/2032
B1066PJ
Projects Enacted Total: $90,938,000
Projects Proposed Total: $35,499,000
Summary for PRC §91520(c) - Forest Health Program
Allocation:
$175,000,000
Statewide Bond Costs:
$1,313,000
Enacted/Proposed Total:
$129,062,000
Outyear Commitments:
$5,600,000
Balance:
$39,025,000
Chapter 3
Wildfire and Forest Resilience
PRC §91520(d)
Allocation: Local Fire Prevention Grants
Net Allocation: $183,612,000
Local fire prevention grants consistent with Article 2.5 (commencing with Section 4124) of Chapter 1 of Part 2 of Division 4 and for grants to conduct workforce development for fire prevention and wildfire resiliency work. Workforce development grants may include, but are not limited to, the construction of designated housing for wildfire prevention workers.
PRC §91520(d)
Department: California Department of Forestry and Fire Protection
Purpose Type: Program Delivery
Chapter 3 PRC §91520(d)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3540-003-6093 (1)
2465
Budget Act
$100,000
Local Fire Prevention and Workforce Development
06/30/2026
06/30/2028
B1067PD
Enacted
2025-26
3540-003-6093 (2)
2470
Budget Act
$1,000,000
Local Fire Prevention and Workforce Development
06/30/2026
06/30/2028
B1067PD
Proposed
2026-27
3540-003-6093 (1)
2465
Budget Act
$1,319,000
Local Fire Prevention and Workforce Development
06/30/2027
06/30/2029
B1067PD
Proposed
2026-27
3540-003-6093 (2)
2470
Budget Act
$1,000,000
Local Fire Prevention and Workforce Development
06/30/2027
06/30/2029
B1067PD
Program Delivery Enacted Total: $1,100,000
Program Delivery Proposed Total: $2,319,000
PRC §91520(d)
Department: California Department of Forestry and Fire Protection
Purpose Type: Projects
Chapter 3 PRC §91520(d)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3540-103-6093 (1)
2465
Budget Act
$70,000,000
Local Fire Prevention Grants
06/30/2028
06/30/2031
B1067PJ
Enacted
2025-26
3540-103-6093 (1)
2465
Budget Act
$2,500,000
Workforce Development - California Conservation Corps
06/30/2028
06/30/2031
B1067PJ
Enacted
2025-26
3540-103-6093 (1)
2465
Budget Act
$4,000,000
Workforce Development - Forestry and Fire Recruitment Program
06/30/2028
06/30/2031
B1067PJ
Enacted
2025-26
3540-103-6093 (1)
2465
Budget Act
$1,500,000
Workforce Development - Future Fire Academy
06/30/2028
06/30/2031
B1067PJ
Enacted
2025-26
3540-103-6093 (1)
2465
Budget Act
$2,000,000
Workforce Development - Local Conservation Corps
06/30/2028
06/30/2031
B1067PJ
Proposed
2026-27
3540-103-6093 (1)
2465
Budget Act
$55,662,000
Local Fire Prevention and Workforce Development
06/30/2029
06/30/2032
B1067PJ
Projects Enacted Total: $80,000,000
Projects Proposed Total: $55,662,000
Summary for PRC §91520(d) - Local Fire Prevention Grants
Allocation:
$185,000,000
Statewide Bond Costs:
$1,388,000
Enacted/Proposed Total:
$139,081,000
Outyear Commitments:
$9,531,000
Balance:
$35,000,000
Chapter 3
Wildfire and Forest Resilience
PRC §91520(e)
Allocation: Fire Training Center
Net Allocation: $24,812,000
For the creation or expansion of a fire training center.
PRC §91520(e)
Department: California Department of Forestry and Fire Protection
Purpose Type: Program Delivery
Chapter 3 PRC §91520(e)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Proposed
2026-27
3540-002-6093 (1)
2465
Budget Act
$80,000
Fire Training Center
06/30/2029
06/30/2032
B1069PD
Program Delivery Proposed Total: $80,000
PRC §91520(e)
Department: California Department of Forestry and Fire Protection
Purpose Type: Projects
Chapter 3 PRC §91520(e)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3540-102-6093 (1)
2465
Budget Act
$2,500,000
Fire Training Center
06/30/2028
06/30/2031
B1069PJ
Proposed
2026-27
3540-002-6093 (1)
2465
Budget Act
$4,920,000
Fire Training Center
06/30/2029
06/30/2032
B1069PJ
Projects Enacted Total: $2,500,000
Projects Proposed Total: $4,920,000
Summary for PRC §91520(e) - Fire Training Center
Allocation:
$25,000,000
Statewide Bond Costs:
$188,000
Enacted/Proposed Total:
$7,500,000
Outyear Commitments:
$240,000
Balance:
$17,072,000
Chapter 3
Wildfire and Forest Resilience
PRC §91520(f)
Allocation: Forest Health and Watershed Improvement Projects
Net Allocation: $198,500,000
For forest health and watershed improvement projects in forests and other habitats, including, but not limited to, redwoods, conifers, oak woodlands, mountain meadows, chaparral, and coastal forests. Projects shall involve the restoration of natural ecosystem functions in very high, high, and moderate fire hazard areas and may include prescribed fire, cultural fire, environmentally sensitive vegetation management, land protection, science-based fuel reduction, watershed protection, carbon sequestration, protection of older fire-resistant trees, or improved forest health.
PRC §91520(f)
Department: California State Parks
Purpose Type: Program Delivery
Chapter 3 PRC §91520(f)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3790-001-6093 (1)
2840
Budget Act
$400,000
Stewardship of State-Owned Lands (Wildfire Resilience)
06/30/2026
06/30/2028
B1120PD
Proposed
2026-27
3790-001-6093 (1)
2840
Budget Act
$400,000
Stewardship of State-Owned Lands (Wildfire Resilience)
06/30/2027
06/30/2029
B1120PD
Program Delivery Enacted Total: $400,000
Program Delivery Proposed Total: $400,000
PRC §91520(f)
Department: California State Parks
Purpose Type: Projects
Chapter 3 PRC §91520(f)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3790-003-6093 (1)
2840
Budget Act
$33,000,000
Stewardship of State-Owned Lands (Wildfire Resilience)
06/30/2030
06/30/2032
B1120PJ
Proposed
2026-27
3790-003-6093 (1)
2840
Budget Act
$33,000,000
Stewardship of State-Owned Lands (Wildfire Resilience)
06/30/2031
06/30/2033
B1120PJ
Projects Enacted Total: $33,000,000
Projects Proposed Total: $33,000,000
Summary for PRC §91520(f) - Forest Health and Watershed Improvement Projects
Allocation:
$200,000,000
Statewide Bond Costs:
$1,500,000
Enacted/Proposed Total:
$66,800,000
Outyear Commitments:
$1,600,000
Balance:
$130,100,000
Chapter 3
Wildfire and Forest Resilience
PRC §91520(g)
Allocation: Fuel Reduction, Structure Hardening, Defensible space, Reforestation, or Targeted Acquisitions to Improve Forest Health and Fire Resilience
Net Allocation: $49,625,000
Grants to conduct fuel reduction, structure hardening, create defensible space, reforestation, or targeted acquisitions to improve forest health and fire resilience.
PRC §91520(g)
Department: California Department of Forestry and Fire Protection
Purpose Type: Projects
Chapter 3 PRC §91520(g)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3540-105-6093 (1)
2470
Budget Act
$20,000,000
Grants for Fuel Reduction and Other Purposes in Southern Californian Counties
06/30/2028
06/30/2031
B1070PJ
Enacted
2025-26
3540-105-6093 (1)
2470
Budget Act
$10,000,000
Grants for Fuel Reduction and Other Purposes, unspecified locations
06/30/2028
06/30/2031
B1070PJ
Proposed
2026-27
3540-105-6093 (1)
2465
Budget Act
$4,975,000
Wildfire Prevention, Forest Legacy, and Wildfire Resilience
06/30/2029
06/30/2032
B1070PJ
Proposed
2026-27
3540-105-6093 (2)
2470
Budget Act
$14,650,000
Wildfire Prevention, Forest Legacy, and Wildfire Resilience
06/30/2029
06/30/2032
B1070PJ
Projects Enacted Total: $30,000,000
Projects Proposed Total: $19,625,000
Summary for PRC §91520(g) - Fuel Reduction, Structure Hardening, Defensible space, Reforestation, or Targeted Acquisitions to Improve Forest Health and Fire Resilience
Allocation:
$50,000,000
Statewide Bond Costs:
$375,000
Enacted/Proposed Total:
$49,625,000
Outyear Commitments:
$0
Balance:
$0
Chapter 3
Wildfire and Forest Resilience
PRC §91520(h)
Allocation: Watershed Improvement, Forest Health, Biomass Utilization, Chaparral and Forest Restoration, and Workforce Development
Net Allocation: $33,249,000
Watershed improvement, forest health, biomass utilization, chaparral and forest restoration, and workforce development that addresses needs related to this subdivision and is designed to create career pathways for individuals from disadvantaged communities, severely disadvantaged communities, or vulnerable populations.
PRC §91520(h)
Department: Sierra Nevada Conservancy
Purpose Type: Program Delivery
Chapter 3 PRC §91520(h)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3855-002-6093 (1)
3220
Budget Act
$50,000
Forest and Watershed
06/30/2026
06/30/2028
B1171PD
Enacted/Not Posted
2025-26
3855-002-6093 (1)
3220
Control Section Adjustment
$1,000
Forest and Watershed: Control Section Adjustments
06/30/2026
06/30/2028
B1171PD
Proposed
2026-27
3855-002-6093 (1)
3220
Budget Act
$41,000
Forest and Watershed
06/30/2027
06/30/2029
B1171PD
Program Delivery Enacted Total: $51,000
Program Delivery Proposed Total: $41,000
PRC §91520(h)
Department: Sierra Nevada Conservancy
Purpose Type: Projects
Chapter 3 PRC §91520(h)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2024-25
3855-102-6093 (1)
3220
Budget Act
$30,904,000
Forest and Watershed
06/30/2028
06/30/2030
B1171PJ
Projects Enacted Total: $30,904,000
Summary for PRC §91520(h) - Watershed Improvement, Forest Health, Biomass Utilization, Chaparral and Forest Restoration, and Workforce Development
Allocation:
$33,500,000
Statewide Bond Costs:
$251,000
Enacted/Proposed Total:
$30,996,000
Outyear Commitments:
$656,000
Balance:
$1,597,000
Chapter 3
Wildfire and Forest Resilience
PRC §91520(i)
Allocation: Watershed Improvement, Forest Health, Biomass Utilization, Chaparral and Forest Restoration, and Workforce Development
Net Allocation: $25,309,000
Watershed improvement, forest health, biomass utilization, chaparral and forest restoration, and workforce development that addresses needs related to this subdivision and is designed to create career pathways for individuals from disadvantaged communities, severely disadvantaged communities, or vulnerable populations.
PRC §91520(i)
Department: California Tahoe Conservancy
Purpose Type: Program Delivery
Chapter 3 PRC §91520(i)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3125-001-6093 (1)
2340
Budget Act
$150,000
Watershed Improvement, Forest Health, Biomass Utilization, Chaparral and Forest Restoration, and Workforce Development
06/30/2026
06/30/2028
B1035PD
Proposed
2026-27
3125-001-6093 (1)
2340
Budget Act
$150,000
Watershed Improvement, Forest Health, Biomass Utilization, Chaparral and Forest Restoration, and Workforce Development
06/30/2027
06/30/2029
B1035PD
Program Delivery Enacted Total: $150,000
Program Delivery Proposed Total: $150,000
PRC §91520(i)
Department: California Tahoe Conservancy
Purpose Type: Projects
Chapter 3 PRC §91520(i)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2024-25
3125-101-6093 (1)
2340
Budget Act
$20,974,000
Watershed Improvement, Forest Health, Biomass Utilization, Chaparral and Forest Restoration, and Workforce Development
06/30/2028
06/30/2030
B1035PJ
Projects Enacted Total: $20,974,000
PRC §91520(i)
Department: California Tahoe Conservancy
Purpose Type: Technical Assistance
Chapter 3 PRC §91520(i)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2024-25
3125-101-6093 (1)
2340
Budget Act
$2,550,000
Watershed Improvement, Forest Health, Biomass Utilization, Chaparral and Forest Restoration, and Workforce Development
06/30/2028
06/30/2030
B1035TA
Technical Assistance Enacted Total: $2,550,000
Summary for PRC §91520(i) - Watershed Improvement, Forest Health, Biomass Utilization, Chaparral and Forest Restoration, and Workforce Development
Allocation:
$25,500,000
Statewide Bond Costs:
$191,000
Enacted/Proposed Total:
$23,824,000
Outyear Commitments:
$1,778,000
Balance:
($293,000)
Chapter 3
Wildfire and Forest Resilience
PRC §91520(j)
Allocation: Watershed Improvement, Wildfire Resilience, Chaparral and Forest Restoration, and Workforce Development
Net Allocation: $33,249,000
Watershed improvement, wildfire resilience, chaparral and forest restoration, and workforce development that addresses needs related to this subdivision and is designed to create career pathways for individuals from disadvantaged communities, severely disadvantaged communities, or vulnerable populations.
PRC §91520(j)
Department: Santa Monica Mountains Conservancy
Purpose Type: Program Delivery
Chapter 3 PRC §91520(j)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3810-002-6093 (1)
2940
Budget Act
$400,000
Watershed Improvement, Forest Health, Biomass Utilization, Chaparral and Forest Restoration, and Workforce Development
06/30/2026
06/30/2028
B1136PD
Proposed
2026-27
3810-002-6093 (1)
2940
Budget Act
$400,000
Watershed Improvement, Forest Health, Biomass Utilization, Chaparral and Forest Restoration, and Workforce Development
06/30/2027
06/30/2029
B1136PD
Program Delivery Enacted Total: $400,000
Program Delivery Proposed Total: $400,000
PRC §91520(j)
Department: Santa Monica Mountains Conservancy
Purpose Type: Projects
Chapter 3 PRC §91520(j)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2024-25
3810-102-6093 (1)
2945
Budget Act
$31,349,000
Watershed Improvement, Forest Health, Biomass Utilization, Chaparral and Forest Restoration, and Workforce Development
06/30/2028
06/30/2030
B1136PJ
Projects Enacted Total: $31,349,000
Summary for PRC §91520(j) - Watershed Improvement, Wildfire Resilience, Chaparral and Forest Restoration, and Workforce Development
Allocation:
$33,500,000
Statewide Bond Costs:
$251,000
Enacted/Proposed Total:
$32,149,000
Outyear Commitments:
$1,100,000
Balance:
$0
Chapter 3
Wildfire and Forest Resilience
PRC §91520(k)
Allocation: Watershed Improvement, Wildfire Resilience, Chaparral and Forest Restoration, and Workforce Development
Net Allocation: $33,249,000
Watershed improvement, wildfire resilience, chaparral and forest restoration, and workforce development that addresses needs related to this subdivision and is designed to create career pathways for individuals from disadvantaged communities, severely disadvantaged communities, or vulnerable populations.
PRC §91520(k)
Department: State Coastal Conservancy
Purpose Type: Program Delivery
Chapter 3 PRC §91520(k)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3760-001-6093 (1)
2790
Budget Act
$261,000
Wildfire Resilience
06/30/2026
06/30/2028
B1108PD
Proposed
2026-27
3760-001-6093 (1)
2790
Budget Act
$261,000
Wildfire Resilience
06/30/2027
06/30/2029
B1108PD
Program Delivery Enacted Total: $261,000
Program Delivery Proposed Total: $261,000
PRC §91520(k)
Department: State Coastal Conservancy
Purpose Type: Projects
Chapter 3 PRC §91520(k)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2024-25
3760-101-6093 (1)
2805032
Budget Act
$30,904,000
Wildfire Resilience
06/30/2028
06/30/2030
B1108PJ
Projects Enacted Total: $30,904,000
Summary for PRC §91520(k) - Watershed Improvement, Wildfire Resilience, Chaparral and Forest Restoration, and Workforce Development
Allocation:
$33,500,000
Statewide Bond Costs:
$251,000
Enacted/Proposed Total:
$31,426,000
Outyear Commitments:
$1,044,000
Balance:
$779,000
Chapter 3
Wildfire and Forest Resilience
PRC §91520(l)
Allocation: Watershed Improvement, Wildfire Resilience, Chaparral and Forest Restoration, and Workforce Development
Net Allocation: $33,249,000
Watershed improvement, wildfire resilience, chaparral and forest restoration, and workforce development that addresses needs related to this subdivision and is designed to create career pathways for individuals from disadvantaged communities, severely disadvantaged communities, or vulnerable populations.
PRC §91520(l)
Department: San Gabriel and Lower Los Angeles Rivers and Mountains Conservancy
Purpose Type: Program Delivery
Chapter 3 PRC §91520(l)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3825-002-6093 (1)
2990
Budget Act
$200,000
Watershed Improvement, Forest Health, Biomass Utilization, Chaparral and Forest Restoration, and Workforce Development
06/30/2026
06/30/2028
B1146PD
Proposed
2026-27
3825-002-6093 (1)
2990
Budget Act
$400,000
Watershed Improvement, Forest Health, Biomass Utilization, Chaparral and Forest Restoration, and Workforce Development
06/30/2027
06/30/2029
B1146PD
Program Delivery Enacted Total: $200,000
Program Delivery Proposed Total: $400,000
PRC §91520(l)
Department: San Gabriel and Lower Los Angeles Rivers and Mountains Conservancy
Purpose Type: Projects
Chapter 3 PRC §91520(l)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2024-25
3825-102-6093 (1)
2990
Budget Act
$30,904,000
Watershed Improvement, Forest Health, Biomass Utilization, Chaparral and Forest Restoration, and Workforce Development
06/30/2028
06/30/2030
B1146PJ
Projects Enacted Total: $30,904,000
Summary for PRC §91520(l) - Watershed Improvement, Wildfire Resilience, Chaparral and Forest Restoration, and Workforce Development
Allocation:
$33,500,000
Statewide Bond Costs:
$251,000
Enacted/Proposed Total:
$31,504,000
Outyear Commitments:
$1,545,000
Balance:
$200,000
Chapter 3
Wildfire and Forest Resilience
PRC §91520(m)
Allocation: Watershed Improvement, Wildfire Resilience, Chaparral and Forest Restoration, and Workforce Development
Net Allocation: $25,309,000
Watershed improvement, wildfire resilience, chaparral and forest restoration, and workforce development that addresses needs related to this subdivision and is designed to create career pathways for individuals from disadvantaged communities, severely disadvantaged communities, or vulnerable populations.
PRC §91520(m)
Department: San Diego River Conservancy
Purpose Type: Program Delivery
Chapter 3 PRC §91520(m)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3845-001-6093 (1)
3140
Budget Act
$40,000
Wildfire and Forest Resilience
06/30/2026
06/30/2028
B1160PD
Proposed
2026-27
3845-001-6093 (1)
3140
Budget Act
$200,000
Wildfire and Forest Resilience
06/30/2027
06/30/2029
B1160PD
Program Delivery Enacted Total: $40,000
Program Delivery Proposed Total: $200,000
PRC §91520(m)
Department: San Diego River Conservancy
Purpose Type: Projects
Chapter 3 PRC §91520(m)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2024-25
3845-101-6093 (1)
3140
Budget Act
$23,524,000
Wildfire and Forest Resilience
06/30/2028
06/30/2030
B1160PJ
Projects Enacted Total: $23,524,000
Summary for PRC §91520(m) - Watershed Improvement, Wildfire Resilience, Chaparral and Forest Restoration, and Workforce Development
Allocation:
$25,500,000
Statewide Bond Costs:
$191,000
Enacted/Proposed Total:
$23,764,000
Outyear Commitments:
$800,000
Balance:
$745,000
Chapter 3
Wildfire and Forest Resilience
PRC §91520(n)
Allocation: Improve Firefighter Health and Safety, Advance Fire Attack Effectiveness, and Promote Community Resilience and Awareness
Net Allocation: $14,887,000
Improve firefighter health and safety, advance fire attack effectiveness, and promote community resilience and awareness.
PRC §91520(n)
Department: California Department of Forestry and Fire Protection
Purpose Type: Program Delivery
Chapter 3 PRC §91520(n)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3540-007-6093 (1)
2470
Budget Act
$200,000
Wildfire Conservancy
06/30/2026
06/30/2028
B1073PD
Proposed
2026-27
3540-007-6093 (1)
2470
Budget Act
$200,000
Wildfire Conservancy
06/30/2027
06/30/2029
B1073PD
Program Delivery Enacted Total: $200,000
Program Delivery Proposed Total: $200,000
PRC §91520(n)
Department: California Department of Forestry and Fire Protection
Purpose Type: Projects
Chapter 3 PRC §91520(n)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3540-107-6093 (1)
2470
Budget Act
$13,837,000
Wildfire Conservancy
06/30/2026
06/30/2028
B1073PJ
Projects Enacted Total: $13,837,000
Summary for PRC §91520(n) - Improve Firefighter Health and Safety, Advance Fire Attack Effectiveness, and Promote Community Resilience and Awareness
Allocation:
$15,000,000
Statewide Bond Costs:
$113,000
Enacted/Proposed Total:
$14,237,000
Outyear Commitments:
$650,000
Balance:
$0
Chapter 3
Wildfire and Forest Resilience
PRC §91520(o)
Allocation: Vegetation Mitigation, Fuels Reduction, Public Education and Outreach, Personal Protective Equipment, Specialized Firefighting Equipment, and Firefighter Health and Safety
Net Allocation: $14,887,000
Support vegetation mitigation and fuels reduction projects, public education and outreach, personal protective equipment, specialized firefighting equipment, and firefighter health and safety.
PRC §91520(o)
Department: California Department of Forestry and Fire Protection
Purpose Type: Program Delivery
Chapter 3 PRC §91520(o)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3540-008-6093 (1)
2470
Budget Act
$200,000
California Fire Foundation
06/30/2026
06/30/2028
B1074PD
Proposed
2026-27
3540-008-6093 (1)
2470
Budget Act
$200,000
California Fire Foundation
06/30/2027
06/30/2029
B1074PD
Program Delivery Enacted Total: $200,000
Program Delivery Proposed Total: $200,000
PRC §91520(o)
Department: California Department of Forestry and Fire Protection
Purpose Type: Projects
Chapter 3 PRC §91520(o)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3540-108-6093 (1)
2470
Budget Act
$13,837,000
California Fire Foundation
06/30/2026
06/30/2028
B1074PJ
Projects Enacted Total: $13,837,000
Summary for PRC §91520(o) - Vegetation Mitigation, Fuels Reduction, Public Education and Outreach, Personal Protective Equipment, Specialized Firefighting Equipment, and Firefighter Health and Safety
Allocation:
$15,000,000
Statewide Bond Costs:
$113,000
Enacted/Proposed Total:
$14,237,000
Outyear Commitments:
$650,000
Balance:
$0
Chapter 3
Wildfire and Forest Resilience
PRC §91530
Allocation: Capital Infrastructure for Wildfire Mitigation Waste for Noncombustible Uses
Net Allocation: $49,625,000
Projects in California that provide long-term capital infrastructure to use forest and other vegetative waste removed for wildfire mitigation for noncombustible uses that maximize reductions in greenhouse gas emissions, provide local air quality benefits, and increase local community resilience against climate change impacts.
PRC §91530
Department: Department of Conservation
Purpose Type: Program Delivery
Chapter 3 PRC §91530
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3480-003-6093 (1)
2430
Budget Act
$630,000
Capital Infrastructure for Wildfire Mitigation Waste for Noncombustible Uses
06/30/2026
06/30/2028
B1057PD
Proposed
2026-27
3480-003-6093 (1)
2430
Budget Act
$407,000
Forest Biomass to Carbon Negative Biofuels
06/30/2027
06/30/2029
B1057PD
Program Delivery Enacted Total: $630,000
Program Delivery Proposed Total: $407,000
PRC §91530
Department: Department of Conservation
Purpose Type: Projects
Chapter 3 PRC §91530
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3480-103-6093 (1)
2430
Budget Act
$10,000,000
Capital Infrastructure for Wildfire Mitigation Waste for Noncombustible Uses
06/30/2028
06/30/2030
B1057PJ
Proposed
2026-27
3480-103-6093 (1)
2430
Budget Act
$15,000,000
Use Forest/Vegetative Waste for Noncombustible Uses
06/30/2029
06/30/2031
B1057PJ
Projects Enacted Total: $10,000,000
Projects Proposed Total: $15,000,000
Summary for PRC §91530 - Capital Infrastructure for Wildfire Mitigation Waste for Noncombustible Uses
Allocation:
$50,000,000
Statewide Bond Costs:
$375,000
Enacted/Proposed Total:
$26,037,000
Outyear Commitments:
$1,250,000
Balance:
$22,338,000
Chapter 3
Wildfire and Forest Resilience
PRC §91535
Allocation: Fire Ignition Detection Technology
Net Allocation: $24,812,000
Technologies that improve detection and assessment of new fire ignitions.
PRC §91535
Department: California Department of Forestry and Fire Protection
Purpose Type: Program Delivery
Chapter 3 PRC §91535
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3540-009-6093 (1)
2465
Budget Act
$200,000
Technologies for Detection and Assessment of New Fire Ignitions
06/30/2028
06/30/2031
B1071PD
Program Delivery Enacted Total: $200,000
PRC §91535
Department: California Department of Forestry and Fire Protection
Purpose Type: Projects
Chapter 3 PRC §91535
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3540-009-6093 (1)
2465
Budget Act
$5,000,000
AlertCalifornia for Wildfire Detection Camera-Related Technology
06/30/2028
06/30/2031
B1071PJ
Enacted
2025-26
3540-009-6093 (1)
2465
Budget Act
$16,812,000
Low Earth Orbit Satellite Technology
06/30/2028
06/30/2031
B1071PJ
Enacted
2025-26
3540-009-6093 (1)
2465
Budget Act
$1,250,000
Study Related to the Use of Autonomous Aircraft
06/30/2028
06/30/2031
B1071PJ
Proposed
2026-27
3540-009-6093 (1)
2465
Budget Act
$1,550,000
Technologies that Improve Detection and Assessment of New Fire Ignitions
06/30/2028
06/30/2031
B1071PJ
Projects Enacted Total: $23,062,000
Projects Proposed Total: $1,550,000
Summary for PRC §91535 - Fire Ignition Detection Technology
Allocation:
$25,000,000
Statewide Bond Costs:
$188,000
Enacted/Proposed Total:
$24,812,000
Outyear Commitments:
$0
Balance:
$0
Chapter 3
Wildfire and Forest Resilience
PRC §91540
Allocation: Reduce Wildfire Risk Related to Electricity Transmission
Net Allocation: $34,737,000
Uses to reduce wildfire risk related to electricity transmission. The proportion of any asset funded pursuant to this section shall be funded without return on equity for the lifetime of the proportion of that asset that would have otherwise been borne by ratepayers.
The proportion of any projects funded pursuant to this section shall be excluded from the ratebase, and no costs may be collected from ratepayers.
PRC §91540
Department: California Department of Forestry and Fire Protection
Purpose Type: Program Delivery
Chapter 3 PRC §91540
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Proposed
2026-27
3540-010-6093 (1)
2465
Budget Act
$243,000
Reduce Wildfire Risk Related to Electricity Transmission
06/30/2027
06/30/2029
B1075PD
Program Delivery Proposed Total: $243,000
PRC §91540
Department: California Department of Forestry and Fire Protection
Purpose Type: Projects
Chapter 3 PRC §91540
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Proposed
2026-27
3540-110-6093 (1)
2465
Budget Act
$15,000,000
Reduce Wildfire Risk Related to Electricity Transmission
06/30/2029
06/30/2032
B1075PJ
Projects Proposed Total: $15,000,000
Summary for PRC §91540 - Reduce Wildfire Risk Related to Electricity Transmission
Allocation:
$35,000,000
Statewide Bond Costs:
$263,000
Enacted/Proposed Total:
$15,243,000
Outyear Commitments:
$968,000
Balance:
$18,526,000
Chapter 3
Wildfire and Forest Resilience
PRC §91545(a)
Allocation: Demonstrated Jobs Projects
Net Allocation: $19,850,000
Demonstrated jobs projects and grants, including either of the following: (1) Projects to mitigate unemployment and assist the state with the implementation of critical natural resources, transportation, energy, and housing infrastructure to promote climate resilience; (2) Projects to prepare for, prevent, respond to, and rehabilitate following natural disasters, declared emergencies, or climate-related impacts to communities.
PRC §91545(a)
Department: California Conservation Corps
Purpose Type: Projects
Chapter 3 PRC §91545(a)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Proposed
2026-27
3340-101-6093 (1)
2360
Budget Act
$1,493,000
Tribal Corps / Nonprofit Youth Grants
06/30/2027
06/30/2029
B1041PJ
Projects Proposed Total: $1,493,000
Summary for PRC §91545(a) - Demonstrated Jobs Projects
Allocation:
$20,000,000
Statewide Bond Costs:
$150,000
Enacted/Proposed Total:
$1,493,000
Outyear Commitments:
$2,334,000
Balance:
$16,023,000
Chapter 3
Wildfire and Forest Resilience
PRC §91545(b)
Allocation: Demonstrated Jobs Projects for Certified Community Conservation Corps
Net Allocation: $29,775,000
Demonstrated Jobs Projects for certified community conservation corps, as defined in Section 14507.5.
PRC §91545(b)
Department: California Conservation Corps
Purpose Type: Program Delivery
Chapter 3 PRC §91545(b)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3340-001-6093 (1)
2360
Budget Act
$200,000
Certified Community Conservation Corps
06/30/2026
06/30/2028
B1042PD
Proposed
2026-27
3340-001-6093 (1)
2360
Budget Act
$200,000
Certified Community Conservation Corps
06/30/2027
06/30/2029
B1042PD
Program Delivery Enacted Total: $200,000
Program Delivery Proposed Total: $200,000
PRC §91545(b)
Department: California Conservation Corps
Purpose Type: Projects
Chapter 3 PRC §91545(b)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3340-101-6093 (1)
2360
Budget Act
$9,949,000
Certified Community Conservation Corps Grants
06/30/2028
06/30/2030
B1042PJ
Proposed
2026-27
3340-101-6093 (1)
2360
Budget Act
$9,949,000
Certified Community Conservation Corps Grants
06/30/2029
06/30/2031
B1042PJ
Projects Enacted Total: $9,949,000
Projects Proposed Total: $9,949,000
Summary for PRC §91545(b) - Demonstrated Jobs Projects for Certified Community Conservation Corps
Allocation:
$30,000,000
Statewide Bond Costs:
$225,000
Enacted/Proposed Total:
$20,298,000
Outyear Commitments:
$765,000
Balance:
$8,712,000
Summary for Chapter 3: Wildfire and Forest Resilience
Allocation:
$1,500,000,000
Statewide Bond Costs:
$11,253,000
Enacted/Proposed Total:
$912,197,000
Outyear Commitments:
$43,952,000
Balance:
$532,598,000
Enacted:
$597,951,000
Proposed:
$314,246,000
Chapter 4
Coastal Resilience
PRC §92010(a)
Allocation: Coastal resilience project and programs
Net Allocation: $327,525,000
Projects identified by the State Coastal Conservancy for coastal resilience projects and programs, including, but not limited to, grants and expenditures to protect, restore, and increase the resilience of beaches, bays, coastal dunes, wetlands, coastal forests, watersheds, trails, and public access facilities.
PRC §92010(a)
Department: State Coastal Conservancy
Purpose Type: Program Delivery
Chapter 4 PRC §92010(a)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3760-001-6093 (1)
2805032
Budget Act
$900,000
Coastal Resilience
06/30/2026
06/30/2028
B1109PD
Proposed
2026-27
3760-001-6093 (1)
2790
Budget Act
$2,222,000
Coastal Resilience
06/30/2027
06/30/2029
B1109PD
Program Delivery Enacted Total: $900,000
Program Delivery Proposed Total: $2,222,000
PRC §92010(a)
Department: State Coastal Conservancy
Purpose Type: Projects
Chapter 4 PRC §92010(a)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3760-101-6093 (1)
2805032
Budget Act
$54,000,000
Coastal Resilience
06/30/2028
06/30/2030
B1109PJ
Enacted
2025-26
3760-101-6093 (1)
2805032
Budget Act
$5,000,000
Coastal Resilience - Native Steelhead Trout Populations
06/30/2028
06/30/2030
B1109PJ
Enacted
2025-26
3760-101-6093 (1)
2805032
Budget Act
$3,000,000
Coastal Resilience - Restoration and Enhancement of Native Oyster Beds
06/30/2028
06/30/2030
B1109PJ
Proposed
2026-27
3760-101-6093 (1)
2805032
Budget Act
$30,835,000
Coastal Resilience
06/30/2029
06/30/2031
B1109PJ
Projects Enacted Total: $62,000,000
Projects Proposed Total: $30,835,000
Summary for PRC §92010(a) - Coastal resilience project and programs
Allocation:
$330,000,000
Statewide Bond Costs:
$2,475,000
Enacted/Proposed Total:
$95,957,000
Outyear Commitments:
$8,888,000
Balance:
$222,680,000
Chapter 4
Coastal Resilience
PRC §92010(b)
Allocation: San Francisco Bay Restoration Authority Act/SF Bay Conservancy Program
Net Allocation: $84,362,000
Projects that are consistent with the San Francisco Bay Restoration Authority Act (Title 7.25 (commencing with Section 66700) of the Government Code) or the San Francisco Bay Area Conservancy Program established pursuant to Chapter 4.5 (commencing with Section 31160) of Division 21, including, but not limited to, projects that address sea level rise, flood management, and wetland restoration.
PRC §92010(b)
Department: State Coastal Conservancy
Purpose Type: Program Delivery
Chapter 4 PRC §92010(b)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3760-001-6093 (1)
2805032
Budget Act
$560,000
Coastal Resilience - San Francisco Bay
06/30/2026
06/30/2028
B1110PD
Proposed
2026-27
3760-001-6093 (1)
2790
Budget Act
$661,000
Coastal Resilience – San Francisco Bay
06/30/2027
06/30/2029
B1110PD
Program Delivery Enacted Total: $560,000
Program Delivery Proposed Total: $661,000
PRC §92010(b)
Department: State Coastal Conservancy
Purpose Type: Projects
Chapter 4 PRC §92010(b)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3760-101-6093 (1)
2805032
Budget Act
$40,000,000
San Francisco Bay Restoration Authority Act or San Francisco Bay Area Conservancy Program
06/30/2028
06/30/2030
B1110PJ
Projects Enacted Total: $40,000,000
Summary for PRC §92010(b) - San Francisco Bay Restoration Authority Act/SF Bay Conservancy Program
Allocation:
$85,000,000
Statewide Bond Costs:
$638,000
Enacted/Proposed Total:
$41,221,000
Outyear Commitments:
$2,644,000
Balance:
$40,497,000
Chapter 4
Coastal Resilience
PRC §92015
Allocation: Coastal and Combined Flood Management Projects and Activities for Developed Shoreline Areas
Net Allocation: $347,375,000
Funds shall be allocated to multiple-benefit projects that improve public safety, including shoreline resilience projects designed to address flooding, sea level rise, and shoreline stability that include engineering with nature or nature-based features. These funds shall be available to local agencies as matching funds for federally funded coastal flood risk management and flood risk management projects.
PRC §92015
Department: State Coastal Conservancy
Purpose Type: Program Delivery
Chapter 4 PRC §92015
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3760-001-6093 (1)
2805032
Budget Act
$460,000
Coastal and Combined Flood Management for Developed Shoreline Areas
06/30/2026
06/30/2028
B1111PD
Proposed
2026-27
3760-001-6093 (1)
2790
Budget Act
$2,224,000
Coastal and Combined Flood Management for Developed Shoreline Areas
06/30/2027
06/30/2029
B1111PD
Program Delivery Enacted Total: $460,000
Program Delivery Proposed Total: $2,224,000
PRC §92015
Department: State Coastal Conservancy
Purpose Type: Projects
Chapter 4 PRC §92015
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3760-101-6093 (1)
2805032
Budget Act
$32,835,000
Coastal and Combined Flood Management for Developed Shoreline Areas
06/30/2028
06/30/2030
B1111PJ
Projects Enacted Total: $32,835,000
Summary for PRC §92015 - Coastal and Combined Flood Management Projects and Activities for Developed Shoreline Areas
Allocation:
$350,000,000
Statewide Bond Costs:
$2,625,000
Enacted/Proposed Total:
$35,519,000
Outyear Commitments:
$8,890,000
Balance:
$302,966,000
Chapter 4
Coastal Resilience
PRC §92020
Allocation: Increase Ocean and Coastal Resilience from Impacts of Climate Change
Net Allocation: $133,987,000
Deposit into the Ocean Protection Trust Fund for grants to increase resilience from the impacts of climate change.
PRC §92020
Department: Secretary for Natural Resources
Purpose Type: Program Delivery
Chapter 4 PRC §92020
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
0540-002-6093 (1)
0320
Budget Act
$250,000
Increase Ocean & Coastal Resilience from Impacts of Climate Change
06/30/2026
06/30/2028
B1020PD
Proposed
2026-27
0540-002-6093 (1)
0320
Budget Act
$200,000
Increase Ocean & Coastal Resilience from Impacts of Climate Change
06/30/2027
06/30/2029
B1020PD
Program Delivery Enacted Total: $250,000
Program Delivery Proposed Total: $200,000
PRC §92020
Department: Secretary for Natural Resources
Purpose Type: Projects
Chapter 4 PRC §92020
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
0540-102-6093 (1)
0320
Budget Act
$3,000,000
Improve Working Waterfront Infrastructure along the North Coast
06/30/2028
06/30/2030
B1020PJ
Enacted
2025-26
0540-102-6093 (1)
0320
Budget Act
$7,500,000
Increase Resilience from Impacts of Climate Change
06/30/2028
06/30/2030
B1020PJ
Enacted
2025-26
0540-102-6093 (1)
0320
Budget Act
$12,000,000
Recover Rocky Reef and Kelp Forest Habitats
06/30/2028
06/30/2030
B1020PJ
Proposed
2026-27
0540-102-6093 (1)
0320
Budget Act
$15,000,000
Increase Resilience from Impacts of Climate Change
06/30/2029
06/30/2031
B1020PJ
Projects Enacted Total: $22,500,000
Projects Proposed Total: $15,000,000
Summary for PRC §92020 - Increase Ocean and Coastal Resilience from Impacts of Climate Change
Allocation:
$135,000,000
Statewide Bond Costs:
$1,013,000
Enacted/Proposed Total:
$37,950,000
Outyear Commitments:
$3,750,000
Balance:
$92,287,000
Chapter 4
Coastal Resilience
PRC §92030
Allocation: Sea Level Rise Mitigation and Adaptation
Net Allocation: $74,437,000
Implement the California Sea Level Rise Mitigation and Adaptation Act of 2021 (Division 20.6.5 (commencing with Section 30970)).
PRC §92030
Department: Secretary for Natural Resources
Purpose Type: Program Delivery
Chapter 4 PRC §92030
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
0540-002-6093 (1)
0320
Budget Act
$250,000
Sea Level Rise Mitigation and Adaptation
06/30/2026
06/30/2028
B1021PD
Proposed
2026-27
0540-002-6093 (1)
0320
Budget Act
$500,000
Sea Level Rise Adaptation Planning Grant Program
06/30/2027
06/30/2029
B1021PD
Program Delivery Enacted Total: $250,000
Program Delivery Proposed Total: $500,000
PRC §92030
Department: Secretary for Natural Resources
Purpose Type: Projects
Chapter 4 PRC §92030
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
0540-102-6093 (1)
0320
Budget Act
$20,000,000
Sea Level Rise Mitigation and Adaptation
06/30/2028
06/30/2030
B1021PJ
Proposed
2026-27
0540-102-6093 (1)
0320
Budget Act
$25,000,000
Sea Level Rise Mitigation and Adaptation Act
06/30/2029
06/30/2031
B1021PJ
Projects Enacted Total: $20,000,000
Projects Proposed Total: $25,000,000
Summary for PRC §92030 - Sea Level Rise Mitigation and Adaptation
Allocation:
$75,000,000
Statewide Bond Costs:
$563,000
Enacted/Proposed Total:
$45,750,000
Outyear Commitments:
$2,350,000
Balance:
$26,337,000
Chapter 4
Coastal Resilience
PRC §92040
Allocation: Sea Level Rise Adaptation Strategy
Net Allocation: $49,625,000
Implement the Sea Level Rise Adaptation Strategy to address the impacts of sea level rise in coastal state parks, support continued access and recreational opportunities, and protect coastal natural and cultural resources.
PRC §92040
Department: California State Parks
Purpose Type: Program Delivery
Chapter 4 PRC §92040
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3790-001-6093 (1)
2840
Budget Act
$250,000
Sea Level Rise Adaptation Strategy
06/30/2026
06/30/2028
B1121PD
Proposed
2026-27
3790-001-6093 (1)
2840
Budget Act
$250,000
Sea Level Rise Adaptation Strategy
06/30/2027
06/30/2029
B1121PD
Program Delivery Enacted Total: $250,000
Program Delivery Proposed Total: $250,000
PRC §92040
Department: California State Parks
Purpose Type: Projects
Chapter 4 PRC §92040
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3790-003-6093 (1)
2840
Budget Act
$23,750,000
Sea Level Rise Adaptation Strategy
06/30/2030
06/30/2032
B1121PJ
Projects Enacted Total: $23,750,000
Summary for PRC §92040 - Sea Level Rise Adaptation Strategy
Allocation:
$50,000,000
Statewide Bond Costs:
$375,000
Enacted/Proposed Total:
$24,250,000
Outyear Commitments:
$1,000,000
Balance:
$24,375,000
Chapter 4
Coastal Resilience
PRC §92050
Allocation: Island Ecosystems, Climate-Ready Fisheries Management, and Kelp Ecosystems
Net Allocation: $74,437,000
Projects for all of the following: a) To protect and restore island ecosystems by mitigating the threat of island invasive species and advancing biosecurity initiatives.
(b) To advance climate-ready fisheries management by expanding opportunities for experimentation and adaptive cooperative management, modernizing electronic fisheries data management systems, and increasing the use of electronic technologies to facilitate more nimble decisionmaking and timely management responses under changing ocean conditions.
(c) To support the restoration and management of kelp ecosystems.
PRC §92050
Department: Secretary for Natural Resources
Purpose Type: Program Delivery
Chapter 4 PRC §92050
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
0540-002-6093 (1)
0320
Budget Act
$170,000
Restoration and Management of Kelp Ecosystems
06/30/2026
06/30/2028
B1022PD
Program Delivery Enacted Total: $170,000
PRC §92050
Department: California Department of Fish and Wildlife
Purpose Type: Program Delivery
Chapter 4 PRC §92050
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3600-001-6093 (1)
2590
Budget Act
$774,000
Island Ecosystems, Climate-Ready Fisheries Management, Kelp Ecosystems
06/30/2030
06/30/2032
B1080PD
Proposed
2026-27
3600-001-6093 (1)
2590
Budget Act
$886,000
Restoration of Kelp and Island Ecosystems
06/30/2027
06/30/2029
B1080PD
Program Delivery Enacted Total: $774,000
Program Delivery Proposed Total: $886,000
PRC §92050
Department: Secretary for Natural Resources
Purpose Type: Projects
Chapter 4 PRC §92050
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
0540-102-6093 (1)
0320
Budget Act
$5,000,000
Protect and Restore Island Ecosystems
06/30/2028
06/30/2030
B1022PJ
Enacted
2025-26
0540-102-6093 (1)
0320
Budget Act
$7,000,000
Restoration and Management of Kelp Ecosystems
06/30/2028
06/30/2030
B1022PJ
Projects Enacted Total: $12,000,000
PRC §92050
Department: California Department of Fish and Wildlife
Purpose Type: Projects
Chapter 4 PRC §92050
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3600-002-6093 (1)
2590
Budget Act
$22,850,000
Island Ecosystems, Climate-Ready Fisheries Management, Kelp Ecosystems
06/30/2028
06/30/2030
B1080PJ
Enacted
2025-26
3600-102-6093 (1)
2590
Budget Act
$1,000
Island Ecosystems, Climate-Ready Fisheries Management, Kelp Ecosystems
06/30/2028
06/30/2030
B1080PJ
Proposed
2026-27
3600-002-6093 (1)
2590
Budget Act
$9,313,000
Restoration of Kelp and Island Ecosystems
06/30/2029
06/30/2031
B1080PJ
Proposed
2026-27
3600-102-6093 (1)
2590
Budget Act
$1,000
Restoration of Kelp and Island Ecosystems
06/30/2029
06/30/2031
B1080PJ
Projects Enacted Total: $22,851,000
Projects Proposed Total: $9,314,000
Summary for PRC §92050 - Island Ecosystems, Climate-Ready Fisheries Management, and Kelp Ecosystems
Allocation:
$75,000,000
Statewide Bond Costs:
$563,000
Enacted/Proposed Total:
$45,995,000
Outyear Commitments:
$2,658,000
Balance:
$25,784,000
Chapter 4
Coastal Resilience
PRC §92060
Allocation: Dam Removal and Related Water Infrastructure
Net Allocation: $74,437,000
Grants or expenditures to remove outdated or obsolete dams and for related water infrastructure. Projects may also increase climate resilience, enhance sediment supply, improve wildlife and fish passage, and modernize related water infrastructure, including related planning, monitoring, permitting, habitat restoration, and recreational improvements.
PRC §92060
Department: State Coastal Conservancy
Purpose Type: Program Delivery
Chapter 4 PRC §92060
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3760-001-6093 (1)
2805032
Budget Act
$600,000
Dam Removal and Related Water Infrastructure
06/30/2026
06/30/2028
B1112PD
Proposed
2026-27
3760-001-6093 (1)
2790
Budget Act
$583,000
Dam Removal and Related Water Infrastructure
06/30/2027
06/30/2029
B1112PD
Program Delivery Enacted Total: $600,000
Program Delivery Proposed Total: $583,000
PRC §92060
Department: State Coastal Conservancy
Purpose Type: Projects
Chapter 4 PRC §92060
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3760-101-6093 (1)
2805032
Budget Act
$5,500,000
Fish Passage Barrier Removal and Habitat Restoration for Potter Valley Project
06/30/2028
06/30/2030
B1112PJ
Enacted
2025-26
3760-101-6093 (1)
2805032
Budget Act
$20,000,000
Matilija Dam Removal
06/30/2028
06/30/2030
B1112PJ
Enacted
2025-26
3760-101-6093 (1)
2805032
Budget Act
$8,500,000
Remove Outdated or Obsolete Dams
06/30/2028
06/30/2030
B1112PJ
Projects Enacted Total: $34,000,000
Summary for PRC §92060 - Dam Removal and Related Water Infrastructure
Allocation:
$75,000,000
Statewide Bond Costs:
$563,000
Enacted/Proposed Total:
$35,183,000
Outyear Commitments:
$2,332,000
Balance:
$36,922,000
Chapter 4
Coastal Resilience
PRC §92070
Allocation: Central Valley Chinook Salmon Hatcheries
Net Allocation: $24,812,000
For hatchery upgrades and expansions and for new conservation hatcheries that increase fish production and include the latest technologies to support species conservation and reintroduction efforts necessary to support genetically diverse populations of Central Valley Chinook Salmon.
PRC §92070
Department: California Department of Fish and Wildlife
Purpose Type: Program Delivery
Chapter 4 PRC §92070
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3600-003-6093 (1)
2600
Budget Act
$327,000
Hatchery Upgrades and Expansions
06/30/2026
06/30/2028
B1081PD
Proposed
2026-27
3600-003-6093 (1)
2600
Budget Act
$1,308,000
Hatchery Upgrades and Expansions
06/30/2027
06/30/2029
B1081PD
Program Delivery Enacted Total: $327,000
Program Delivery Proposed Total: $1,308,000
PRC §92070
Department: California Department of Fish and Wildlife
Purpose Type: Projects
Chapter 4 PRC §92070
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3600-004-6093 (1)
2600
Budget Act
$4,673,000
Hatchery Upgrades and Expansions
06/30/2028
06/30/2030
B1081PJ
Proposed
2026-27
3600-004-6093 (1)
2600
Budget Act
$18,504,000
Hatchery Upgrades and Expansions
06/30/2029
06/30/2031
B1081PJ
Projects Enacted Total: $4,673,000
Projects Proposed Total: $18,504,000
Summary for PRC §92070 - Central Valley Chinook Salmon Hatcheries
Allocation:
$25,000,000
Statewide Bond Costs:
$188,000
Enacted/Proposed Total:
$24,812,000
Outyear Commitments:
$0
Balance:
$0
Summary for Chapter 4: Coastal Resilience
Allocation:
$1,200,000,000
Statewide Bond Costs:
$9,003,000
Enacted/Proposed Total:
$386,637,000
Outyear Commitments:
$32,512,000
Balance:
$771,848,000
Enacted:
$279,150,000
Proposed:
$107,487,000
Chapter 5
Extreme Heat Mitigation
PRC §92510
Allocation: Extreme Heat and Community Resilience Program
Net Allocation: $49,625,000
Projects that reduce the impact of extreme heat, reduce the urban heat island effect, and build community resilience in order to strengthen communities that are vulnerable to the extreme heat impacts of climate change.
PRC §92510
Department: Land Use and Climate Innovation
Purpose Type: Program Delivery
Chapter 5 PRC §92510
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
0650-001-6093 (1)
0360
Budget Act
$1,050,000
Extreme Heat and Community Resilience Program
06/30/2026
06/30/2028
B1025PD
Program Delivery Enacted Total: $1,050,000
PRC §92510
Department: Land Use and Climate Innovation
Purpose Type: Projects
Chapter 5 PRC §92510
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
0650-101-6093 (1)
0360
Budget Act
$20,000,000
Extreme Heat and Community Resilience Program
06/30/2030
06/30/2032
B1025PJ
Enacted
2025-26
0650-101-6093 (1)
0360
Budget Act
$2,000,000
Sierra Vista and Placerita Junior High School Green Pathways
06/30/2030
06/30/2032
B1025PJ
Proposed
2026-27
0650-101-6093 (1)
0360
Budget Act
$24,125,000
Extreme Heat and Community Resilience Program
06/30/2031
06/30/2033
B1025PJ
Projects Enacted Total: $22,000,000
Projects Proposed Total: $24,125,000
Summary for PRC §92510 - Extreme Heat and Community Resilience Program
Allocation:
$50,000,000
Statewide Bond Costs:
$375,000
Enacted/Proposed Total:
$47,175,000
Outyear Commitments:
$2,450,000
Balance:
$0
Chapter 5
Extreme Heat Mitigation
PRC §92520
Allocation: Transformative Climate Communities Program
Net Allocation: $148,875,000
Projects that provide local economic, environmental, and health benefits, and improve the resilience of priority populations, as defined by the Transformative Climate Communities Program guidelines.
PRC §92520
Department: Land Use and Climate Innovation
Purpose Type: Projects
Chapter 5 PRC §92520
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Proposed
2026-27
0650-101-6093 (2)
0370
Budget Act
$137,375,000
Transformative Climate Communities Program
06/30/2031
06/30/2033
B1026PJ
Projects Proposed Total: $137,375,000
PRC §92520
Department: Land Use and Climate Innovation
Purpose Type: Technical Assistance
Chapter 5 PRC §92520
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
0650-101-6093 (2)
0370
Budget Act
$1,000,000
Transformative Climate Communities Program
06/30/2030
06/30/2032
B1026TA
Technical Assistance Enacted Total: $1,000,000
Summary for PRC §92520 - Transformative Climate Communities Program
Allocation:
$150,000,000
Statewide Bond Costs:
$1,125,000
Enacted/Proposed Total:
$138,375,000
Outyear Commitments:
$7,036,000
Balance:
$3,464,000
Chapter 5
Extreme Heat Mitigation
PRC §92530
Allocation: Urban Greening
Net Allocation: $99,250,000
Competitive grants for urban greening. These funds shall support projects that mitigate the urban heat island effect, rising temperatures, and extreme heat impacts. Eligible projects may include, but are not limited to, the creation and expansion of green streets and alleyways, and investments that support an expanded urban greening program that supports the creation of green recreational parks and green schoolyards in park-poor communities.
PRC §92530
Department: Secretary for Natural Resources
Purpose Type: Program Delivery
Chapter 5 PRC §92530
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
0540-001-6093 (1)
0320
Budget Act
$700,000
Urban Greening Program
06/30/2026
06/30/2028
B1004PD
Proposed
2026-27
0540-001-6093 (1)
0320
Budget Act
$700,000
Urban Greening Program
06/30/2027
06/30/2029
B1004PD
Program Delivery Enacted Total: $700,000
Program Delivery Proposed Total: $700,000
PRC §92530
Department: Secretary for Natural Resources
Purpose Type: Projects
Chapter 5 PRC §92530
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
0540-101-6093 (1)
0320
Budget Act
$46,125,000
Competitive Grants for Urban Greening
06/30/2028
06/30/2030
B1004PJ
Projects Enacted Total: $46,125,000
Summary for PRC §92530 - Urban Greening
Allocation:
$100,000,000
Statewide Bond Costs:
$750,000
Enacted/Proposed Total:
$47,525,000
Outyear Commitments:
$2,800,000
Balance:
$48,925,000
Chapter 5
Extreme Heat Mitigation
PRC §92540
Allocation: Urban Forests
Net Allocation: $49,625,000
Protect or augment California’s urban forests pursuant to Section 4799.12. Projects shall contribute to mitigating the urban heat island effect and extreme heat impacts.
PRC §92540
Department: California Department of Forestry and Fire Protection
Purpose Type: Program Delivery
Chapter 5 PRC §92540
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3540-006-6093 (1)
2470
Budget Act
$500,000
Urban Forestry Program
06/30/2026
06/30/2028
B1072PD
Proposed
2026-27
3540-006-6093 (1)
2470
Budget Act
$500,000
Urban Forestry Program
06/30/2027
06/30/2029
B1072PD
Program Delivery Enacted Total: $500,000
Program Delivery Proposed Total: $500,000
PRC §92540
Department: California Department of Forestry and Fire Protection
Purpose Type: Projects
Chapter 5 PRC §92540
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Proposed
2026-27
3540-106-6093 (1)
2470
Budget Act
$21,750,000
Urban and Community Forestry
06/30/2029
06/30/2032
B1072PJ
Projects Proposed Total: $21,750,000
PRC §92540
Department: California Department of Forestry and Fire Protection
Purpose Type: Technical Assistance
Chapter 5 PRC §92540
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Proposed
2026-27
3540-006-6093 (1)
2470
Budget Act
$500,000
Urban Forestry Program
06/30/2027
06/30/2029
B1072TA
Technical Assistance Proposed Total: $500,000
Summary for PRC §92540 - Urban Forests
Allocation:
$50,000,000
Statewide Bond Costs:
$375,000
Enacted/Proposed Total:
$23,250,000
Outyear Commitments:
$3,400,000
Balance:
$22,975,000
Chapter 5
Extreme Heat Mitigation
PRC §92550
Allocation: Community Resilience Centers
Net Allocation: $59,550,000
Competitive grants for the creation of strategically located community resilience centers across diverse regions of the state at eligible community facilities. These grants shall be awarded to eligible community facilities that model integrated delivery of emergency response services during disruptions, including zero-emission backup power, drinking water, clean air, cooling, food storage, shelter, telecommunications and broadband services, economic assistance, accommodation of pets, and other health protection measures and emergency resources during a disaster, state of emergency, local emergency, or deenergization event. The Office of Emergency Services and the Strategic Growth Council shall coordinate with the Department of Food and Agriculture to ensure there is no duplication with funding awarded under Section 92560.
PRC §92550
Department: Land Use and Climate Innovation
Purpose Type: Program Delivery
Chapter 5 PRC §92550
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
0650-001-6093 (2)
0370
Budget Act
$284,000
Community Resilience Centers
06/30/2026
06/30/2028
B1027PD
Proposed
2026-27
0650-001-6093 (1)
0370
Budget Act
$284,000
Community Resilience Centers
06/30/2027
06/30/2029
B1027PD
Program Delivery Enacted Total: $284,000
Program Delivery Proposed Total: $284,000
PRC §92550
Department: Land Use and Climate Innovation
Purpose Type: Projects
Chapter 5 PRC §92550
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
0650-101-6093 (2)
0370
Budget Act
$500,000
Community Resilience Centers Program
06/30/2030
06/30/2032
B1027PJ
Proposed
2026-27
0650-101-6093 (2)
0370
Budget Act
$55,000,000
Community Resilience Centers
06/30/2031
06/30/2033
B1027PJ
Projects Enacted Total: $500,000
Projects Proposed Total: $55,000,000
Summary for PRC §92550 - Community Resilience Centers
Allocation:
$60,000,000
Statewide Bond Costs:
$450,000
Enacted/Proposed Total:
$56,068,000
Outyear Commitments:
$2,243,000
Balance:
$1,239,000
Chapter 5
Extreme Heat Mitigation
PRC §92560
Allocation: Fairground Upgrades
Net Allocation: $39,700,000
Grants to fairgrounds operated by the network of California fairs for modifications or upgrades that do one or both of the following activities:
(a) Enhance the ability of those facilities to serve as multirole community, staging, and evacuation centers to provide community resilience benefits during a disaster, state of emergency, local emergency, or deenergization event.
(b) Deploy communications and broadband infrastructure at those facilities to improve their capability to serve as multirole community, staging, and evacuation centers and enhance local telecommunications service.
PRC §92560
Department: California Department of Food and Agriculture
Purpose Type: Program Delivery
Chapter 5 PRC §92560
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
8570-001-6093 (3)
6580
Budget Act
$700,000
Fairground Upgrades
06/30/2026
06/30/2028
B1230PD
Proposed
2026-27
8570-001-6093 (2)
6580
Budget Act
$700,000
Fairground Emergency Response Capability Upgrades
06/30/2027
06/30/2029
B1230PD
Program Delivery Enacted Total: $700,000
Program Delivery Proposed Total: $700,000
PRC §92560
Department: California Department of Food and Agriculture
Purpose Type: Projects
Chapter 5 PRC §92560
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
8570-101-6093 (2)
6580
Budget Act
$36,900,000
Fairground Upgrades
06/30/2028
06/30/2030
B1230PJ
Projects Enacted Total: $36,900,000
Summary for PRC §92560 - Fairground Upgrades
Allocation:
$40,000,000
Statewide Bond Costs:
$300,000
Enacted/Proposed Total:
$38,300,000
Outyear Commitments:
$1,400,000
Balance:
$0
Summary for Chapter 5: Extreme Heat Mitigation
Allocation:
$450,000,000
Statewide Bond Costs:
$3,375,000
Enacted/Proposed Total:
$350,693,000
Outyear Commitments:
$19,329,000
Balance:
$76,603,000
Enacted:
$109,759,000
Proposed:
$240,934,000
Chapter 6
Protect Biodiversity and Accelerating Nature-Based Climate Solutions
PRC §93010
Allocation: Protect and Enhance Fish and Wildlife
Net Allocation: $662,990,000
Grant programs to protect and enhance fish and wildlife resources and habitat and achieve the state’s biodiversity, public access, and conservation goals. Funding shall not be used to reduce or offset environmental mitigation or compliance obligations otherwise required, but may be used as part of a funding partnership to enhance, expand, or augment conservation efforts required by mitigation. Nothing in this subdivision authorizes the expenditure of bond funds for voluntary agreements as described in Section 80114.
PRC §93010
Department: Wildlife Conservation Board
Purpose Type: Program Delivery
Chapter 6 PRC §93010
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3640-001-6093 (1)
2710
Budget Act
$1,000,000
Protect and Enhance Fish and Wildlife Resources and Habitats
06/30/2026
06/30/2028
B1093PD
Proposed
2026-27
3640-001-6093 (1)
2710
Budget Act
$1,000,000
Protect and Enhance Fish and Wildlife Resources and Habitats
06/30/2027
06/30/2029
B1093PD
Program Delivery Enacted Total: $1,000,000
Program Delivery Proposed Total: $1,000,000
PRC §93010
Department: Wildlife Conservation Board
Purpose Type: Projects
Chapter 6 PRC §93010
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3640-101-6093 (1)
2710
Budget Act
$333,000
Bid4Birds Program
06/30/2028
06/30/2030
B1093PJ
Enacted
2025-26
3640-101-6093 (1)
2710
Budget Act
$8,000,000
BirdReturns Program
06/30/2028
06/30/2030
B1093PJ
Enacted
2025-26
3640-101-6093 (1)
2710
Budget Act
$1,670,000
California Winter Wild Rice Habitat Incentive Program
06/30/2028
06/30/2030
B1093PJ
Enacted
2025-26
3640-101-6093 (1)
2710
Budget Act
$16,000,000
Conservation Easement at San Julian Ranch
06/30/2028
06/30/2030
B1093PJ
Enacted
2025-26
3640-101-6093 (1)
2710
Budget Act
$21,500,000
Floodplain and Habitat Restoration Projects in Kern, Kings, and Tulare Counties
06/30/2028
06/30/2030
B1093PJ
Enacted
2025-26
3640-101-6093 (1)
2710
Budget Act
$5,000,000
Miles Creek and Bear Creek Infrastructure and Flood Protection Initiative
06/30/2028
06/30/2030
B1093PJ
Enacted
2025-26
3640-101-6093 (1)
2710
Budget Act
$6,300,000
Native Seed Banking
06/30/2028
06/30/2030
B1093PJ
Enacted
2025-26
3640-101-6093 (1)
2710
Budget Act
$176,197,000
Protect and Enhance Fish and Wildlife Resources and Habitats
06/30/2028
06/30/2030
B1093PJ
Enacted
2025-26
3640-601-6093
2710
Special Legislation
$20,000,000
Invasive Mussel Infestations (Including Golden Mussel)
06/30/2028
06/30/2030
B1093PJ
Proposed
2026-27
3640-101-6093 (1)
2710
Budget Act
$80,000,000
Protect and Enhance Fish and Wildlife Resources and Habitats
06/30/2029
06/30/2031
B1093PJ
Proposed
2026-27
3640-101-6093 (1)
2710
Budget Act
$30,000,000
Salton Sea Management Program - Grant to CDFA
06/30/2029
06/30/2031
B1093PJ
Projects Enacted Total: $255,000,000
Projects Proposed Total: $110,000,000
Summary for PRC §93010 - Protect and Enhance Fish and Wildlife
Allocation:
$668,000,000
Statewide Bond Costs:
$5,010,000
Enacted/Proposed Total:
$367,000,000
Outyear Commitments:
$4,500,000
Balance:
$291,490,000
Chapter 6
Protect Biodiversity and Accelerating Nature-Based Climate Solutions
PRC §93020(a)(1)
Allocation: Reduce the Risks of Climate Change Impacts
Net Allocation: $47,640,000
Reduce the Risks of Climate Change Impacts upon Communities, fish and wildlife, and Natural Resources, and increase public access.
PRC §93020(a)(1)
Department: Baldwin Hills Conservancy
Purpose Type: Program Delivery
Chapter 6 PRC §93020(a)(1)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3835-001-6093 (1)
3090
Budget Act
$400,000
Reduce the Risks of Climate Change Impacts
06/30/2026
06/30/2028
B1155PD
Proposed
2026-27
3835-001-6093 (1)
3090
Budget Act
$400,000
Reduce the Risks of Climate Change Impacts
06/30/2027
06/30/2029
B1155PD
Program Delivery Enacted Total: $400,000
Program Delivery Proposed Total: $400,000
PRC §93020(a)(1)
Department: Baldwin Hills Conservancy
Purpose Type: Projects
Chapter 6 PRC §93020(a)(1)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3835-101-6093 (1)
3090
Budget Act
$12,460,000
Reduce the Risks of Climate Change Impacts
06/30/2028
06/30/2030
B1155PJ
Projects Enacted Total: $12,460,000
Summary for PRC §93020(a)(1) - Reduce the Risks of Climate Change Impacts
Allocation:
$48,000,000
Statewide Bond Costs:
$360,000
Enacted/Proposed Total:
$13,260,000
Outyear Commitments:
$1,600,000
Balance:
$32,780,000
Chapter 6
Protect Biodiversity and Accelerating Nature-Based Climate Solutions
PRC §93020(a)(2)
Allocation: Reduce the Risks of Climate Change Impacts
Net Allocation: $28,782,000
Reduce the Risks of Climate Change Impacts upon Communities, fish and wildlife, and Natural Resources, and increase public access.
PRC §93020(a)(2)
Department: California Tahoe Conservancy
Purpose Type: Program Delivery
Chapter 6 PRC §93020(a)(2)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3125-002-6093 (1)
2340
Budget Act
$150,000
Reduce the Risks of Climate Change Impacts Upon Communities, Fish and Wildlife, and Natural Resources
06/30/2026
06/30/2028
B1036PD
Proposed
2026-27
3125-002-6093 (1)
2340
Budget Act
$150,000
Reduce the Risks of Climate Change Impacts
06/30/2027
06/30/2029
B1036PD
Program Delivery Enacted Total: $150,000
Program Delivery Proposed Total: $150,000
PRC §93020(a)(2)
Department: California Tahoe Conservancy
Purpose Type: Projects
Chapter 6 PRC §93020(a)(2)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3125-102-6093 (1)
2340
Budget Act
$4,722,000
Reduce the Risks of Climate Change Impacts Upon Communities, Fish and Wildlife, and Natural Resources
06/30/2028
06/30/2030
B1036PJ
Proposed
2026-27
3125-301-6093 (2)(a)
0001389
Budget Act
$300,000
Conceptual Feasibility Planning: Study
06/30/2027
06/30/2029
B1036PJ
Proposed
2026-27
3125-301-6093 (4)(a)
0015172
Budget Act
$600,000
Greenway Shared Use Trail Phase III: Preliminary Plans
06/30/2027
06/30/2029
B1036PJ
Proposed
2026-27
3125-301-6093 (1)(a)
0001388
Budget Act
$1,500,000
Opportunity Acquisitions: Acquisitions
06/30/2029
06/30/2031
B1036PJ
Proposed
2026-27
3125-301-6093 (3)(a)
0012976
Budget Act
$1,000,000
Van Sickle Bi-State Park Safety and Equitable Access Improvements: Working Drawings
06/30/2027
06/30/2029
B1036PJ
Projects Enacted Total: $4,722,000
Projects Proposed Total: $3,400,000
PRC §93020(a)(2)
Department: California Tahoe Conservancy
Purpose Type: Technical Assistance
Chapter 6 PRC §93020(a)(2)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3125-102-6093 (1)
2340
Budget Act
$500,000
Reduce the Risks of Climate Change Impacts Upon Communities, Fish and Wildlife, and Natural Resources
06/30/2028
06/30/2030
B1036TA
Technical Assistance Enacted Total: $500,000
Summary for PRC §93020(a)(2) - Reduce the Risks of Climate Change Impacts
Allocation:
$29,000,000
Statewide Bond Costs:
$218,000
Enacted/Proposed Total:
$8,922,000
Outyear Commitments:
$10,333,000
Balance:
$9,527,000
Chapter 6
Protect Biodiversity and Accelerating Nature-Based Climate Solutions
PRC §93020(a)(3)
Allocation: Reduce the Risks of Climate Change Impacts
Net Allocation: $10,917,000
Reduce the Risks of Climate Change Impacts upon Communities, fish and wildlife, and Natural Resources, and increase public access.
PRC §93020(a)(3)
Department: Coachella Valley Mountains Conservancy
Purpose Type: Program Delivery
Chapter 6 PRC §93020(a)(3)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3850-001-6093 (1)
3180
Budget Act
$100,000
Reduce the Risks of Climate Change Impacts
06/30/2026
06/30/2028
B1165PD
Proposed
2026-27
3850-001-6093 (1)
3180
Budget Act
$100,000
Reduce the Risks of Climate Change Impacts
06/30/2027
06/30/2029
B1165PD
Program Delivery Enacted Total: $100,000
Program Delivery Proposed Total: $100,000
PRC §93020(a)(3)
Department: Coachella Valley Mountains Conservancy
Purpose Type: Projects
Chapter 6 PRC §93020(a)(3)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3850-101-6093 (1)
3180
Budget Act
$2,200,000
Reduce the Risks of Climate Change Impacts
06/30/2028
06/30/2030
B1165PJ
Proposed
2026-27
3850-101-6093 (1)
3180
Budget Act
$2,200,000
Reduce the Risks of Climate Change Impacts
06/30/2029
06/30/2031
B1165PJ
Projects Enacted Total: $2,200,000
Projects Proposed Total: $2,200,000
Summary for PRC §93020(a)(3) - Reduce the Risks of Climate Change Impacts
Allocation:
$11,000,000
Statewide Bond Costs:
$83,000
Enacted/Proposed Total:
$4,600,000
Outyear Commitments:
$450,000
Balance:
$5,867,000
Chapter 6
Protect Biodiversity and Accelerating Nature-Based Climate Solutions
PRC §93020(a)(4)
Allocation: Reduce the Risks of Climate Change Impacts
Net Allocation: $28,782,000
Reduce the Risks of Climate Change Impacts upon Communities, fish and wildlife, and Natural Resources, and increase public access.
PRC §93020(a)(4)
Department: Sacramento-San Joaquin Delta Conservancy
Purpose Type: Program Delivery
Chapter 6 PRC §93020(a)(4)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3875-001-6093 (1)
3350
Budget Act
$300,000
Reduce the Risks of Climate Change Impacts
06/30/2026
06/30/2028
B1210PD
Proposed
2026-27
3875-001-6093 (1)
3350
Budget Act
$150,000
Ecosystem Restoration, Climate Adaption, and Community Enhancement Programs
06/30/2027
06/30/2029
B1210PD
Program Delivery Enacted Total: $300,000
Program Delivery Proposed Total: $150,000
PRC §93020(a)(4)
Department: Sacramento-San Joaquin Delta Conservancy
Purpose Type: Projects
Chapter 6 PRC §93020(a)(4)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3875-101-6093 (1)
3350
Budget Act
$4,000,000
Reduce the Risks of Climate Change Impacts - Jersey Island, Bethel Island, Small Rice Farmer Incentive
06/30/2028
06/30/2030
B1210PJ
Proposed
2026-27
3875-101-6093 (1)
3350
Budget Act
$15,000,000
Reduce the Risks of Climate Change Impacts
06/30/2029
06/30/2031
B1210PJ
Projects Enacted Total: $4,000,000
Projects Proposed Total: $15,000,000
PRC §93020(a)(4)
Department: Sacramento-San Joaquin Delta Conservancy
Purpose Type: Technical Assistance
Chapter 6 PRC §93020(a)(4)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Proposed
2026-27
3875-101-6093 (1)
3350
Budget Act
$200,000
Reduce the Risks of Climate Change Impacts
06/30/2029
06/30/2031
B1210TA
Technical Assistance Proposed Total: $200,000
Summary for PRC §93020(a)(4) - Reduce the Risks of Climate Change Impacts
Allocation:
$29,000,000
Statewide Bond Costs:
$218,000
Enacted/Proposed Total:
$19,650,000
Outyear Commitments:
$600,000
Balance:
$8,532,000
Chapter 6
Protect Biodiversity and Accelerating Nature-Based Climate Solutions
PRC §93020(a)(5)
Allocation: Reduce the Risks of Climate Change Impacts
Net Allocation: $47,640,000
Reduce the Risks of Climate Change Impacts upon Communities, fish and wildlife, and Natural Resources, and increase public access.
PRC §93020(a)(5)
Department: San Diego River Conservancy
Purpose Type: Program Delivery
Chapter 6 PRC §93020(a)(5)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3845-002-6093 (1)
3140
Budget Act
$100,000
Reduce the Risks of Climate Change Impacts
06/30/2026
06/30/2028
B1161PD
Proposed
2026-27
3845-002-6093 (1)
3140
Budget Act
$200,000
Conservation, Nature Based Solutions, and Public Access
06/30/2027
06/30/2029
B1161PD
Program Delivery Enacted Total: $100,000
Program Delivery Proposed Total: $200,000
PRC §93020(a)(5)
Department: San Diego River Conservancy
Purpose Type: Projects
Chapter 6 PRC §93020(a)(5)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3845-102-6093 (1)
3140
Budget Act
$8,000,000
Reduce the Risks of Climate Change Impacts
06/30/2028
06/30/2030
B1161PJ
Projects Enacted Total: $8,000,000
Summary for PRC §93020(a)(5) - Reduce the Risks of Climate Change Impacts
Allocation:
$48,000,000
Statewide Bond Costs:
$360,000
Enacted/Proposed Total:
$8,300,000
Outyear Commitments:
$800,000
Balance:
$38,540,000
Chapter 6
Protect Biodiversity and Accelerating Nature-Based Climate Solutions
PRC §93020(a)(6)
Allocation: Reduce the Risks of Climate Change Impacts
Net Allocation: $47,640,000
Reduce the Risks of Climate Change Impacts upon Communities, fish and wildlife, and Natural Resources, and increase public access.
PRC §93020(a)(6)
Department: San Gabriel and Lower Los Angeles Rivers and Mountains Conservancy
Purpose Type: Program Delivery
Chapter 6 PRC §93020(a)(6)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3825-003-6093 (1)
2990
Budget Act
$300,000
Reduce the Risks of Climate Change Impacts
06/30/2026
06/30/2028
B1147PD
Proposed
2026-27
3825-003-6093 (1)
2990
Budget Act
$450,000
Reduce the Risks of Climate Change Impacts
06/30/2027
06/30/2029
B1147PD
Program Delivery Enacted Total: $300,000
Program Delivery Proposed Total: $450,000
PRC §93020(a)(6)
Department: San Gabriel and Lower Los Angeles Rivers and Mountains Conservancy
Purpose Type: Projects
Chapter 6 PRC §93020(a)(6)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3825-103-6093 (1)
2990
Budget Act
$10,000,000
Reduce the Risks of Climate Change Impacts
06/30/2028
06/30/2030
B1147PJ
Proposed
2026-27
3825-103-6093 (1)
2990
Budget Act
$11,000,000
Reduce the Risks of Climate Change Impacts
06/30/2029
06/30/2031
B1147PJ
Projects Enacted Total: $10,000,000
Projects Proposed Total: $11,000,000
Summary for PRC §93020(a)(6) - Reduce the Risks of Climate Change Impacts
Allocation:
$48,000,000
Statewide Bond Costs:
$360,000
Enacted/Proposed Total:
$21,750,000
Outyear Commitments:
$2,000,000
Balance:
$23,890,000
Chapter 6
Protect Biodiversity and Accelerating Nature-Based Climate Solutions
PRC §93020(a)(7)
Allocation: Reduce the Risks of Climate Change Impacts
Net Allocation: $10,918,000
Reduce the Risks of Climate Change Impacts upon Communities, fish and wildlife, and Natural Resources, and increase public access.
PRC §93020(a)(7)
Department: San Joaquin River Conservancy
Purpose Type: Program Delivery
Chapter 6 PRC §93020(a)(7)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3830-001-6093 (1)
3050
Budget Act
$192,000
Reduce the Risks of Climate Change Impacts
06/30/2026
06/30/2028
B1150PD
Proposed
2026-27
3830-001-6093 (1)
3050
Budget Act
$192,000
Reduce the Risks of Climate Change Impacts
06/30/2027
06/30/2029
B1150PD
Program Delivery Enacted Total: $192,000
Program Delivery Proposed Total: $192,000
PRC §93020(a)(7)
Department: San Joaquin River Conservancy
Purpose Type: Projects
Chapter 6 PRC §93020(a)(7)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3830-101-6093 (1)
3050
Budget Act
$5,115,000
Reduce the Risks of Climate Change Impacts
06/30/2028
06/30/2030
B1150PJ
Proposed
2026-27
3830-101-6093 (1)
3050
Budget Act
$5,035,000
Reduce the Risks of Climate Change Impacts
06/30/2029
06/30/2031
B1150PJ
Projects Enacted Total: $5,115,000
Projects Proposed Total: $5,035,000
Summary for PRC §93020(a)(7) - Reduce the Risks of Climate Change Impacts
Allocation:
$11,000,000
Statewide Bond Costs:
$82,000
Enacted/Proposed Total:
$10,534,000
Outyear Commitments:
$384,000
Balance:
$0
Chapter 6
Protect Biodiversity and Accelerating Nature-Based Climate Solutions
PRC §93020(a)(8)
Allocation: Reduce the Risks of Climate Change Impacts
Net Allocation: $47,640,000
Reduce the Risks of Climate Change Impacts upon Communities, fish and wildlife, and Natural Resources, and increase public access.
PRC §93020(a)(8)
Department: Santa Monica Mountains Conservancy
Purpose Type: Program Delivery
Chapter 6 PRC §93020(a)(8)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3810-003-6093 (1)
2940
Budget Act
$400,000
Reduce the Risks of Climate Change Impacts
06/30/2026
06/30/2028
B1137PD
Proposed
2026-27
3810-003-6093 (1)
2940
Budget Act
$400,000
Reduce the Risks of Climate Change Impacts
06/30/2027
06/30/2029
B1137PD
Program Delivery Enacted Total: $400,000
Program Delivery Proposed Total: $400,000
PRC §93020(a)(8)
Department: Santa Monica Mountains Conservancy
Purpose Type: Projects
Chapter 6 PRC §93020(a)(8)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3810-103-6093 (1)
2945
Budget Act
$23,685,000
Reduce the Risks of Climate Change Impacts
06/30/2028
06/30/2030
B1137PJ
Proposed
2026-27
3810-103-6093 (1)
2945
Budget Act
$7,000,000
Reduce the Risks of Climate Change Impacts
06/30/2029
06/30/2031
B1137PJ
Projects Enacted Total: $23,685,000
Projects Proposed Total: $7,000,000
PRC §93020(a)(8)
Department: Santa Monica Mountains Conservancy
Purpose Type: Community Access
Chapter 6 PRC §93020(a)(8)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3810-103-6093 (1)
2945
Budget Act
$1,315,000
Reduce the Risks of Climate Change Impacts
06/30/2028
06/30/2030
B1137CA
Community Access Enacted Total: $1,315,000
Summary for PRC §93020(a)(8) - Reduce the Risks of Climate Change Impacts
Allocation:
$48,000,000
Statewide Bond Costs:
$360,000
Enacted/Proposed Total:
$32,800,000
Outyear Commitments:
$800,000
Balance:
$14,040,000
Chapter 6
Protect Biodiversity and Accelerating Nature-Based Climate Solutions
PRC §93020(a)(9)
Allocation: Reduce the Risks of Climate Change Impacts
Net Allocation: $47,640,000
Reduce the Risks of Climate Change Impacts upon Communities, fish and wildlife, and Natural Resources, and increase public access.
PRC §93020(a)(9)
Department: Sierra Nevada Conservancy
Purpose Type: Program Delivery
Chapter 6 PRC §93020(a)(9)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Proposed
2026-27
3855-003-6093 (1)
3220
Budget Act
$59,000
Nature-Based Solutions
06/30/2027
06/30/2029
B1172PD
Program Delivery Proposed Total: $59,000
PRC §93020(a)(9)
Department: Sierra Nevada Conservancy
Purpose Type: Projects
Chapter 6 PRC §93020(a)(9)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3855-103-6093 (1)
3220
Budget Act
$9,925,000
Reduce the Risks of Climate Change Impacts
06/30/2028
06/30/2030
B1172PJ
Projects Enacted Total: $9,925,000
Summary for PRC §93020(a)(9) - Reduce the Risks of Climate Change Impacts
Allocation:
$48,000,000
Statewide Bond Costs:
$360,000
Enacted/Proposed Total:
$9,984,000
Outyear Commitments:
$944,000
Balance:
$36,712,000
Chapter 6
Protect Biodiversity and Accelerating Nature-Based Climate Solutions
PRC §93010; 93030 ref 1
Allocation: Improve Habitat Connectivity and Establish Wildlife Crossings and Corridors
Net Allocation: $99,250,000
Projects to improve habitat connectivity and establish wildlife crossings and corridors.
PRC §93010; 93030 ref 1
Department: Wildlife Conservation Board
Purpose Type: Program Delivery
Chapter 6 PRC §93010; 93030 ref 1
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3640-001-6093 (1)
2710
Budget Act
$500,000
Improve Habitat Connectivity and Establish Wildlife Crossings and Corridors
06/30/2026
06/30/2028
B1094PD
Proposed
2026-27
3640-001-6093 (1)
2710
Budget Act
$500,000
Improve Habitat Connectivity and Establish Wildlife Crossings and Corridors
06/30/2027
06/30/2029
B1094PD
Program Delivery Enacted Total: $500,000
Program Delivery Proposed Total: $500,000
PRC §93010; 93030 ref 1
Department: Wildlife Conservation Board
Purpose Type: Projects
Chapter 6 PRC §93010; 93030 ref 1
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3640-102-6093 (1)
2710
Budget Act
$20,000,000
Improve Habitat Connectivity and Establish Wildlife Crossings and Corridors
06/30/2028
06/30/2030
B1094PJ
Proposed
2026-27
3640-102-6093 (1)
2710
Budget Act
$20,000,000
Improve Habitat Connectivity and Establish Wildlife Crossings and Corridors
06/30/2029
06/30/2031
B1094PJ
Projects Enacted Total: $20,000,000
Projects Proposed Total: $20,000,000
Summary for PRC §93010; 93030 ref 1 - Improve Habitat Connectivity and Establish Wildlife Crossings and Corridors
Allocation:
$100,000,000
Statewide Bond Costs:
$750,000
Enacted/Proposed Total:
$41,000,000
Outyear Commitments:
$2,000,000
Balance:
$56,250,000
Chapter 6
Protect Biodiversity and Accelerating Nature-Based Climate Solutions
PRC §93010; 93030 ref 2
Allocation: San Andreas Corridor Program
Net Allocation: $79,400,000
Establish the San Andreas Corridor Program for the protection and restoration of wildlife corridors along the inner Coast Ranges and the San Andreas Fault.
PRC §93010; 93030 ref 2
Department: Wildlife Conservation Board
Purpose Type: Projects
Chapter 6 PRC §93010; 93030 ref 2
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Proposed
2026-27
3640-108-6093 (1)
2710
Budget Act
$20,000,000
San Andreas Corridor Program
06/30/2029
06/30/2031
B1095PJ
Projects Proposed Total: $20,000,000
Summary for PRC §93010; 93030 ref 2 - San Andreas Corridor Program
Allocation:
$80,000,000
Statewide Bond Costs:
$600,000
Enacted/Proposed Total:
$20,000,000
Outyear Commitments:
$0
Balance:
$59,400,000
Chapter 6
Protect Biodiversity and Accelerating Nature-Based Climate Solutions
PRC §93040
Allocation: Tribal Nature-Based Solutions Program
Net Allocation: $9,925,000
Tribal Nature-Based Solutions Program
PRC §93040
Department: Secretary for Natural Resources
Purpose Type: Program Delivery
Chapter 6 PRC §93040
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
0540-001-6093 (1)
0320
Budget Act
$175,000
Tribal Nature Based Solutions Program
06/30/2026
06/30/2028
B1005PD
Proposed
2026-27
0540-001-6093 (1)
0320
Budget Act
$175,000
Tribal Nature Based Solutions Program
06/30/2027
06/30/2029
B1005PD
Program Delivery Enacted Total: $175,000
Program Delivery Proposed Total: $175,000
PRC §93040
Department: Secretary for Natural Resources
Purpose Type: Projects
Chapter 6 PRC §93040
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
0540-101-6093 (1)
0320
Budget Act
$9,225,000
Tribal Nature Based Solutions Program
06/30/2028
06/30/2030
B1005PJ
Projects Enacted Total: $9,225,000
Summary for PRC §93040 - Tribal Nature-Based Solutions Program
Allocation:
$10,000,000
Statewide Bond Costs:
$75,000
Enacted/Proposed Total:
$9,575,000
Outyear Commitments:
$350,000
Balance:
$0
Chapter 6
Protect Biodiversity and Accelerating Nature-Based Climate Solutions
PRC §93010; 93050
Allocation: Southern Ballona Creek Watershed
Net Allocation: $21,835,000
Projects for climate change adaptation improvements to protect, conserve, and restore the health and resilience of the southern Ballona Creek Watershed.
PRC §93010; 93050
Department: Wildlife Conservation Board
Purpose Type: Projects
Chapter 6 PRC §93010; 93050
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3640-106-6093 (1)
2710
Budget Act
$20,000,000
Southern Ballona Creek Watershed
06/30/2028
06/30/2030
B1096PJ
Proposed
2026-27
3640-106-6093 (1)
2710
Budget Act
$1,835,000
Southern Ballona Creek Watershed
06/30/2028
06/30/2030
B1096PJ
Projects Enacted Total: $20,000,000
Projects Proposed Total: $1,835,000
Summary for PRC §93010; 93050 - Southern Ballona Creek Watershed
Allocation:
$22,000,000
Statewide Bond Costs:
$165,000
Enacted/Proposed Total:
$21,835,000
Outyear Commitments:
$0
Balance:
$0
Summary for Chapter 6: Protect Biodiversity and Accelerating Nature-Based Climate Solutions
Allocation:
$1,200,000,000
Statewide Bond Costs:
$9,001,000
Enacted/Proposed Total:
$589,210,000
Outyear Commitments:
$24,761,000
Balance:
$577,028,000
Enacted:
$389,764,000
Proposed:
$199,446,000
Chapter 7
Climate Smart, Sustainable, and Resilient Farms, Ranches, and Working Lands
PRC §93510(a)
Allocation: Soil Health, Atmospheric Carbon Removal, or Soil Carbon Sequestration
Net Allocation: $64,513,000
Grants to promote practices on farms and ranches that improve soil health, or accelerate atmospheric carbon removal or soil carbon sequestration. Funds shall be allocated to projects that provide meaningful and direct benefits to socially disadvantaged farmers and ranchers.
PRC §93510(a)
Department: California Department of Food and Agriculture
Purpose Type: Program Delivery
Chapter 7 PRC §93510(a)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
8570-001-6093 (4)
6590
Budget Act
$910,000
Healthy Soils
06/30/2026
06/30/2028
B1231PD
Proposed
2026-27
8570-001-6093 (3)
6590
Budget Act
$910,000
Healthy Soils
06/30/2027
06/30/2029
B1231PD
Program Delivery Enacted Total: $910,000
Program Delivery Proposed Total: $910,000
PRC §93510(a)
Department: California Department of Food and Agriculture
Purpose Type: Projects
Chapter 7 PRC §93510(a)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
8570-101-6093 (3)
6590
Budget Act
$35,000,000
Healthy Soils Program
06/30/2028
06/30/2030
B1231PJ
Proposed
2026-27
8570-101-6093 (2)
6590
Budget Act
$24,963,000
Healthy Soils
06/30/2029
06/30/2031
B1231PJ
Projects Enacted Total: $35,000,000
Projects Proposed Total: $24,963,000
Summary for PRC §93510(a) - Soil Health, Atmospheric Carbon Removal, or Soil Carbon Sequestration
Allocation:
$65,000,000
Statewide Bond Costs:
$487,000
Enacted/Proposed Total:
$61,783,000
Outyear Commitments:
$2,730,000
Balance:
$0
Chapter 7
Climate Smart, Sustainable, and Resilient Farms, Ranches, and Working Lands
PRC §93510(b)
Allocation: State Water Efficiency and Enhancement Program
Net Allocation: $39,700,000
State Water Efficiency and Enhancement Program to promote onfarm water use efficiency with a focus on multiple-benefit projects that improve resilience to climate change and save water on California agricultural operations. Funds shall be allocated to projects that provide meaningful and direct benefits to socially disadvantaged farmers and ranchers.
PRC §93510(b)
Department: California Department of Food and Agriculture
Purpose Type: Program Delivery
Chapter 7 PRC §93510(b)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
8570-001-6093 (4)
6590
Budget Act
$700,000
State Water Efficiency and Enhancement Program (SWEEP)
06/30/2026
06/30/2028
B1232PD
Proposed
2026-27
8570-001-6093 (3)
6590
Budget Act
$700,000
State Water Efficiency and Enhancement Program (SWEEP)
06/30/2027
06/30/2029
B1232PD
Program Delivery Enacted Total: $700,000
Program Delivery Proposed Total: $700,000
PRC §93510(b)
Department: California Department of Food and Agriculture
Purpose Type: Projects
Chapter 7 PRC §93510(b)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
8570-101-6093 (3)
6590
Budget Act
$36,900,000
State Water Efficiency and Enhancement Program (SWEEP)
06/30/2028
06/30/2030
B1232PJ
Projects Enacted Total: $36,900,000
Summary for PRC §93510(b) - State Water Efficiency and Enhancement Program
Allocation:
$40,000,000
Statewide Bond Costs:
$300,000
Enacted/Proposed Total:
$38,300,000
Outyear Commitments:
$1,400,000
Balance:
$0
Chapter 7
Climate Smart, Sustainable, and Resilient Farms, Ranches, and Working Lands
PRC §93520
Allocation: Invasive Species Projects
Net Allocation: $19,850,000
Invasive species projects and activities recommended by the Invasive Species Council of California. Preference shall be given to projects that restore and protect biodiversity and ecosystem health. Consideration shall be given to geographic equity.
PRC §93520
Department: California Department of Food and Agriculture
Purpose Type: Projects
Chapter 7 PRC §93520
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
8570-001-6093 (1)
6570
Budget Act
$19,850,000
Invasive Species Account
06/30/2026
06/30/2028
B1233PJ
Projects Enacted Total: $19,850,000
Summary for PRC §93520 - Invasive Species Projects
Allocation:
$20,000,000
Statewide Bond Costs:
$150,000
Enacted/Proposed Total:
$19,850,000
Outyear Commitments:
$0
Balance:
$0
Chapter 7
Climate Smart, Sustainable, and Resilient Farms, Ranches, and Working Lands
PRC §93530
Allocation: Protection, Restoration, Conservation and Enhancement of Farm and Range Lands
Net Allocation: $14,888,000
Projects for the protection, restoration, conservation, and enhancement of farmland and rangeland, including, but not limited to, the acquisition of fee title or easements, that improve climate resilience, open-space soil health, atmospheric carbon removal, soil carbon sequestration, erosion control, watershed health, water quality, or water retention. Projects shall provide multiple benefits. In awarding funds for farmland and rangeland projects pursuant to this section, the Department of Conservation shall give preference to projects for small- and medium-sized farms.
PRC §93530
Department: Department of Conservation
Purpose Type: Program Delivery
Chapter 7 PRC §93530
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3480-004-6093 (1)
2430
Budget Act
$150,000
Protection, Restoration, Conservation, and Enhancement of Farm and Range Lands
06/30/2026
06/30/2028
B1058PD
Proposed
2026-27
3480-004-6093 (1)
2430
Budget Act
$150,000
Working Lands Conservation, Restoration, and Enhancement
06/30/2027
06/30/2029
B1058PD
Program Delivery Enacted Total: $150,000
Program Delivery Proposed Total: $150,000
PRC §93530
Department: Department of Conservation
Purpose Type: Projects
Chapter 7 PRC §93530
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3480-104-6093 (1)
2430
Budget Act
$5,000,000
Grants for the Planning, Design, and Implementation of Projects
06/30/2028
06/30/2030
B1058PJ
Enacted
2025-26
3480-104-6093 (1)
2430
Budget Act
$1,850,000
Protection, Restoration, Conservation, and Enhancement of Farm and Range Lands
06/30/2028
06/30/2030
B1058PJ
Projects Enacted Total: $6,850,000
Summary for PRC §93530 - Protection, Restoration, Conservation and Enhancement of Farm and Range Lands
Allocation:
$15,000,000
Statewide Bond Costs:
$112,000
Enacted/Proposed Total:
$7,150,000
Outyear Commitments:
$550,000
Balance:
$7,188,000
Chapter 7
Climate Smart, Sustainable, and Resilient Farms, Ranches, and Working Lands
PRC §93540(a)
Allocation: Certified Mobile Farmers' Markets
Net Allocation: $19,850,000
infrastructure related to certified mobile farmers' markets, including, but not limited to, a mobile farmers market vehicle, refrigeration, and other equipment to comply with relevant sections of the Health and Safety Code and related regulations.
PRC §93540(a)
Department: California Department of Food and Agriculture
Purpose Type: Program Delivery
Chapter 7 PRC §93540(a)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
8570-001-6093 (2)
6575
Budget Act
$350,000
Certified Mobile Farmers' Markets
06/30/2026
06/30/2028
B1234PD
Proposed
2026-27
8570-001-6093 (1)
6575
Budget Act
$350,000
Certified Mobile Farmers' Markets
06/30/2027
06/30/2029
B1234PD
Program Delivery Enacted Total: $350,000
Program Delivery Proposed Total: $350,000
PRC §93540(a)
Department: California Department of Food and Agriculture
Purpose Type: Projects
Chapter 7 PRC §93540(a)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
8570-101-6093 (1)
6575
Budget Act
$9,250,000
Certified Mobile Farmers' Markets
06/30/2028
06/30/2030
B1234PJ
Proposed
2026-27
8570-101-6093 (1)
6575
Budget Act
$9,200,000
Certified Mobile Farmers' Markets
06/30/2029
06/30/2031
B1234PJ
Projects Enacted Total: $9,250,000
Projects Proposed Total: $9,200,000
Summary for PRC §93540(a) - Certified Mobile Farmers' Markets
Allocation:
$20,000,000
Statewide Bond Costs:
$150,000
Enacted/Proposed Total:
$19,150,000
Outyear Commitments:
$700,000
Balance:
$0
Chapter 7
Climate Smart, Sustainable, and Resilient Farms, Ranches, and Working Lands
PRC §93540(b)
Allocation: Year-Round Certified Farmers' Markets
Net Allocation: $19,850,000
Develop year-round infrastructure for certified farmers’ markets, as defined in Section 47004 of the Food and Agricultural Code, fishermen’s markets, as defined in Section 113780 of the Health and Safety Code, or tribe-operated or native-serving farmers’ markets.
PRC §93540(b)
Department: California Department of Food and Agriculture
Purpose Type: Program Delivery
Chapter 7 PRC §93540(b)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
8570-001-6093 (2)
6575
Budget Act
$350,000
Year-round Certified Farmers' Markets
06/30/2026
06/30/2028
B1235PD
Proposed
2026-27
8570-001-6093 (1)
6575
Budget Act
$350,000
Year-round Certified Farmers' Markets
06/30/2027
06/30/2029
B1235PD
Program Delivery Enacted Total: $350,000
Program Delivery Proposed Total: $350,000
PRC §93540(b)
Department: California Department of Food and Agriculture
Purpose Type: Projects
Chapter 7 PRC §93540(b)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
8570-101-6093 (1)
6575
Budget Act
$9,250,000
Year-round Certified Farmers' Markets
06/30/2028
06/30/2030
B1235PJ
Proposed
2026-27
8570-101-6093 (1)
6575
Budget Act
$9,200,000
Year-round Certified Farmers' Markets
06/30/2029
06/30/2031
B1235PJ
Projects Enacted Total: $9,250,000
Projects Proposed Total: $9,200,000
Summary for PRC §93540(b) - Year-Round Certified Farmers' Markets
Allocation:
$20,000,000
Statewide Bond Costs:
$150,000
Enacted/Proposed Total:
$19,150,000
Outyear Commitments:
$700,000
Balance:
$0
Chapter 7
Climate Smart, Sustainable, and Resilient Farms, Ranches, and Working Lands
PRC §93540(c)
Allocation: Urban Agriculture Projects
Net Allocation: $19,850,000
Urban agriculture projects that create or expand city or suburban community farms or gardens, including community food producers, as defined in Section 113752 of the Health and Safety Code, through in-ground small plot cultivation, raised beds, mushroom growing, rooftop farms, and cultivation of vacant lots and in parks.
PRC §93540(c)
Department: California Department of Food and Agriculture
Purpose Type: Program Delivery
Chapter 7 PRC §93540(c)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
8570-001-6093 (2)
6575
Budget Act
$350,000
Urban Agriculture Projects
06/30/2026
06/30/2028
B1236PD
Proposed
2026-27
8570-001-6093 (1)
6575
Budget Act
$350,000
Urban Agriculture Projects
06/30/2027
06/30/2029
B1236PD
Program Delivery Enacted Total: $350,000
Program Delivery Proposed Total: $350,000
PRC §93540(c)
Department: California Department of Food and Agriculture
Purpose Type: Projects
Chapter 7 PRC §93540(c)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
8570-101-6093 (1)
6575
Budget Act
$18,450,000
Urban Agriculture Projects
06/30/2028
06/30/2030
B1236PJ
Projects Enacted Total: $18,450,000
Summary for PRC §93540(c) - Urban Agriculture Projects
Allocation:
$20,000,000
Statewide Bond Costs:
$150,000
Enacted/Proposed Total:
$19,150,000
Outyear Commitments:
$700,000
Balance:
$0
Chapter 7
Climate Smart, Sustainable, and Resilient Farms, Ranches, and Working Lands
PRC §93540(d)
Allocation: Regional Farm Equipment Sharing
Net Allocation: $14,888,000
Grants for regional farm equipment sharing. Preference shall be given to projects and programs that benefit small- and medium-sized farms and socially disadvantaged farmers and ranchers.
PRC §93540(d)
Department: California Department of Food and Agriculture
Purpose Type: Program Delivery
Chapter 7 PRC §93540(d)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
8570-001-6093 (4)
6590
Budget Act
$210,000
Regional Farm Equipment Sharing
06/30/2026
06/30/2028
B1237PD
Proposed
2026-27
8570-001-6093 (3)
6590
Budget Act
$210,000
Regional Farm Equipment Sharing
06/30/2027
06/30/2029
B1237PD
Program Delivery Enacted Total: $210,000
Program Delivery Proposed Total: $210,000
PRC §93540(d)
Department: California Department of Food and Agriculture
Purpose Type: Projects
Chapter 7 PRC §93540(d)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Proposed
2026-27
8570-101-6093 (2)
6590
Budget Act
$13,838,000
Regional Farm Equipment Sharing
06/30/2029
06/30/2031
B1237PJ
Projects Proposed Total: $13,838,000
Summary for PRC §93540(d) - Regional Farm Equipment Sharing
Allocation:
$15,000,000
Statewide Bond Costs:
$112,000
Enacted/Proposed Total:
$14,258,000
Outyear Commitments:
$630,000
Balance:
$0
Chapter 7
Climate Smart, Sustainable, and Resilient Farms, Ranches, and Working Lands
PRC §93540(e)
Allocation: Tribal Food Sovereignty
Net Allocation: $14,888,000
To advance tribes’ food sovereignty to grow, produce, procure, and distribute foods that reflect Native American culture and traditions and support the development of tribal producers and vendors, including, but not limited to, the following projects:
(1) Irrigation and water infrastructure.
(2) Utility and power infrastructure.
(3) Food processing infrastructure.
PRC §93540(e)
Department: California Department of Food and Agriculture
Purpose Type: Program Delivery
Chapter 7 PRC §93540(e)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
8570-001-6093 (4)
6590
Budget Act
$210,000
Tribal Food Sovereignty
06/30/2026
06/30/2028
B1238PD
Proposed
2026-27
8570-001-6093 (3)
6590
Budget Act
$210,000
Tribal Food Sovereignty
06/30/2027
06/30/2029
B1238PD
Program Delivery Enacted Total: $210,000
Program Delivery Proposed Total: $210,000
PRC §93540(e)
Department: California Department of Food and Agriculture
Purpose Type: Projects
Chapter 7 PRC §93540(e)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Proposed
2026-27
8570-101-6093 (2)
6590
Budget Act
$13,838,000
Tribal Food Sovereignty
06/30/2029
06/30/2031
B1238PJ
Projects Proposed Total: $13,838,000
Summary for PRC §93540(e) - Tribal Food Sovereignty
Allocation:
$15,000,000
Statewide Bond Costs:
$112,000
Enacted/Proposed Total:
$14,258,000
Outyear Commitments:
$630,000
Balance:
$0
Chapter 7
Climate Smart, Sustainable, and Resilient Farms, Ranches, and Working Lands
PRC §93550
Allocation: Land Access and Tenure for Socially Disadvantaged Farmers or Ranchers, Tribal Producers, and Beginning Farmers and Ranchers
Net Allocation: $29,775,000
In consultation with the California Agricultural Land Equity Task Force at the Strategic Growth Council, to improve land access and tenure for socially disadvantaged farmers or ranchers, tribal producers, and beginning farmers and ranchers. May make low-interest loans to qualified entities, which shall include land trusts, nonprofit organizations, public agencies, farmer cooperatives, tribal governments, or tribal entities, for the purpose of acquiring agricultural lands to transfer or provide long-term leases to socially disadvantaged farmers or ranchers and beginning farmers and ranchers. Any agricultural land acquired pursuant to this section shall be required to have an agricultural land conservation easement before being leased or transferred, and the department may require additional appropriate resale restrictions, such as affordability provisions, preemptive purchase right, or shared appreciation consistent with the purposes of this subdivision. The Department of Conservation shall ensure that the proceeds of future resales of land continue to be used for purposes of this chapter.
PRC §93550
Department: Department of Conservation
Purpose Type: Program Delivery
Chapter 7 PRC §93550
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Proposed
2026-27
3480-005-6093 (1)
2430
Budget Act
$375,000
Agricultural Land Access and Tenure Loan Program
06/30/2027
06/30/2029
B1059PD
Program Delivery Proposed Total: $375,000
PRC §93550
Department: Department of Conservation
Purpose Type: Projects
Chapter 7 PRC §93550
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Proposed
2026-27
3480-105-6093 (1)
2430
Budget Act
$4,600,000
Land Access and Tenure for Socially Disadvantaged Farmers/Ranchers, Tribal Producers, and Beginning Farmers/Ranchers
06/30/2029
06/30/2031
B1059PJ
Projects Proposed Total: $4,600,000
Summary for PRC §93550 - Land Access and Tenure for Socially Disadvantaged Farmers or Ranchers, Tribal Producers, and Beginning Farmers and Ranchers
Allocation:
$30,000,000
Statewide Bond Costs:
$225,000
Enacted/Proposed Total:
$4,975,000
Outyear Commitments:
$900,000
Balance:
$23,900,000
Chapter 7
Climate Smart, Sustainable, and Resilient Farms, Ranches, and Working Lands
PRC §93560
Allocation: Vanpool Vehicles, Clean Technologies, and Infrastructure
Net Allocation: $14,888,000
Grants for the deployment of vanpool vehicles, clean technologies, and related facilities, including, but not limited to, charging and alternative fuel infrastructure, for use by low-income agricultural workers.
PRC §93560
Department: Unspecified
Purpose Type: N/A
Chapter 7 PRC §93560
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
$0
N/A Enacted Total: $0
Summary for PRC §93560 - Vanpool Vehicles, Clean Technologies, and Infrastructure
Allocation:
$15,000,000
Statewide Bond Costs:
$112,000
Enacted/Proposed Total:
$0
Outyear Commitments:
$0
Balance:
$14,888,000
Chapter 7
Climate Smart, Sustainable, and Resilient Farms, Ranches, and Working Lands
PRC §93570
Allocation: Postsecondary Educational Institutions to Develop Research Farms to Improve Climate Resiliency
Net Allocation: $14,888,000
In consultation with the Department of Food and Agriculture to develop research farms to improve climate resiliency. Funding provided pursuant to this section shall not exceed one million dollars ($1,000,000) per institution and shall be constructed and maintained with environmentally sustainable infrastructure practices.
PRC §93570
Department: Department of Education
Purpose Type: Program Delivery
Chapter 7 PRC §93570
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
6100-001-6093 (1)
5205010
Budget Act
$1,050,000
Grants to Postsecondary Education Institutions to Develop Research Farms to Improve Climate Resiliency
06/30/2026
06/30/2028
B1245PD
Program Delivery Enacted Total: $1,050,000
PRC §93570
Department: Department of Education
Purpose Type: Projects
Chapter 7 PRC §93570
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
6100-101-6093 (1)
5205223
Budget Act
$13,838,000
Grants to Postsecondary Education Institutions to Develop Research Farms to Improve Climate Resiliency
06/30/2028
06/30/2031
B1245PJ
Projects Enacted Total: $13,838,000
Summary for PRC §93570 - Postsecondary Educational Institutions to Develop Research Farms to Improve Climate Resiliency
Allocation:
$15,000,000
Statewide Bond Costs:
$112,000
Enacted/Proposed Total:
$14,888,000
Outyear Commitments:
$0
Balance:
$0
Chapter 7
Climate Smart, Sustainable, and Resilient Farms, Ranches, and Working Lands
PRC §93580
Allocation: Farmworkers Housing Component of the Low-Income Weatherization Program
Net Allocation: $9,925,000
As part of the Farmworker Housing Component of the Low-Income Weatherization Program through the Department of Community Services and Development, to low-income farmworker households for no-cost energy efficiency upgrades designed to reduce greenhouse gas emissions by saving energy. These energy efficiency upgrades shall include, but are not limited to, insulation, central heating and cooling system upgrades, lighting upgrades, and window replacement.
PRC §93580
Department: Department of Community Services and Development
Purpose Type: Program Delivery
Chapter 7 PRC §93580
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
4700-001-6093 (1)
4181
Budget Act
$230,000
Low-Income Weatherization Program – Farmworkers Housing Component
06/30/2026
06/30/2028
B1225PD
Proposed
2026-27
4700-001-6093 (1)
4181
Budget Act
$230,000
Low-Income Weatherization Program – Farmworkers Housing Component
06/30/2027
06/30/2029
B1225PD
Program Delivery Enacted Total: $230,000
Program Delivery Proposed Total: $230,000
PRC §93580
Department: Department of Community Services and Development
Purpose Type: Projects
Chapter 7 PRC §93580
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Proposed
2026-27
4700-101-6093 (1)
4181
Budget Act
$9,229,000
Low-Income Weatherization Program – Farmworkers Housing Component
06/30/2029
06/30/2031
B1225PJ
Projects Proposed Total: $9,229,000
Summary for PRC §93580 - Farmworkers Housing Component of the Low-Income Weatherization Program
Allocation:
$10,000,000
Statewide Bond Costs:
$75,000
Enacted/Proposed Total:
$9,689,000
Outyear Commitments:
$236,000
Balance:
$0
Summary for Chapter 7: Climate Smart, Sustainable, and Resilient Farms, Ranches, and Working Lands
Allocation:
$300,000,000
Statewide Bond Costs:
$2,247,000
Enacted/Proposed Total:
$242,601,000
Outyear Commitments:
$9,176,000
Balance:
$45,976,000
Enacted:
$153,898,000
Proposed:
$88,703,000
Chapter 8
Park Creation and Outdoor Access
PRC §94010(a)
Allocation: Creation, Expansion, and Renovation of Safe Neighborhood Parks
Net Allocation: $178,650,000
Competitive grant program in accordance with the Statewide Park Development and Community Revitalization Act of 2008 described in Chapter 3.3 (commencing with Section 5640) of Division 5.for the creation, expansion, and renovation of safe neighborhood parks in park-poor neighborhoods.
PRC §94010(a)
Department: California State Parks
Purpose Type: Program Delivery
Chapter 8 PRC §94010(a)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3790-001-6093 (1)
2840
Budget Act
$1,350,000
Statewide Park Program
06/30/2026
06/30/2028
B1122PD
Proposed
2026-27
3790-001-6093 (1)
2840
Budget Act
$1,710,000
Statewide Park Program
06/30/2027
06/30/2029
B1122PD
Program Delivery Enacted Total: $1,350,000
Program Delivery Proposed Total: $1,710,000
PRC §94010(a)
Department: California State Parks
Purpose Type: Projects
Chapter 8 PRC §94010(a)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3790-101-6093 (1)
2855036
Budget Act
$169,650,000
Safe Neighborhood Parks
06/30/2028
06/30/2031
B1122PJ
Projects Enacted Total: $169,650,000
Summary for PRC §94010(a) - Creation, Expansion, and Renovation of Safe Neighborhood Parks
Allocation:
$180,000,000
Statewide Bond Costs:
$1,350,000
Enacted/Proposed Total:
$172,710,000
Outyear Commitments:
$5,940,000
Balance:
$0
Chapter 8
Park Creation and Outdoor Access
PRC §94010(c)
Allocation: Rehabilitation, Repurposing, or Substantial Improvement of Existing Park Infrastructure
Net Allocation: $19,850,000
For the rehabilitation, repurposing, or substantial improvement of existing park infrastructure that will lead to increased use and enhanced user experiences or increase access, including, but not limited to, for individuals with disabilities, as defined by the federal Americans with Disabilities Act of 1990 (42 U.S.C. Sec. 12101 et seq.).
PRC §94010(c)
Department: California State Parks
Purpose Type: Program Delivery
Chapter 8 PRC §94010(c)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3790-001-6093 (1)
2840
Budget Act
$150,000
Statewide Park Program - Existing Park Infrastructure
06/30/2026
06/30/2028
B1123PD
Proposed
2026-27
3790-001-6093 (1)
2840
Budget Act
$190,000
Statewide Park Program – Existing Park Infrastructure
06/30/2027
06/30/2029
B1123PD
Program Delivery Enacted Total: $150,000
Program Delivery Proposed Total: $190,000
PRC §94010(c)
Department: California State Parks
Purpose Type: Projects
Chapter 8 PRC §94010(c)
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3790-101-6093 (1)
2855036
Budget Act
$18,850,000
Safe Neighborhood Parks - Existing Park Infrastructure
06/30/2028
06/30/2031
B1123PJ
Projects Enacted Total: $18,850,000
Summary for PRC §94010(c) - Rehabilitation, Repurposing, or Substantial Improvement of Existing Park Infrastructure
Allocation:
$20,000,000
Statewide Bond Costs:
$150,000
Enacted/Proposed Total:
$19,190,000
Outyear Commitments:
$660,000
Balance:
$0
Chapter 8
Park Creation and Outdoor Access
PRC §94020
Allocation: Reduction of Climate Impacts and Creation, Protection and Expansion of Outdoor Recreation
Net Allocation: $198,500,000
Reduction of climate impacts on disadvantaged communities and vulnerable populations and the creation, protection, and expansion of outdoor recreation opportunities.
PRC §94020
Department: California Department of Fish and Wildlife
Purpose Type: Program Delivery
Chapter 8 PRC §94020
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Proposed
2026-27
3600-006-6093 (1)
2590
Budget Act
$1,750,000
Reduction of Climate Impacts, Expansion of Outdoor Recreation Opportunities
06/30/2027
06/30/2029
B1082PD
Program Delivery Proposed Total: $1,750,000
PRC §94020
Department: California State Parks
Purpose Type: Program Delivery
Chapter 8 PRC §94020
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3790-001-6093 (1)
2840
Budget Act
$1,000,000
Outdoor Recreation
06/30/2026
06/30/2028
B1127PD
Proposed
2026-27
3790-001-6093 (1)
2840
Budget Act
$1,000,000
Outdoor Recreation
06/30/2027
06/30/2029
B1127PD
Program Delivery Enacted Total: $1,000,000
Program Delivery Proposed Total: $1,000,000
PRC §94020
Department: Santa Monica Mountains Conservancy
Purpose Type: Program Delivery
Chapter 8 PRC §94020
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3810-005-6093 (1)
2940
Budget Act
$47,000
Reduction of Climate Impacts on Disadvantaged Communities & Expansion of Outdoor Recreation
06/30/2026
06/30/2028
B1139PD
Program Delivery Enacted Total: $47,000
PRC §94020
Department: California Department of Fish and Wildlife
Purpose Type: Projects
Chapter 8 PRC §94020
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3600-005-6093 (1)
2600
Budget Act
$10,000,000
Reduction of Climate Impacts, Expansion of Outdoor Recreation Opportunities
06/30/2028
06/30/2030
B1082PJ
Proposed
2026-27
3600-005-6093 (1)
2600
Budget Act
$18,250,000
Reduction of Climate Impacts, Expansion of Outdoor Recreation Opportunities
06/30/2029
06/30/2031
B1082PJ
Projects Enacted Total: $10,000,000
Projects Proposed Total: $18,250,000
PRC §94020
Department: California State Parks
Purpose Type: Projects
Chapter 8 PRC §94020
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3790-102-6093 (1)
2855036
Budget Act
$10,000,000
Former Airport Lands
06/30/2028
06/30/2030
B1127PJ
Enacted
2025-26
3790-102-6093 (1)
2855036
Budget Act
$5,500,000
Outdoor Recreation - Charles White Park
06/30/2028
06/30/2030
B1127PJ
Enacted
2025-26
3790-102-6093 (1)
2855036
Budget Act
$5,000,000
Outdoor Recreation - City of San Marcos Park Improvements
06/30/2028
06/30/2030
B1127PJ
Enacted
2025-26
3790-102-6093 (1)
2855036
Budget Act
$2,000,000
Outdoor Recreation - Don Fernando Pacheco Adobe Rehabilitation
06/30/2028
06/30/2030
B1127PJ
Enacted
2025-26
3790-102-6093 (1)
2855036
Budget Act
$16,200,000
Outdoor Recreation - Eaton Canyon Natural Area and Nature Center
06/30/2028
06/30/2030
B1127PJ
Enacted
2025-26
3790-102-6093 (1)
2855036
Budget Act
$500,000
Outdoor Recreation - Flat Top Park
06/30/2028
06/30/2030
B1127PJ
Enacted
2025-26
3790-102-6093 (1)
2855036
Budget Act
$4,300,000
Outdoor Recreation - Grove Neighborhood Park Project
06/30/2028
06/30/2030
B1127PJ
Enacted
2025-26
3790-102-6093 (1)
2855036
Budget Act
$5,000,000
Outdoor Recreation - Hollister Ranch - Pilot Program Environmental Impact Statement
06/30/2028
06/30/2030
B1127PJ
Enacted
2025-26
3790-102-6093 (1)
2855036
Budget Act
$15,000,000
Outdoor Recreation - Hollister Ranch Public Access Plan
06/30/2028
06/30/2030
B1127PJ
Enacted
2025-26
3790-102-6093 (1)
2855036
Budget Act
$5,000,000
Outdoor Recreation - Hughes Fire Recovery at Castaic Lake
06/30/2028
06/30/2030
B1127PJ
Enacted
2025-26
3790-102-6093 (1)
2855036
Budget Act
$5,000,000
Outdoor Recreation - Rosemead Park improvements
06/30/2028
06/30/2030
B1127PJ
Enacted
2025-26
3790-102-6093 (1)
2855036
Budget Act
$22,000,000
Outdoor Recreation - Sepulveda Basin Park Cleanup
06/30/2028
06/30/2030
B1127PJ
Enacted
2025-26
3790-102-6093 (1)
2855036
Budget Act
$10,000,000
Reduction of Climate Impacts, Expansion of Outdoor Recreation Opportunities
06/30/2028
06/30/2030
B1127PJ
Proposed
2026-27
3790-004-6093 (1)
2840
Budget Act
$4,866,000
Open Space Lands Surrounding the Former Sonoma Development Center
06/30/2032
06/30/2034
B1127PJ
Projects Enacted Total: $105,500,000
Projects Proposed Total: $4,866,000
PRC §94020
Department: Santa Monica Mountains Conservancy
Purpose Type: Projects
Chapter 8 PRC §94020
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3810-105-6093 (1)
2945
Budget Act
$2,000,000
Randall Preserve - Reduction of Climate Impacts, Expansion of Outdoor Recreation
06/30/2028
06/30/2030
B1139PJ
Projects Enacted Total: $2,000,000
Summary for PRC §94020 - Reduction of Climate Impacts and Creation, Protection and Expansion of Outdoor Recreation
Allocation:
$200,000,000
Statewide Bond Costs:
$1,500,000
Enacted/Proposed Total:
$144,413,000
Outyear Commitments:
$5,520,000
Balance:
$48,567,000
Chapter 8
Park Creation and Outdoor Access
PRC §94030
Allocation: Enhancement of the Natural Resource Value and Expanded Trail Access (non-motorized)
Net Allocation: $99,250,000
Protection, restoration, and enhancement of the natural resource values of the state park system and for projects to expand recreational opportunities and public access to state and public park nonmotorized trails. Projects may include enhancing and expanding existing trails and creating new trails.
PRC §94030
Department: State Coastal Conservancy
Purpose Type: Program Delivery
Chapter 8 PRC §94030
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3760-001-6093 (1)
2805032
Budget Act
$700,000
Enhancement of the Natural Resource Value and Expanded Trail Access
06/30/2026
06/30/2028
B1113PD
Proposed
2026-27
3760-001-6093 (1)
2790
Budget Act
$700,000
Great Redwood Trail
06/30/2027
06/30/2029
B1113PD
Program Delivery Enacted Total: $700,000
Program Delivery Proposed Total: $700,000
PRC §94030
Department: Wildlife Conservation Board
Purpose Type: Projects
Chapter 8 PRC §94030
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3640-107-6093 (1)
2710
Budget Act
$5,000,000
Enhancement of the Natural Resource Value and Expanded Trail Access - 40 Acre Conservation League
06/30/2028
06/30/2030
B1097PJ
Projects Enacted Total: $5,000,000
PRC §94030
Department: State Coastal Conservancy
Purpose Type: Projects
Chapter 8 PRC §94030
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3760-102-6093 (1)
2805032
Budget Act
$3,000,000
Environmental Restoration in the Eel River Canyon
06/30/2028
06/30/2030
B1113PJ
Enacted
2025-26
3760-102-6093 (1)
2805032
Budget Act
$41,350,000
Great Redwood Trail Project
06/30/2028
06/30/2030
B1113PJ
Enacted
2025-26
3760-102-6093 (1)
2805032
Budget Act
$650,000
Master Plan for Great Redwood Trail Project
06/30/2028
06/30/2030
B1113PJ
Enacted
2025-26
3760-102-6093 (1)
2805032
Budget Act
$5,000,000
Preservation of Tribal Cultural Resources along Great Redwood Trail
06/30/2028
06/30/2030
B1113PJ
Projects Enacted Total: $50,000,000
Summary for PRC §94030 - Enhancement of the Natural Resource Value and Expanded Trail Access (non-motorized)
Allocation:
$100,000,000
Statewide Bond Costs:
$750,000
Enacted/Proposed Total:
$56,400,000
Outyear Commitments:
$1,699,000
Balance:
$41,151,000
Chapter 8
Park Creation and Outdoor Access
PRC §94040
Allocation: Deferred Maintenance
Net Allocation: $173,688,000
Implement projects to address the department’s backlog of deferred maintenance.
PRC §94040
Department: California State Parks
Purpose Type: Program Delivery
Chapter 8 PRC §94040
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3790-001-6093 (1)
2840
Budget Act
$400,000
Deferred Maintenance
06/30/2026
06/30/2028
B1124PD
Proposed
2026-27
3790-001-6093 (1)
2840
Budget Act
$400,000
Deferred Maintenance
06/30/2027
06/30/2029
B1124PD
Program Delivery Enacted Total: $400,000
Program Delivery Proposed Total: $400,000
PRC §94040
Department: California State Parks
Purpose Type: Projects
Chapter 8 PRC §94040
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3790-002-6093 (1)
2840
Budget Act
$84,000,000
Deferred Maintenance
06/30/2028
06/30/2030
B1124PJ
Projects Enacted Total: $84,000,000
Summary for PRC §94040 - Deferred Maintenance
Allocation:
$175,000,000
Statewide Bond Costs:
$1,312,000
Enacted/Proposed Total:
$84,800,000
Outyear Commitments:
$1,325,000
Balance:
$87,563,000
Chapter 8
Park Creation and Outdoor Access
PRC §94050
Allocation: Nature Education Facilities
Net Allocation: $24,813,000
Grants may be used for buildings, equipment, structures, and exhibit galleries that present collections to promote climate, biodiversity, and cultural literacy. Projects may support species recovery and biodiversity protection in order to advance the state’s 30x30 conservation goal.
PRC §94050
Department: Secretary for Natural Resources
Purpose Type: Program Delivery
Chapter 8 PRC §94050
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
0540-001-6093 (1)
0320
Budget Act
$400,000
Nature, Climate Education, and Research Facility Grants
06/30/2026
06/30/2028
B1008PD
Proposed
2026-27
0540-001-6093 (1)
0320
Budget Act
$135,000
Nature, Climate Education, and Research Facility Grants
06/30/2027
06/30/2029
B1008PD
Program Delivery Enacted Total: $400,000
Program Delivery Proposed Total: $135,000
PRC §94050
Department: Secretary for Natural Resources
Purpose Type: Projects
Chapter 8 PRC §94050
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
0540-101-6093 (1)
0320
Budget Act
$10,000,000
California Academy of Sciences Natural Science Collection Digitization
06/30/2028
06/30/2030
B1008PJ
Enacted
2025-26
0540-101-6093 (1)
0320
Budget Act
$5,000,000
Discovery Cube
06/30/2028
06/30/2030
B1008PJ
Enacted
2025-26
0540-101-6093 (1)
0320
Budget Act
$1,000,000
UC Davis Integrative Center for Alternative Meat and Protein
06/30/2028
06/30/2030
B1008PJ
Enacted
2025-26
0540-101-6093 (1)
0320
Budget Act
$1,000,000
Wolf Museum of Exploration and Innovation - Interactive Water Exhibit
06/30/2028
06/30/2030
B1008PJ
Proposed
2026-27
0540-101-6093 (1)
0320
Budget Act
$6,198,000
Nature, Climate Education, and Research Facility Grants
06/30/2029
06/30/2031
B1008PJ
Projects Enacted Total: $17,000,000
Projects Proposed Total: $6,198,000
Summary for PRC §94050 - Nature Education Facilities
Allocation:
$25,000,000
Statewide Bond Costs:
$187,000
Enacted/Proposed Total:
$23,733,000
Outyear Commitments:
$540,000
Balance:
$540,000
Summary for Chapter 8: Park Creation and Outdoor Access
Allocation:
$700,000,000
Statewide Bond Costs:
$5,249,000
Enacted/Proposed Total:
$501,246,000
Outyear Commitments:
$15,684,000
Balance:
$177,821,000
Enacted:
$466,047,000
Proposed:
$35,199,000
Chapter 9
Clean Air
PRC §94520
Allocation: Public Financing of Clean Energy Transmission Projects
Net Allocation: $322,563,000
Public financing of clean energy transmission projects that are necessary to meet the state’s clean energy goals to reduce or offset ratepayer costs associated with the public benefits of transmission projects.
PRC §94520
Department: California Infrastructure and Economic Development Bank
Purpose Type: Projects
Chapter 9 PRC §94520
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Proposed
2026-27
0509-611-6093
0235028
Special Legislation
$322,563,000
Public Financing of Clean Energy Transmission Projects
B1050PJ
Projects Proposed Total: $322,563,000
Summary for PRC §94520 - Public Financing of Clean Energy Transmission Projects
Allocation:
$325,000,000
Statewide Bond Costs:
$2,437,000
Enacted/Proposed Total:
$322,563,000
Outyear Commitments:
$0
Balance:
$0
Chapter 9
Clean Air
PRC §94530
Allocation: Long-Duration Energy Storage Program
Net Allocation: $49,625,000
Grants or loans to support the Long-Duration Energy Storage Program. Eligible uses may also include zero-emissions distributed energy backup assets, virtual power plants, and demand side grid support.
PRC §94530
Department: Energy Resources Conservation and Development Commission
Purpose Type: Program Delivery
Chapter 9 PRC §94530
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3360-002-6093 (1)
2390028
Budget Act
$497,000
Long-Duration Energy Storage, Distributed Electricity Backup Assets, and Demand Side Grid Support Program
06/30/2028
06/30/2030
B1045PD
Proposed
2026-27
3360-002-6093 (1)
2390028
Budget Act
$497,000
Long-Duration Energy Storage, Distributed Electricity Backup Assets, and Demand Side Grid Support Program
06/30/2027
06/30/2029
B1045PD
Program Delivery Enacted Total: $497,000
Program Delivery Proposed Total: $497,000
PRC §94530
Department: Energy Resources Conservation and Development Commission
Purpose Type: Projects
Chapter 9 PRC §94530
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3360-102-6093 (1)
2390028
Budget Act
$46,144,000
Distributed Electricity Backup Assets Program
06/30/2028
06/30/2030
B1045PJ
Inactive
2025-26
3360-102-6093 (1)
2390028
Budget Act
$0
Distributed Electricity Backup Assets Program - State Cost Sharing for Water Utility Projects
06/30/2028
06/30/2030
B1045PJ
Projects Enacted Total: $46,144,000
Summary for PRC §94530 - Long-Duration Energy Storage Program
Allocation:
$50,000,000
Statewide Bond Costs:
$375,000
Enacted/Proposed Total:
$47,138,000
Outyear Commitments:
$1,989,000
Balance:
$498,000
Chapter 9
Clean Air
PRC §94540
Allocation: Development of offshore wind generation
Net Allocation: $471,438,000
To support any of the following activities related to the development of offshore wind generation:
(1) Construction of publicly owned port facilities for manufacturing, assembly, staging, and integration of entitlements and components for offshore wind generation.
(2) Expansion and improvement of public port infrastructure to accommodate vessels involved in the installation, maintenance, and operation of offshore wind generation.
(3) Upgrades to port facilities.
PRC §94540
Department: Energy Resources Conservation and Development Commission
Purpose Type: Program Delivery
Chapter 9 PRC §94540
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3360-003-6093 (1)
2380010
Budget Act
$2,500,000
Development of Port Facilities and Infrastructure for Offshore Wind Generation
06/30/2028
06/30/2030
B1046PD
Proposed
2026-27
3360-003-6093 (1)
2380010
Budget Act
$2,500,000
Development of Port Facilities and Infrastructure for Offshore Wind Generation
06/30/2027
06/30/2029
B1046PD
Program Delivery Enacted Total: $2,500,000
Program Delivery Proposed Total: $2,500,000
PRC §94540
Department: Energy Resources Conservation and Development Commission
Purpose Type: Projects
Chapter 9 PRC §94540
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3360-103-6093 (1)
2380010
Budget Act
$225,719,000
Development of Port Facilities and Infrastructure for Offshore Wind Generation
06/30/2028
06/30/2030
B1046PJ
Projects Enacted Total: $225,719,000
Summary for PRC §94540 - Development of offshore wind generation
Allocation:
$475,000,000
Statewide Bond Costs:
$3,562,000
Enacted/Proposed Total:
$230,719,000
Outyear Commitments:
$10,000,000
Balance:
$230,719,000
Summary for Chapter 9: Clean Air
Allocation:
$850,000,000
Statewide Bond Costs:
$6,374,000
Enacted/Proposed Total:
$600,420,000
Outyear Commitments:
$11,989,000
Balance:
$231,217,000
Enacted:
$274,860,000
Proposed:
$325,560,000
Chapter 10
Statewide Bond Costs
PRC §90135 and 95011
Allocation: Statewide bond costs shared proportionally by each program funded through this division.
Net Allocation: $75,000,000
Statewide bond costs including costs to issue bonds, fees from DOF, STO and SCO, audit costs, publishing of programs and projects to the Natural Resources Agency website.
PRC §90135 and 95011
Department: Secretary for Natural Resources
Purpose Type: Statewide Bond Costs
Chapter 10 PRC §90135 and 95011
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
0540-003-6093 (1)
0320
Budget Act
$562,000
Statewide Bond Costs
06/30/2026
06/30/2028
B1009SB
Proposed
2026-27
0540-003-6093 (1)
0320
Budget Act
$1,067,000
Statewide Bond Costs
06/30/2027
06/30/2029
B1009SB
Statewide Bond Costs Enacted Total: $562,000
Statewide Bond Costs Proposed Total: $1,067,000
PRC §90135 and 95011
Department: California State Parks
Purpose Type: Statewide Bond Costs
Chapter 10 PRC §90135 and 95011
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3790-009-6093 (1)
2840
Budget Act
$1,190,000
Statewide Bond Costs
06/30/2026
06/30/2028
B1125SB
Proposed
2026-27
3790-009-6093 (1)
2840
Budget Act
$1,415,000
Statewide Bond Costs
06/30/2027
06/30/2029
B1125SB
Statewide Bond Costs Enacted Total: $1,190,000
Statewide Bond Costs Proposed Total: $1,415,000
PRC §90135 and 95011
Department: Department of Water Resources
Purpose Type: Statewide Bond Costs
Chapter 10 PRC §90135 and 95011
Status
Enactment Year
Item #
Budget Program/
Project Number
Source
Appropriation Amount
Name of Appropriation
Encumbrance Date
Liquidation Date
Last Reappropriated by
Agency Use
Enacted
2025-26
3860-005-6093 (1)
3230
Budget Act
$246,000
Statewide Bond Costs
06/30/2026
06/30/2028
B1194SB
Proposed
2026-27
3860-005-6093 (1)
3230
Budget Act
$251,000
Statewide Bond Costs
06/30/2027
06/30/2029
B1194SB
Statewide Bond Costs Enacted Total: $246,000
Statewide Bond Costs Proposed Total: $251,000
Summary for Chapter 10: Statewide Bond Costs
Allocation:
$75,000,000
Enacted/Proposed Total:
$4,731,000
Outyear Commitments:
$17,258,000
Balance:
$53,011,000
Enacted:
$1,998,000
Proposed:
$2,733,000
Statewide Summary:
Allocation:
$10,000,000,000
Enacted:
$3,472,916,000
Proposed:
$2,106,290,000
Outyear Commitments:
$275,415,000
Balance:
$4,145,379,000
Total Statewide Bond Cost:
$75,000,000